Deepborewell - Near Bajrang Bali Sthan Baher Tand Nawadih

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

lab

1327095
13 12 11 10 9 7 6 5
2 No.Serial Bilof
1
|2.5sq
Supplying, impeller
Fully MotorSupplying ProvidingProviding
Providing
withLabour (part
|ASTM Providing casing
Providing thickness
wall
approvedmake shall System
Pump mm
approved
complete, reputed
Supplying, drilling
and
FE installation drilling
Cost installation and
and riAigr, Cost |installation drilling Cost|Drilling quantity
410
Automatic be testing I), other of other
mm. suitable charge standards pipe, of other of
upto suitable including mild
& rig, drilling
Nylon
M- and and drilling rig, drilling
Flat 100 uPVC fobrand
r
approved vehicles Air for
remnovable assembling,
steel of vehicles of vehicles Air of
24 mm
offor seal fixing fixing all the
electric column compressor pump 200compressorpump 200compressor pump 200
and
flexible Directstage, for ropehaving
for for necessary depths, screwed work
working dia lowering upto mmn upto
various jointing
water
proof 20 M.S. suitable manufacture,make, mm upto mm
set set set
submersible online submersible 2.0HP line, as "Construction
mmmin. Pipe clamp as lowering the with 165 x the
on of per with 165 x the with 165 x
size perincluding and site. and
submersible delivery electrician 100 dia. safe 32bolts
hydraulic mm site. and site. and
240V, requirement, hydraulic mm
for
direction socketed/ equipments equipments equipments hydraulic mm
mtr allowable
mm &ofthreaded (Beyond
and x (
cable required including From x From ( x
pump lowering nominal nuts 125 125 125
Single head
PVC painted fixing of
with, control helper , of of plain
DTHmeter 51-125 DTHmeter 0-50 DTHmeter Deep
sets column mild 125
Phase, and hydrostatic required dia Engineer-in-charge.all in asRig asRig
copper diameter
of required with Meter). as Rig Description Work ofBorwell
confirming etc. complete
to steel ended
verticalMeter). well deep
machine, well
pump Meter).complete
machine,
fuelas alldeep well deep
panel discharge the
machine,
50 all pipe outside as
size cap bore bore as bore
conductor, Hz, completed top hire casingposition fuel fuel with
Single submersible motor complete
pressure
A.C. complete. of for or all well well all well
with to &
surface lubricants lubricants lubricants submersible
spot labour pipes complete
IS set. casing/housingborewell in in
complete in
Phase supply. in
stainless 8034 with welded 200 all all all
PVC job of with of
bore
pump 15 charges, kinds kinds kinds
for and of:
mmrequired and and and
insulated, Submersible kg/cm2Fittings two
well, including supplying
including all including
2 200 plate nominal of of
pump
cost cost cost of
HP steelmotor with ERW
pipe fittingscoats soil soil soil
pump conforming mm to dia, of of of set
pump :32 transportation and and supplying and
and confirming motor, of dia the sizeconforming (Electric
of
supplying transportation transportation and
pump mm tubewell & rock rock rock
PVC motor, top anticorrosive
dia
shaft cable, accessories, pump
100 nominal of having Resistance in in in
sheathed. to al l rural rural all rural
ISl and bore room
mm to adopter schedule as to materials materials tools materials
marked IS per minimum of area of area of area
Dia. well IS:
dia PVC 9283. paint
al rig. rig. rig. near
IS: 4270,
Welded)
2 impeller.
with 80 2800 housing/ Machine tools for Machine for Machine for
core of etc. of tools bajranj
Pump of of
PVC
bali
150.00 105.00 100.00 Quantity sthan
1.00 1.00 1.00 1.00 1.00 1.00 30.00 45.00 75.00 50.00

in
baher

mtr no. no. set mtr mtr no. mtr mtr mtr mtr Unit tand
job no.

