NOMENCLATURE

BE-3
(50 TPH)

RCC PEDESTAL DETAIL POCKET DETAIL FOR J-BOLT

CC-3
50TPH

TEMPLATE DETAIL

LOAD-0.6 TON LOAD-0.6 TON LOAD-0.7 TON LOAD-0.7 TON


EACH PEDESTAL EACH PEDESTAL

FOR CC5 CONVEYOR SUPPORT FOR CC2 CONVEYOR SUPPORT

CATWALK LOCKING
WITH TOWER TYPICAL CATWALK STRUCTURE DEPTH OF PEDESTAL AS PER CLIENT CIVIL ENGINEER
OB. GOAL POST OB. GOAL POST
FOR OVERHEAD CONVEYOR
RSPL SCOPE
OB. GOAL POST
OB. GOAL POST
ROOF SHEET ROOF SHEET

LADDER
WITH CAGE GOAL POST
GOAL POST
GOOSE VENT
GOOSE VENT
TOWER LOCKING
TOP WITH TOWER
PLATFORM

ROOF ROOF
ROOF MANHOLE LADDER MANHOLE
LADDER WITH CAGE

TOP TOP
PLATFORM PLATFORM

TOWER LOCKING
WITH TOWER BE-1
(50 TPH)

BE-4
(25 TPH)
TOWER LOCKING
WITH TOWER DRUM SIEVE
(50 TPH)

CLEANER
(50 TPH)
ON LINE WEIGHING
SCALE (25 TPH)
INTERMEDIATE INTERMEDIATE
PLATFORM PLATFORM ON LINE WEIGHING
BE-2 SCALE (50 TPH)
(50 TPH)

TOWER LOCKING 1940

WITH TOWER
1500

CC-2
(50 TPH)
CC-7 CC-6
25TPH 25TPH CC-5
25TPH

WALL WALL
MANHOLE MANHOLE

HOPPER
CONTROL PANEL INTAKE HOPPER
50TPH

CC-4
25TPH
CUTOUT OPENING SIZE
750(H)X750(W) CC-1
(50 TPH)

PROCESS FLOW

BASE PLATE

ANCHOR J- BOLT

STAIR CASE
ROSTFREI STEELS
STORAGE TANKS

CLIENT M/s. APPLE & PEARS LTD.

PROJECT NIGERIA

04 07.02.18 AS PER CLIENT COMMENTS DK SP

03 03.02.18 AS PER CLIENT COMMENTS DK SP DRAWN DINESH 07.02.18 SCALE TITLE


SILO EQUIPMENT SECTION DETAILS &
02 01.02.18 INTAKE POSITION CHANGED DK SP DESIGNED SUMIT 07.02.18 MATERIAL HANDLING SYSTEM
WEIGHT Kg
1 18.01.18 REFERENCE LEVEL REVISED DK SP CHECKED SUMIT 07.02.18
REV. SHEET OF
REV. DATE DESCRIPTION BY APPD. APPROVED KK 07.02.18
SIZE A1 DRAWING NO. RSPL-FBS-APL-EMG-102-4
4 1 1

You might also like