High Powered Committee for Integrated Development of Bagmati Civilization

Guheswori Phant, Kathmandu

Package No : BAPIDP-05/069/070
Name of Structure: Level Crossing including River Protection Works at Dhobi Khola/Bagmati Confluence
Quantity Estimate

S.N Description of Work Unit No Length Breadth Height Quantity Remarks

2 Earthwrok Excavation Cum 1 6.5 Area 124 806

3 M15 PCC Work for Approach Concrete Cum 1 48.9 Area 0.99 48.41

4 M20 RCC for PCC Work


Foundation Pile
Pile Cum 16 Area 0.28 20.00 89.60
Ream Cum 16 1.88 Area 0.125 3.76
Cap Cum 4 6.3 0.9 0.9 20.41
Base of Drain Cum 1 49.10 6.30 0.20 61.87
Wall of Drain Cum 1 48.90 0.30 1.00 14.67
Bencing at Drain Cum 2 48.9 Area 0.05 4.40
Cover of Drain Cum 1 48.90 2.35 0.10 4.89
Total 199.60
5 Forwork
Outer Wall Sqm 2 48.90 1.10 107.58
Inner Wall Sqm 2 48.90 1.10 107.58
Cover Sqm 1 48.9 2.03 99.27
Bottom of Cap Sqm 4 6.30 0.90 22.68
Edge of Cap Sqm 8 0.90 0.90 6.48
Side of Cap Sqm 8 6.30 0.90 45.36
Total 388.95
6 Reinforcement Bar as per bar schedule Kgs 1 26440.00
7 12.5mm thick Plaster 1:4
Inner Surface Sqm 1 48.90 3.60 176.04

8 Piling Works Rm 16 20.00 320.00

9 3mx1mx1m Launching Apron Gabion Works


U/S Cum 1 40.00 6.00 1.00 240.00
D/S Cum 1 40.00 9.00 1.00 360.00
Below Drain Cum 1 45.00 6.00 1.00 270.00
Total 870.00
Rate Analysis

Description of Item : Boring, Providing and installing bored cast-in-situ RCC pile of specified diameter including bentonite as per
specification and drawing etc all complete for 600 mm dia.
Item Labour (A) Material & Equipment (B)
Rate Amount Amount Remarks
No. Type Unit Qty. Type Unit Qty. Rate (Rs)
(Rs) (Rs) (Rs)
District Rate SL md 0.29 650.00 188.50 Diesel Lit 0.000 92.92 0.00
SSL md 0.91 650.00 591.50 Bentonite Kg 0.000 9.20 0.00
Boring Equipment with
UL md 4.26 475.00 2,023.50 Pump & all Asseseries
hr 0.4 1,600.00 640.00
Crane for handling
reinforcement cage and hr 0.26 3,100.00 806.00
tremie pipe
Labour Component (A) 2,803.50 Material & Equipment Component (B) 1,446.00 Page 63
RATE PER
Total = A+B = NRs. 4,249.50
Overhead Misc. Expenditure of 15 % = NRs. 637.43
Grand Total = NRs. 4,886.93
Rate per meter = NRs. 4,886.93
High Powered Committee for Integrated Development of Bagmati Civilization
Guheswori Phant, Kathmandu

Package No : BAPIDP-05/069/070
Name of Structure: Level Crossing including River Protection Works at Dhobi Khola/Bagmati Confluence

Quantity Estimate

Length Breadth Height


S.N Description of Work No Quantity Unit Remarks
(m) (m) (m)
1 Earthwrok Excavation 1 40 C/S Area 40 1600 Cum Area from ACad

2 Stone Soling
Right Bank 1 2.60 3.55 0.40 1.04 3.69
Left Bank 1 2.60 3.55 0.40 1.04 3.69
River Bed 1 40.00 17.60 0.40 16.00 281.60
Pile Capping -2 6.30 0.90 0.40 -5.04 -4.54
Total 13.04 Cum 284.45