in
vill
1329.35 Rate
SOR
243.90 -
Nawadih

under
Updated
Rate
3200.00 20700.00 1572.16 1363.43 1090.38 1090.38
105.8 243.92 916.55 CSR
2300 232.30 34.85 108.10
activity

Updated
Amount 2023-24
40902.90 49067.10 81778.50 45827.50
15870.00 3200.00 20700.00 3659.2510810.00
2300.00 232.30 1598.81 243.92
of
Piparwar

24.10.3
AR: Remarks Area,
24.14.3 24.13.3
AR AR AR AR AR AR AR AR AR AR
CCL"
18 17
16 15 14 13 2 1
12 11 10 9 6 3
pointing|Grey,
manufacturer), |Providingpointing mortar Providingas|the exceeding Supplving land 30cm
|lift Filling landings, 6|12 |including
CenteringCentering |Abutments, bases
CenteringCentering al|Steel
l 20 Reinforcedstring plinth Brick centering,
Providing shuttering
nominalsize) Providing Cadh
approved mm level,Reinforcedaggregate
above Brick |sandbalconies, centering, costof sand:3 complete
dressing
manufacturer), upto mm complete mm lift in
Fume availablecement
the in1:3 cement of
reinforcement plinth work excluding :4 courses, in: work uptodepth. work
and white columns, nominal graded and and and
joints (1 and 1.5 20cm balconiesattached and and and graded Cement shuttering,
with - in
Red by and with shelves, cement cement All 1.5m,
Posts upto laying worklaying filling excavation 1.5
laying
of cement: fixing m. plaster shuttering shuttering level fillets,
with Engineer-in-Charge, cement excavated in plaster shuttering shuttering size) common stone
Brown, 1st and common stone the shuttering, mortar disposed m
of depth, andpilasters, etc. plinth up chajjas,
concrete concrete in in
white quality Ceramic approved 1st for cost columns, aggregate finishing
position
up in plinth in
position
of of Struts for to
aggregate to width by
mixed 3 quality mix miaccess level.Thermo-Mechanically R.C.C. floor of 1:6burnt plinth
laid coarse consolidating earth x
including including includingincludingmass mechanical
cement burntcentering,lintels,
work finishing work (1 with earth as
conforming ::1:6butteresses,
and
specified cement
onglazed with
make,
ceramic (excluding 1:3platform concrete work level V
clay
pillars,cement:6 clay 20 level Jamuna towell
20 pigmentsand) (1 (1 20bands, in inreinforcement
and cement:3 strutting,strutting,strutting,strutting,including mm beams, walls F.P.S. mm :14:8(1 be as
mm in cement: in
F.P.S. andpiers,
floor glazed
in each all shuttering, nominal grade concrete levelled means 10
matching skirting,
and all nominal (non sand sqm
thick to plinth shapes (non plain reinforcement (anycoarse
of rock) suspended abutments,
IS: tiles jointingcolours, deposited propping
6 proppingproppingpropping straightening, ofCement under (Hydraulic
and on
complete.
matching
shade wall fine fine modular) window thickness),modular) size)
of
risers in and and size)
finishing sand) reinforced - plan)
pigment
cement15622, of
tiles trenches, sand)sand) All specified neatly
size string Treated sizes work
with shadesof etc. etc. etc. etc. sills,
floors, :4 floors, including
of conforming layer posts coarse excavator)
bricks and :1:1.5:3including bricks dressed.
etc.,
mortar300x300
approved greysteps and
courses and and and cutting, in: staircases up
cement
except plinth,
by bars and gradeincluding
removal removal removal removal Cement reinforcement, roofs of to
complete. 1:4 and ramming of class plinth sand:8
cement class (1
struts disposal
to sides etc. bending, havingcement:1.5 attached concrete, excluding l
Al/manual
(1 mm burgundy, dados, watering,
IS mortar
designation and designation kinds
Cement:make, of of of of etc. level: graded
(thickness slurry : and of
15622foundations form form form form spiralslope of
in over with up
pilasters, the excavated of
watering, placing 1:6(1 1:1.5:3
excluding soil means
colours @ bottle for: for: for: for: stair to stone cost ramming,
4 (thickness 1:2:4
up coarse floor
5.0
3.3 12 Suspended WalsColumns, cement: 5.0
Coarse to mm
green, Foundations, in cases to (1 of over
kg position in 15° buttresses, in aggregate
such be lead etc. superstructure (1 sand five foundation cement: the centering earth,
per thick (any cement landings, consolidating areas
up level, cost
sand),specified black to up in Pillars, 6 to :3
as sqm, bed be layers to floors,thickness) and coarse lead
floor graded 1.5 of (exceeding
specifiedof 50 footings, :2 excludingplinth and 40and
including White, Piers, binding and Coarse mm upto
including ofany mnot roofs, sand) coarse five
by cement and stone
lvory, size and 5Om
the by

