Cable Layout Elevattion (Apple & Pears)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

BE-3

(50 TPH)

CT-50

CC-3
50TPH

CT-130 CT-130

CT-300

LEVEL LEVEL
SENSOR SENSOR

BE-1
CONDUIT PIPE (50 TPH)

CT-130
BE-4 CT- 50 CT- 50
(25 TPH)

DRUM SIEVE
(50 TPH)
BLOWER
CONDUTE PIPE
40 MM CT-80

CLEANER
(50 TPH)
ON LINE WEIGHING
SCALE (25 TPH)
ON LINE WEIGHING
SCALE (50 TPH) CT-80
BE-2 CYCLON
RAV
(50 TPH)

1940

CONDUTE PIPE 1500

CC-2
(50 TPH)
CC-7 CC-6
25TPH 25TPH CC-5
25TPH

CT-80

CT-1200

CT-200

CT- 80 CT- 80
(BLOWER) LEVEL
LEVEL (BLOWER) CT-1600 CT-80
SENSOR
SENSOR
CT- 200

CT-150

CONTROL PANEL

CT- 400 CC-4


25TPH CC-1
(50 TPH)

ELEVATION

ROSTFREI STEELS
STORAGE TANKS

CLIENT M/s. APPLE & PEARS LTD.

PROJECT NIGERIA

DRAWN DINESH 07.03.18 SCALE TITLE


CABLING LAYOUT (ELEVATION)
DESIGNED SUMIT 07.03.18
WEIGHT Kg
CHECKED BKD 07.03.18
REV. SHEET OF
REV. DATE DESCRIPTION BY APPD. APPROVED KK 07.03.18
SIZE A1 DRAWING NO. RSPL-FBS-APL-CLAY-103-0
0 1 1

You might also like