Sobha Limited

CHECKLIST FOR ON-SITE INSPECTION


ACTIVITY: INTERNAL PAINTING
Project: Date:
Location:
NOTE:- Please  appropriate box or enter readings as per requirements
SN DESCRIPTION YES NO NA REMARKS/CLARIFICATIONS
1 Name, date and number of the drawing
GENERAL CHECKS

2 Are the latest relevant GFC drawings (if any) available ? [ ] [ ] [ ]


3 The plastered surface has been cured properly. [ ] [ ] [ ]
4 Are the required tools for painting available at site ? [ ] [ ] [ ]
Checking of the expiry dates done for all the paint cans,
5 [ ] [ ] [ ]
thinners and allied materials, brought by the contractors.
Is there any dampness on the walls that have to be
6 [ ] [ ] [ ]
painted ?
PRE EXECUTION CHECKS

7 Are the broken corners and edges repaired ? [ ] [ ] [ ]


The shade and the type of paint has been approved and
8 [ ] [ ] [ ]
certified by the architect.
Is the quality and specification of materials as per
9 [ ] [ ] [ ]
requirement ?
10 Scaffolding arrangement has been done for painting. [ ] [ ] [ ]
Have the doors, windows, floor and electrical switch boxes
11 [ ] [ ] [ ]
properly covered.
12 Has the surface to be painted thoroughly cleaned ? [ ] [ ] [ ]
The flooring, tiling and marble & granite works have been
13 covered with polythene sheet and a layer of low quality [ ] [ ] [ ]
POP laid on top of it.
Fixing of windows grills, balcony grills and other MS
14 [ ] [ ] [ ]
fixtures completed and protected with polythene sheet.
Are the edges, corners & door jamb corners at project right
15 [ ] [ ] [ ]
angles ?
Are the edges and corners of a room to be painted free
16 [ ] [ ] [ ]
from any undulations ?

17 Are there any touch up works to be done before painting ? [ ] [ ] [ ]

CHECKS DURING EXECUTION

Has the mixing of paint (color tone) been done


18 [ ] [ ] [ ]
electronically ?
Readymade putty is being applied 24 hours after applying
19 the primer and sanded properly with a 180 or 220 micron [ ] [ ] [ ]
sand paper.
The second layer of putty applied after the first layer has
20 [ ] [ ] [ ]
dried ?
Wiping of dust from the surface done after sanding the
21 putty surface using a 220 micron sand paper is being [ ] [ ] [ ]
properly done.
22 Any undulations on the second putty surface. [ ] [ ] [ ]
23 Is the surface to be painted completely dry ? [ ] [ ] [ ]
Has the first coat of painting been applied & finished with a
24 [ ] [ ] [ ]
roller.
Is the demarcation line at the ceiling & wall junctions
25 [ ] [ ] [ ]
looking sharp ?
Sharp edges and lines not ensured with proper usage of
26 [ ] [ ] [ ]
masking tape.
POST EXECUTION CHECKS

Is there any overlapping of colors seen ? (this could appear


27 [ ] [ ] [ ]
due to interruptions during painting in a given area).

Are all the corners and edges of the painted surface in


28 [ ] [ ] [ ]
perfect level and plumb ?
29 Are there any brush marks seen on the wall or ceiling ? [ ] [ ] [ ]

Checked by: Approved by:

Name : Name:
Sign: Sign:
Date: Date:

1 of 1 10/02/2015
Sobha Limited

CHECKLIST FOR ON-SITE INSPECTION


ACTIVITY:EXTERNAL PAINTING
Project: Date:
Location:
NOTE:- Please  appropriate box or enter readings as per requirements
SN DESCRIPTION YES NO NA REMARKS/CLARIFICATIONS
GENERAL CHECKS
1 Are the latest relevant GFC drawings (if any) available ? [ ] [ ] [ ]
2 The plastered surface has been cured properly. [ ] [ ] [ ]
3 Are the required tools for painting available at site ? [ ] [ ] [ ]
Checking of the expiry dates done for all the paint cans,
4 [ ] [ ] [ ]
thinners and allied materials, brought by the contractors.
Is there any dampness on the walls that have to be painted
5 [ ] [ ] [ ]
?
PRE EXECUTION CHECKS

6 Are the broken corners and edges repaired ? [ ] [ ] [ ]


The shade and the type of paint has been approved and
7 [ ] [ ] [ ]
certified by the architect.
Is the quality and specification of materials as per
8 [ ] [ ] [ ]
requirement ?
9 Scaffolding arrangement has been done for painting. [ ] [ ] [ ]
10 Has the surface to be painted thoroughly cleaned ? [ ] [ ] [ ]
Fixing of windows grills, balcony grills and other MS fixtures
11 [ ] [ ] [ ]
completed and protected with polythene sheet.

12 Are the edges, corners at project right angles ? [ ] [ ] [ ]

13 Are there any touch up works to be done before painting ? [ ] [ ] [ ]

CHECKS DURING EXECUTION


Has the mixing of paint (color tone) been done
14 [ ] [ ] [ ]
electronically ?
The first texture coating of the required specification
15 applied on the external walls after primer has dried [ ] [ ] [ ]
completely.
A gap of 10 days maintained between the two texture
16 [ ] [ ] [ ]
coatings.
Texture/ bubble paint of approved type applied equally all
17 [ ] [ ] [ ]
over the surface, structure problems.
POST EXECUTION CHECKS

Is there any overlapping of colors seen ? (this could appear


18 [ ] [ ] [ ]
due to interruptions during painting in a given area).

Are all the corners and edges of the painted surface in


19 [ ] [ ] [ ]
perfect level and plumb ?
20 Are there any brush marks seen on the wall or ceiling ? [ ] [ ] [ ]

Checked by: Approved by:

Name : Name:
Sign: Sign:
Date: Date:

1 of 1 10/02/2015