3 M15 PCC Work


Right Bank 1 2.60 3.55 0.20 0.52
Left Bank 1 2.60 3.55 0.20 0.52
Approach Concrete 1 48.90 Tr. Area 0.99 48.41
U/S Concrete appron 1 40.00 6.00 0.40 96.00
D/S Concrete appron 1 40.00 9.00 0.40 144.00
Energy Decipator 1 40.00 0.30 0.30 3.60
50 0.50 0.30 0.30 2.25
Deduction of pile cap -4 1.85 0.90 0.20 -1.33
Total 293.97 Cum
4 M20 RCC for PCC Work
Foundation Pile
Pile 16 Area 0.28 20.00 89.60
Ream 16 1.88 Area 0.125 3.76
Cap 4 6.3 0.9 0.9 20.41
Base of Drain 1 49.10 6.30 0.20 61.87
Wall of Drain 1 48.90 0.30 1.00 14.67
Benching at Drain 2 48.9 Area 0.05 4.40
Cover of Drain 1 48.90 2.41 0.10 4.89
Cutoff Wall 4 40.00 Trap Area 0.72 115.20
Total 314.80 Cum
5 Form work
Outer Wall 2 48.90 1.10 107.58
Inner Wall 2 48.90 1.10 107.58
Cover 1 48.90 2.08 101.47
Bottom of Cap 4 6.30 0.90 22.68
Edge of Cap 8 0.90 0.90 6.48
Side of Cap 8 6.30 0.90 45.36
Energy Decipator 50 1.60 0.30 24.00
1 40.00 0.60 24.00
Edge of Concrete Apron 2 48.00 0.40 38.40
Total 477.55 Sqm
6 Reinforcement Bar as per bar schedule 1 29835.55 Kgs
7 12.5mm thick Plaster 1:4
Inner Surface 1 48.90 6.08 297.07 Sqm

8 Piling Works 16 20.00 320.00 Rm

9 2mx1mx1m Launching Apron Gabion Works


High Powered Committee for Integrated Development of Bagmati Civilization
Guheswori Phant, Kathmandu

Package No : BAPIDP-05/069/070
Name of Structure: Level Crossing including River Protection Works at Dhobi Khola/Bagmati Confluence

Quantity Estimate

Length Breadth Height


S.N Description of Work No Quantity Unit Remarks
(m) (m) (m)
U/S 1 40.00 4.00 1.00 160.00
D/S 1 40.00 6.00 1.00 240.00
Total 400.00 Cum
Reinforment Bar Scheldule
S.N Code Dia of bar Nos Length Hook Total LUnity Weight Weight(Kg)
1 A1 25 3 6.15 0.4 19.65 3.855 75.75
2 A2 20 4 6.15 0.8 27.8 2.467 68.58
3 A3 25 3 6.15 1 21.45 3.855 82.69
4 A4 20 4 6.15 1 28.6 2.467 70.56
5 A5 16 4 6.15 0.2 25.4 1.579 40.11
6 A6 12 20 2.95 0.4 67 0.888 59.5
7 A7 12 21 4.9 0.8 119.7 0.888 106.29
8 A8 25 12 49.5 0.24 596.9 3.855 2300.97
9 A9 25 12 49.5 0.24 596.9 3.855 2300.97
10 A10 12 198 2.7 0.4 613.8 0.888 545.05
11 A11 12 198 6.285 0.52 1347 0.888 1196.48
12 A12 12 198 6.39 0.52 1368 0.888 1214.94
13 A13 12 8 49.5 0 396 0.888 351.65
14 A14 12 8 49.5 0 396 0.888 351.65
15 A15 12 8 2.1 1 24.8 0.888 22.02
16 A16 12 10 2.1 1 31 0.888 27.53
17 A17 12 10 49.5 0 495 0.888 439.56
18 A18 12 198 49.5 0 9801 0.888 8703.29
19 A19 12 198 49.5 0 9801 0.888 8703.29
20 A20 12 396 1.2 0.15 534.6 0.888 474.72
21 A21 12 20 40 0.3 806 0.888 715.73
22 A22 10 200 4.438 0.2 927.6 0.888 823.71
23 Pile 25 10 20.9 0.4 213 3.855 821.12
24 Pile 12 210 1.42 0.4 382.2 0.888 339.39
29835.55