Doc ID: 3DIT-AS-7.1.

5
3D Iron Technologies Issue No./Date: 01/ 27-03-2023

Prepared By: Mr. Mohd Azad


Break Down Maintenance Report
Approved by: Mrs. Hima Goyal

CNC Turner machine (3DIT/MC/01)

S. Date Dept. Break Down Containment Root Cause Corrective Action Total Time of Date of Sign.
No Observed Action Break Down Correction
Analysis

1 07/05/23 Production Battery used for Switch of machine Due to continue Change the battery 2 hours 07/05/23
machine data power failure
storage machine battery got
discharge
05/06/23 Production Switch of machine One of the axial fans Change the entire cooling
2 Cooling system of stops working hence unit including the display
the machine stop machine not able to which shows temperature 24 hours
working maintain required range 06/06/23
working
temperature.