CHECKLIST FOR ON-SITE INSPECTION


ACTIVITY: HACKING
Project: Date:
Location:
NOTE:- Please  appropriate box or enter readings as per requirements
SN DESCRIPTION YES NO NA REMARKS/CLARIFICATIONS
PRE EXECUTION CHECKS

Is the area to be hacked clean from any debris, cement slurry


or dirt ?
Are the following available:
1 [ ] [ ] [ ]
a) Safety goggles
b) Hand gloves
c) Measuring tape/ scale

2 1 day curing has done for the surface to be hacked. [ ] [ ] [ ]

3 Are the required tools for hacking available at the site ? [ ] [ ] [ ]

CHECKS DURING EXECUTION

4 Is safe step ladders or safe staging available for hacking. [ ] [ ] [ ]

5 Is scaffolding erected for outdoor hacking at higher level. [ ] [ ] [ ]

6 Is the hacking uniform throughout ? [ ] [ ] [ ]

7 Are there approximately 80 indents per sft ? [ ] [ ] [ ]

Are all the hacking indents approximately 25mm (1") in length


8 [ ] [ ] [ ]
and not more than 2 to 3mm in depth ?
Is hacking being done for all the concrete surfaces (like beam
9 sides, beam soffit, ceiling, columns, chejja bottom, nib [ ] [ ] [ ]
columns, lintel sides and lintel bottom near openings) ?
10 Is cross stitching being done while hacking ? [ ] [ ] [ ]

Is the person doing the job wearing the following PPE's ?


a) Safety goggles
11 [ ] [ ] [ ]
b) Safety mask
c) Hand gloves

POST EXECUTION CHECKS


Is the hacked surface thoroughly cleaned after the hacking is
12 [ ] [ ] [ ]
over ?
Has splatter dash (cement mortar 1:3) work been done at all
13 [ ] [ ] [ ]
the masonry work - concrete structure junctions ?
Has the splatter dash been cured for a minimum period of 3
14 [ ] [ ] [ ]
days ?

Checked by: Approved by:

Name : Name:
Sign: Sign:
Date: Date: