Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

CURRICULUM VITAE

Abhishek Dubey
(Professional Water Experience)
Location: 145B/13U Salori Prayagraj (U.P.), Pin Code-211004
Telephone: +91-9838002014
Email: abhidubeyme@gmail.com

Professional profile
To secure a position where, I can efficiently add my skills and abilities for the growth of the
Organization and build my professional career.

Education & qualifications


 B.Tech. in Mechanical Engineering – BBSCET Prayagraj (AKTU)– 2017

Career Summary
Period Employing organization and Summary of activities performed relevant
title/position. to the Assignment

July 2023 to Employing organization:  Preparation of design and estimates for water
December Teerth Gopicon Limited, Sagar supply works.
2023
Title/ Position: Sr Engineer Mechanical  Installation of Centrifugal pumps.
Project Cost-162 Cr.
 Testing of Centrifugal pumps.
Project Name: Sanudha 1 MVS District
Sagar  Installation of Valves, and Blowers

Client: Madhya Pradesh Jal Nigam


Maryadit
 Errection and commissioning of centrifugal
pumps

 Operation and maintenance of Pump House,


Intakewell and WTP.

 Operation and maintenance of different types


of valves like Air Valve, Gate valve butterfly
valve and Zero velocity valve

 AirValve, Sluice Valve , Score Valve, Globe valve,


Butterfly valve, NRV Reparing and Errection as
per drawing .

 Construction of Plant Boundaries and Staff Quarters.

 Construction of Filter bed and Cascade Areator.


July 2020 Employing organization: OM
to Construction company
June Shivpuri (M.P)
2023  Butterfly valve, Gate Valve, NRV, Zero
Title/ Position: Sr Engineer
Velocity Valve, Air Cushion Valve etc.
Mechanical
erection.
Project Cost: - 150 Cr.
 Screw pump , HSC pump , Submersible
Project Name: Shivpuri Water pump erection.
Augmentation Project.
 Thickner Bridge 25mtr. Dia erection with complete
Client: Urban Administration assembly.
Development Department (UADD),
Government of Madhya Pradesh.
 Centrifugal pump Erection & Commissioning done.

 Monitor the construction work of water supply project of


Shivpuri (M.P.)

 Planned to prepare preliminary layout and detailed design

 In this project we are connected 18 OHT on Shivpuri with


water treatment plant & also connected Intake well to
WTP.

 Excavation, Laying , Jointing & testing for HDPE pipe for


Dia 100-150mm

 Excavation , Laying ,Jointing & testing for DI pipe for Dia


200-500mm

 Excavation, Laying ,Jointing ,Testing M.S. pipe for 800mm


dia for 26km length

 GI pipe laying , jointing , testing for 100mm dia

 M.S. pipe Trenchless system laying , jointing & Testing

 Maintaining daily progresses of different type cans

 Work distriute to related person.

 Maintining Quality as per standard

 Supervision to Inlet to out let complete product.


 Maintaining minimum Rejection.

 Maintaining weekly & Monthly Programe.


 Maintaing all related equipments proper.

October Employing organization: Om  Inspection of M.S. pipe Dia


2018 to Construction Company
July 3000mm fabrication & coating .
2020 Title / position: Mechanical
engineer  Excavation , Laying , Jointing , Testing M.S. pipe
for 3000mm dia for 16km length
Project Name:
Shivpuri Water Augmentation Project.
 In plant Fabrication work done by SAW
Project Cost- 50 Cr processes .
Client: Urban Administration
Development (UADD), Government
 IN site jointing by SMAW proesses
of Madhya Pradesh.

 Sand Bedding done in all trench 300mm thick.

 Pipe jointing coating patch work done at site


by QAP

 DPT & RT done at site as per QAP.

 Project Planning ,Review of daily progress of


site.

 AirValve, Butterfly Valve & Score Valve


Erection as per drawing .

 Cnducting site preprations , Mobilization of


contractor for carrying out all fabrication ,
Erection & Commissioning of Equipments.

 Preparing and Raising Bills of item Recipt at


site.

 Water Treatment Plant for 40MLD Monitoring


with Civil & Mechanical Team.

 Monitoring of 40MLD WTP, Pump House etc.


 Plant internal unite connectivity pipe laying.

 Monitoring of All Thrust Block , Anchor Block ,


Encasing , Valve Chamber etc with Civil team

 Chemical House it's operation and maintance.

 Filter bed 5 Nos.it's operation and maintance.

 Maintaining Inflow & outflow of water.

 Maintaining water quality as per required


standard.

Declaration
I hereby declare that the above-furnished information is true to the best of my knowledge and belief.

Date: 1st April 2024


Place: Prayagraj U.P. ABHISHEK DUBEY

You might also like