PROJECT

ENERGY EFFICIENCY IMPROVEMENT BY UPGRADATION OF C&I SYSTEM IN UNITS 1 TO 6 AT


WANAKBORI SITE. REF: P.O. WTPS/O&M/C&I/Up-grad/supply/127/1667 Dated 10.03.2011 SALE
ORDER NO: - 236010824

S.NO UNIT PARAMETERS TIME OF NOT WORKING TAKE WORK ACTION PLAN.
.
1 # `1  Silica  Last 7 to 8 days max. 1. We are work on it
 Hydrazin working and on 9 feb max that
 Hydrazin properly . problem will be
e  .1 Do2 working but solved.
some issue on 2. Hydrazine will
sample line please working ok .need
 Do2 check pic.1 calibration.
3. Do2 we are check
sample line of Do2
lots of oil and coal
particals come on
sample. Please
check picture
attached with file.

2 #2  Silica  Last 5 months.due 1. We are working on


to unavailability of that . impuritys on
optical unit. sample due to that
sample block on
tubes. We are also
inform IMD 1 DE ,
 Hydrazine working EE .
 Hydrazi healthy . output 4 - 2. We are work on that.
ne 20 issue.
 Output issue. Do2
membran damage
and rusting on 3. Due to sample issue
sensor due to we are Enable to
 Do2 sample impurity. resolve that problem.

3 #3  Silica  Silica out due to 1. Silica reagents


reagent we are replacement work
replaced. And its out done . some issue on
last 7 to 8 days . calibration factor we
 Hydrazin power are work on that .
 Hydrazin supply card fault due 2. Hydrazine power card
e to that hydrazine issue . we will work
transmitter will be on that
 D02 off on last 9 days. 3. Do2 sample are
 Do2 working impure pleas improve
properly. sample .
PROJECT
ENERGY EFFICIENCY IMPROVEMENT BY UPGRADATION OF C&I SYSTEM IN UNITS 1 TO 6 AT
WANAKBORI SITE. REF: P.O. WTPS/O&M/C&I/Up-grad/supply/127/1667 Dated 10.03.2011 SALE
ORDER NO: - 236010824