2.40 6.38 4.23 12.7493.30 0.80 11.70 16.50 12.43 726.71 8.10 2.71 7.09 4.15 8.13 1.77 1.23 9.86

Sqmtr sqmtr Cum sqmtrsqmtr sqmtr sqmtr sqmtr sqmtr Cum cum
Kg Cum Cum Cum Cum Cum cum

785.40 836.65 112.40 134.70


149.45401.65 360.80 453.35 196.45 5426.15 6778.20 7074.30 4677.25
68.10 6230.20 4301.15 910.25 155.60

774.31 871.59 173.71 185.37


202.98 573.77 499.76 606.05 238.54 8223.77 8256.09
72.71 5654.45 4529.16 6994.73 5064.58 835.58 208.73

1858.34 S560.74 734.79 2361.61


18938.03 459.02 5847.19 9999.83 2965.05 52839.08 45801.05 22286.42 58535.68 18796.01 56867.15 8964.31 1027.76 2058.08

11.37 11.36 2.25 13.16.113.1.2 5.9.3 5.9.2 6.4.2DR


5.9.6 5.9.1 5.22.6 6.1.2DR
5.3 S.2.2 5.1.2 4.1.8 2.27 2.6.1
32 31 30 29 28 27 26 25 24 23 22 21
|Providing
fixing
and 20 19
OS(Civil),GM
Certificates
(ii) (i) SOP:for Unit Providing
including
socketed Coatweighing
thick Cement weighing
Providing fittings... fittings...
Providing
Providing P/F
This
P/F lcoverConstruting 1.20
No withoutProviding toaggregate
coatColourPainting
consolidated and IMaking lin
Tstructural
with of CPVC CPVC give
splittingwork neat and m of position
jointing and
pipes. 20 20 25fittings long white an
concrete not and not and and pipes, pipes, suitable and washing with
even plinth
has mnm
cement, mm mm 20 steel
fixing lessfixing less
fixingfixing
complete soak and
of placing washing synthetic
protection mm
110 with than than nominalhaving nominal having and shade
such
work not nominal fiooring applying work
been mm inaugration onBoard PTMT PTMT PVC locking pit nominal
including the
has seal wall 88 88 thermal 1.20x1.20x1.20 on as with as :
diameter thermal Two
green, enamel grouted in
executed outerdia base terrace per
been ring face size 1:2:4 gms stop gms bib ballouter .Pipes. arrangement 50single a
lime( or size) priming
stone support standard mm
conforming
unplasticised
cement (1 cock cock valve stability dia stability blue more paint section,
done cement:2 (at with over thick
in aggregate of of of
pipes. or Coat
advance approved for all Satna fine
in carved in slurry, approvedapproved design m buffcoats of75mm
this for for tank. and floor filled approvedsand, of fixed
to hot hot makinglevels)
lime to on cement of
proposal coarse
but thickapproved with
without Rigid
IS with give new
stoneall quality: & & wash including
5382, : granite excluding quality quality cold cold bed or
PVC brickbats anworkbrand concrete
sand:4 polyethylene
necessary on steel
water even of without
and any leaving rain and water walls
and 25 finishing
and dry
it 1:3:6(1 primer
proper water the colour mm including shade:
is graded colour supply supply withmanufacture brickconnecting
a 10 cost nominal holes
complete complete water ballast
work mm pipes one New the cement: all
of
stone 1515mm includingincluding for top complete.
gap nosing mm bore storage
inlet,
S.W. coat.
order. conforming Work smooth. 4O plate,
proposal for as aggregate) nominal nominal drain mm
thermal per of all outlet (twO coarse 3
all tank, including
direction steps CPVC CPVC pipe nominal
bore, and or
as to bore, ISI:12701 sand:6
finished
etc. plain plain 100 more
per expansion, IS
:13592 86 overflow mm size, cutting,
requirement. complete.
of 86 coats)
mm & &
E/C. with mm brass brass diameter rammed wellgraded
long, marked, hoistihg,
(i) Type long, pipes with
Single floating a threaded threaded stone
40
A, but with and a
mm base fixing

6.00 0.54 8.44 15.00 4000.00


4.00 4.00 1.00 8.00 1.00 98.42 4.62 42.74
6.75

sqmtr sqmtr each each each litre


per
mtr mtr mtr each sqmtr Sqmtr Sqmtr
kg

231.65 353.35 156.05 156.05 190.55 231.30 2082.45


7.25 15.45 74.40 419.30 67.70

Gross
total 18%
GST 3333.51 2573.07
Total 259.28 433.77 97.67 97.67 231.38 281.35 348.09 22.45 111.71 576.29
9.15 81.46

Os(Civil),GM
Unit PE(CIvI),

SS
36600.00 3481.60
1555.68 1800.10 3661.02 390.68 390.68 231.382250.80 5221.35 2573.07 2209.53 516.10 3889.96
1,18,235.23
7,75,097.60
6,56,862.38

18.18.2DR 13.39.1(-)13.61.1
12.41.2 11.3.1 18.55.1 18.54.1 18.7.2 18.7.3 18.48 19.33 13.38 4.17 10.1
AR
bali sthan in baher tand in vill.Nawadh d
NAAM Constnuction ofDeep Borwell with submersible rump set and pump rOom near bajranj
2023-24 of Piparwar Area, CCI"
Detailed Calculatinos

Serial Detailed Calculation


Description of Work
No

Part A: Drilling and Pump system


Drilling Bore (0-50)mtr 40.00

Drilling Bore (51-125)mtr 75.00 m

Drilling Bore (126-200) mtr 45.00

P/FGI Casing 4mm 30.00

Mild Steel Cap 1.00 FA

MS Clamp 1

PVCColumn Pipe 32 mm dia 100.00 m

Nylon Rope 20 mm dia 105.00 m

M-seal 1.00 Se

10 labour Charge for lowering 1.00 ob

11 Submersible Pump 2 HP 1.00 EA

Starter for 2 HP submersible pump


12 set 1.00

13 Submersible Cable 2.5 sgmm 150.00 m

Part B: Pump Room


Serial Detailed Calculations
Description of Work
No.
Part B
1 Earthwork in excavation
c/c length- 2*(4.00+2.50)=13.00 mtr
wal 13-4*1.20mtr =8.2 mtr.

walls 1 8.200 0.600 0.600 = 2.95 m3


PILLAR 4 1.200 * 1.200 * 1.200 = 6.91 m3
Total 9.86 m3

2 Sand Filling 1 8.200 * 0.600 * 0.050 = 0.25 m3


1.200 1.200 0.050 = 0.29 m3
Base 1 3.500 * 2.000 0.100 = 0.70 m3
Total 1.23 m3

3 P.C.C (1:4:8)
1 8.200 0.600 0.100 = 0.49 m3
1.200 1.200 0.100 0.58 m3
Base 1 * 3.500 2.000 0.100 = 0.70 m3
Total 1.77 m3

4 R.C.Cin Foundation and plinth 4* 1.200 1.200 0.400 2.30 m3

(0.375*0.
25)+(1.20
upto PL 4 * *1.20))/2 0.950 S.83 m3
Total 8.13 m3

B/W in foundation Ist foundation 1 8.200 0.500 * 0.150 0.62 m3


2nd foundation 1 * 8.200 0.375 0.150 a 0.46 m3
3rd foundation 1 8.200 0.250 0.300 0.62 m3
upto P.L 8.200 0.250 1.200 2.46 m3
Total 4.15 m3

6 R.C.C in Superstructure 0.375 + 0.250 * 3.000 = 7.09 m3


Total 7.09 m3

7 R.C.C work Tie Beam 3 * 13.000 0.250 0.150 = 1.46 m3


29

0.065 = 0.04 m3
1 1.100 0.600
Chajja 1.20 m3
Roof Work 1 4 300 2. 800 0.100
Total 2.71 m3

(1400.4*0 3.000 - 8.63 m3


B/W in superstructure 1 0250
ded- door 0250 * 1.000 -0.53 m3
2100
Total 8.10 m3

Reinforcement base 21*2 2.000 (6115) o 62ke/m 196.51 ke


column A 000 A 350 * 61.94 ke
ring 150 mm spacing 27*(0 35*2+0.20*2+0 052) *039 ke/n 50.54 kg
Lintel Beam 13*4 0.89ke/n - 138 84 kg
ring@175 mm spacing 75 (0.10*2+0.20*2+0.052) *0.39 ke/m 20 48 ke
(0.20+0. 10+0.05*2+0.55)*6o 39 ke/n 24 45 kg
(145)*n 0.39 kp/m 13 57 ke
Roof 35 )R0 0.62 60.76 kg
28 4.30 0.39 46.96 kg
2*10 2.80 0.62 34.72 kg
2*10 4.30 0.39 33.54 kg
216 1.53 0.62 30.36 kg
2*10 1.80 0.39 14.04 kg
Total 726.71 kg
10 Centering and shuttering foundation 44 1.200 0,400 7.68 m2
(0.250+0.3 0.950 4.75 m2
Total 1243 m2

(0.375+0.
11 Centering and shuttering column 42 25) 3.000 16.50 m2
Total 16.50 m2

12 Centering and shuttering beam 3*2 (2.25+3.75 * 0.150 S40 m2


3*2 (2.75+4.25 * 0.150 6.30 m2
Total 11.70 m2

13 Centering and shuttering chajja 1* 1.200 * 0.670 0.80 m2


Total 0.80 m2

14 Plastering Inside ROom 2* (3.750+2.25) 3.750 45.00 m2


Outside 2 * (2.75+4.25) 3.750 = 52.50 m2
Deduction Door -2 * 2.100 1.000 -4.20 m2
93.30 m2

15 Ceiling Plaster 3.750 * 2.250 8.44 m2


Chajja 1 * 1.200 * 0.670 0.80 m2
Spring wall *
(2.75+4.25 * 0.250 3.50 m2
Total 12.74 m2

16 Earth Filling 1/3 *12.68


4.23 m3
Total 4.23 m2

17 Wall Tiles 1* 4.250 1.500 6.38 m2


Total 6.38 m2

18 Fioor Tiles 4.250 0.600 2.40 m2


Total 2.40 m2

19 Structural Steel
(2.10+2.10+1+0.15+0.15+0.15+0. 3.5 kg/m = 20.30 kg
1 * 2.08*0.98*0.001 7850.00Okg, = 16.00 kg
1 * 0.04*0.005*(1.00+1.00+2.10) 7850.00kg, = 6.44 kg
Total 42.74 kg
20 Plinth Protection 11.250 0.600 6.75 m2

21 Painting 2.20*2.10 m2 4.62 m2

22 Colour Washing
(93.30+11.05-6.38)m2 98.42 m2

23 Soak Pit
1.00 nos

24 PVC Water storage tank


4,000.00 Itr

25 PVC Pipe 25 mm
15.00 mtr

26 PVCpipe 20 mm 8.00 mtr

27 PVC valve 25 mm 1.00 nos


28 PTMT Bib Cock
4.00 nos
29 Stop cock
4.00 nos

30 Cernent concrete flooring 1 * 2.250 * 3.750 8.44 sqm

31 Inaguration Board in Granite Slab 1 * 0.9* 0.6 0.54 m2

32 Rainwater Pipe 6.00 mtr

Sr. OverseerO, GM Unit, PPR PE(Civil), GMUDit, PPR


Analysed Rate
100 mm dia submersible pump sets contirming to IS 8034 and motor confirming to IS 9283. Pump shall be suitable
for various delivery head and discharge with stainless steel pump shaft and PVC impeller. Motor suitable for
workino on 240. Single Phase, 50 Hz, A.C. supply. Submersible pump 100 mm dia with PVC impeller upto 24
stage, 2.0 HP

Code Description Unit Quantity Amount


Rate
2 HP single phase submersible Pumj each 1 18000 18000
Total: 18000
Add C.P & OH @15% on 2700
Cost of 1 complete set 20700

Rate per cc Rs 20700

Analysed Rate
Fully Automatic Direct online submersible control panel Single
Phase for 2 HP pump motor, ISI marked ot
Code
Description Unit Quantity Rate Amount
Control panel starter each 1 2800 2800
Total: 2800
Add C.P & OH @15% on 420
Cost of 1 complete set 3220

Rate per cc Rs 3200

Analysed Rate
Flat flexible submersible cable with, copper conductor, PVC
insulated, and PVC sheathed.2 core 2.5 sq mm
Code Description Unit
2
Quantity Rate Amount
core 2.5 sg mm each 1 92 92
Total: 92
Add C.P& OH @15% on 13.8
Cost of 1 meter 105.8

Rate per 1 Rs 89.45


Analysed Rate
Cost of Drilling 200mm x 165 mmx 125 meter deep bore
well in all kind of soil and rock in rural area for
set with hydraulic DTH Rig machine, all Complete including installation of pump
supplying all materials, tools, drilling rig, Air compressor and
equipments, as well as fuel, lubricants and cost of transportation of Rig machine and
other vehicles up to the site. (a) From 0
50 meter

Code Description Unit Quantity Rate


Amount
Cost of Drilling 200mm x 165 mmx 1 meter
1 797 797
Total: 797
Add C.P & OH @15% on
119.55
Total for 1 m 916.55
Analysed Rate
Cost of drilling 200 mm x 165 mm x 125 meter
deep bore well in all kinds of soil and rock in
set with hydraulic DTH Rig machine, all rural area for installation of pump
complete
equipments as well as fuel lubricants and cost of including supplying all materials tools drilling rig, Air
compressor and
transportation of rig. Machine and other vehicles upto the site. (From 51
125 Meter).
Code Description Unit
Cost of Drilling 200mm x 165 Quantity Rate
Amount
mmx ]meter 1
948.16 948.16
Total:
Add C.P & OH @15% on 948.16
142.224
Total for 1 m 1090.38
pump
installation of
Analysed Rate rural area for
well in all kinds of soil and rock in and
Cost of drilling 200 mm x 165 mm x125 meter deep bore drilling rig, Air compressor
materials tools (Beyond 125
set with hydraulic DTH Rig machine, allcomplete including suuppplying all upto the site.
equipments as well as fuel lubricants and cost of transportation of rig. Machine and other vehicles
Meter).
Code Amount
Description Unit Quantity Rate
Cost of Drilling 200mm x 165 mmx Imeter 1 948.16 948.16
Total: 948.16
Add C.P & OH @15% on 142.224
Total for 1 m 1090.38

Analysed Rate
Supplying nylon rope 20 mm dia
Code Description Unit Quantity Rate Amount
Nylon rope 20 mm dia meter 1 30.3 30.3
Total: 30.3
Add C.P & OH a15% on 4.545
Cost of 1 complete set 34.85

Rate per 1 Rs 34.85

Analysed Rate
Labour charges for Lowering of submersible motor
pump,100 m upvc column pipe, Cable & rope with testing of
electrician helper etc all complete job
Code Description Unit Quantity Rate Amount
Labour charges meter 1 2000 2000
Total: 2000
Add C.P& OH @15% on 2000 300
Cost of 1 complete set 2300

Rate per 1 Rs 2300.00

Item Code: 24.10.3


Supplying, assembling, lowering and fixing in vertical position in bore well, ERW
410 mild steel screwed and socketed/ plain ended casing pipes - (Electric Resistance Welded) FE
200 mm nominal size dia having minimum wall
thickness 4 mm
Details of Cost for:30.00 m
Code Description Unit Quantity Rate Amount
MATERIALS:
7744 M.S. pipe 200 mm dia m 30.00 1400*4/5.4 31111,11
7766 M.S. Socket 200 mm cNos 5.00 250.00 1250.00
2345 Carraige of Cast iron g 100 m 30.00 0.00 0.00
including loading and unloading
Painting with Anticorrosive Paint
3.14 x O0.21 x 30.00=20.25 sgm.

13.065.01 Painting with black ar Sqm 20.25 90.76 1837.89


LABOUR:
of pump
Analysed Rate
rockin rural area for installation
Cost of drilling 200 mm x 165 mm x 125 meter deep bore well in all kinds of soil and compressor and
drillingg rig, Air
set with hydraulic DTH Rig machine, all complete including supplying all materials tools vehicles upto the site. (Beyond 125
equipments as well as fuel lubricants and cost of transportation offrrig. Machine and other
Meter).
Code Amount
Description Unit Quantity Rate
Cost of Drilling 200mm x 165 mmx Imeter 1 948.16 948.16
Total: 948.16
Add C.P &OH @15% on 142.224
Total for 1 m 1090.38

Analysed Rate
Supplying nylon rope 20 mm dia
Code Description Unit Quantity Rate Amount
Nylon rope 20 mm dia meter 1 30.3 30.3
Total: 30.3
Add C.P & OH @15% on
4.545
Cost of 1complete set 34.85

Rate per 1 Rs 34.85

Analysed Rate
Labour charges for Lowering of submersible motor
pump,100 m upvc column pipe, Cable & rope with testing of
electrician helper etc all complete job
Code Description Unit Quantity Rate Amount
Labour charges meter 1 2000 2000
Total: 2000
Add C.P & OH @15% on
2000 300
Cost of 1 complete set 2300

Rate per 1 Rs 2300.00

Item Code: 24.10.3


Supplying, assembling, lowering and fixing in vertical position in bore wel, ERW
410 mild steel screwed and socketed/ plain ended casing (Electric Resistance Welded) FE
pipes - 200 mm nominal size dia having minimum wall
thickness 4 mm
Details of Cost for:30.00m
Code Description Unit Quantity Rate
MATERIALS: Amount
7744 M.S. pipe 200 mm dia m
30.00 1400*4/5.4 31111.11
7766 M.S. Socket 200mm cNos 5.00 250.00 1250.00
2345 Carraige of Cast iron r 100 m 30.00 0.00 0.00
including loading and unloading
Painting with Anticorrosive Paint
3.14 x0.21 x 30.00=20.25 sam.

13.065.01 Painting with black ar Sqm 20.25 90.76 1837.89


LABOUR:
0114
0130 Beldar Day 504.00 680.40
Mistry Day
1.35
0.50 709.00 354.50
Total: 35233.90
Add water charges @ 1%
except on [A] i.e on 33396.01 333.96
35567.86
Add .P & UH (15%
except on [A] i.e on 35567.86 5335.18
Cost for 30.00 m 40903.04
Cost for 1.00 m 1363.43
Rate per O Rs 1363.43

Analysed Rate
ovlng uPVC column Pipe 32 mm nominal diameter complete with Fittings conforming to schedule 80 of ASIM
Code standards having min. safe allowable hydrostatic pressure of 15 kg/cm2 :32 mm nominal Dia.
Description Unit Quantity Rate Amount
Cost for 1.0 mlength
uPVC column pipe 32 mm dia meter 1 94.00 94
Total: 94

Add C.P & OH @15% on 14.1


Total for 1 m 108.10
Cost for 1 m 108.10
Rate for 1 m length Rs 108.10

Analysed Rate
Providing and fixing of Inaugration board carved in granite stone all complete as per direction of E/|
Code Description Unit Quantity Rate Amount

Details of cost for one sqm inaugrat sqm 1 2870 2870

Total: 2870
Add water charges 1%
on 2870 28.7
2898.7

Add C.P& OH @15% on 2898.7 434.81


Cost for 1.00Sgm 3333.51

Rate per 1
Sqm: Rs 3333.51

Item Code: 18.18.2 DR


P/F ball valve (pvc) - High or low pressure, with plastic floats complete :25 mm nominal bore
Details of Cost for: 1.00No.
Code Description Unit Quantity Rate Amount

1923 pvc ball valve - 25mm each 1 172.3 172.3


9999 fixing charges L.S. 26.91 1 26.91
Total: 199.21
Add water charges @ 1% c 199.21 1.99
201.2
Add C.P& OH @15% on 201.2 30.18
Cost for 1.00 No. 231.38

Rate per E 231.38

ilasSao
20BJ P6966LZZH Mob.:9430
QUOTATION 7831

SHAKTI HARDWARE
DEALSIN:. CEMENT. PAINT, SAMOSAN, WALL PUTTY, PARIS, MARBLE, TILES, ELECTRICAL GOODS
NUT BOLT, SANIETRYITEMS,PLY BOARD, ALL TYPES OF HARDWARE &GENERAL ORDER SUPPLIER
K. D, Road. Khalari, Distt. Ranchi (Jharkhand)
Prop. : Shiv Narayan Prajapati
Date 13 6g
To
ARSntenpes Qtn No.

Enguiry No. Dale.

Rate Total Art


SI Qty.
No Description
18oeol oo
Kinlosky 2hp Zo Jage
ubmeible 25}
head)
28o0 28o
2hp Wilozkan tontey
Too
Gmm coble Dauble fhaa Cotpen
9omt le.
I mt 92/ g2o
WirE 5 ymm

GST exha 187

Your's Faithfully
SHANTIHARDWARE STORE
SHAKTI HARDH
Progrici
7631163896
QUOTATION
SHAKTIHARDWARE
GST IN : 20BJOPP6966LZZH

TILES,
ELECTRICAL GOODS
SAMOSAN, WALL PUTTY, PAAIS,
MARBLE,
GENERAL ORDERSUPPLIER
DEALS IN :- CEMENT, PAINT, & (Jharkhand)
SANIETRYITENS, PLY BOARD, ALL TYPES OF HARDWARE
NUT BOLT,
Distt. Ranchi
K. D. Road, Khalarl,
Shiv Narayan Prajapati
Prop. :
Qln. No.t&. .....*.***
TO..E..Civil.pipANLIan. ..

Date.
Anea.. Enqulry No.
Total Arncunt
Rate
Oty.
SI. Description
No.
Im
Column bipe l4 32mm 15g
140
2

3.
4300 300
u. HandpumpMauh with lono
Conneci kods

SHAKTI HARDWARE SYUSFaithfully


snaT
PropieorH¶RDWARE
S GcTIon

2Son
2 io n

You might also like