JOB HAZARD ANALYSIS

HOW TO USE THIS FORM : Installation/Facility PLATFORM


1) Crew performing task reviews ALL generic JHA considerations. Location WP-IA
2) Review previous JHA update(s) for useful information which will help this task. Associated Work Permit Type LIFTING
3) Create new JHA update with generic form and ALL considerations for this task. Associated Work Permit Number
4) Carry out task as per plan. If any conditions change ---STOP & RE-ASSESS. Electrical Isolation Certificate Number
5) File JHA update for future reference. Physical Isolation Certificate Number
WORK ACTIVITY RIG UP WIRELINE EQUIPMENT JHA Cross-Reference Number

Job Description of Potential Control / Recovery


L S R L S R Result
Step Job Step Hazard/s Measures

§ Applicant, Authorizing, Approval


Signatories be familiar with the job.
§ Competent Personnel to conduct the
1 Preparation for PTW § To avoid clash of work at platform 2 3 6 operation. 1 1 1 Acceptable
§ Inform to all crew on location and
description of works.

§ Inform to all crew on location


2 Pre Job Meeting.
§ Other party not aware where you are 2 2 4 1 1 1 Acceptable
working
§ Inform the hazards involved at place
of work

§ Physical inspection of lifting


equipment.
§ Hand and foot crush during lifting the § Valid inspection records
equipment due to sling break. § Stay away from the weight
§ Body caught between load § Don’t stand between load
3 Lifting wireline equipment § Finger pinched while repositioning 2 2 4 § Assign experience signal man 1 1 1 Acceptable
the equipment § Beware of hand and foot position
§ Equipment dropped due to lifting § Use tag line while handling lifting
equipment failure. equipment.
§ Clear communication between Signal
man and Crane Operator.
JOB HAZARD ANALYSIS

§ Physical inspection for lifting


equipment.
§ End of wire stabbed personnel if § Make sure lifting equipment valid the
wire parted. inspection record.
§ Bodily injury and equipment dropped § Double check the connection and
due to lifting equipment failure. hose
§ Tripping hazard. § Cut and test the wire prior to do job.
Rig up wireline equipment on the
4 main deck.
§ Hydraulic oil hose burst cause 2 2 4 § Proper house keeping and make 1 1 1 Acceptable
hydraulic splash to personnel and sure no oil spill.
contaminate environment.
§ Use proper lifting gears and lifting
§ Back injury due to wrong method of
technique.
manual handling.
§ Get help from other personnel.
§ Finger, hand and foot crush during
handling equipment.
§ All under pressure hoses connection
secure with safety pin.
§ Follow the working safety procedure.

§ Secure all equipment


5 Sign off permit 2 3 6 1 1 1 Acceptable
§ other party not aware of job status. § Mention on the permit status of job.
JOB HAZARD ANALYSIS
L - LIKELIHOOD S - SEVERITY R - RATING RESULT

CATEGORY DEFINITION CATEGORY DEFINITIONS H 3 6 9 6-9 UNACCEPTABLE


LOW 1 Remote LOW 1 No Injury No Damage No Pollution M 2 4 6 3-4 TOLERABLE
MEDIU
M
2 Possible MEDIUM 2 First Aid Injury Minor Damage Minor Pollution L 1 2 3 1-2 ACCEPTABLE

HIGH 3 Probable HIGH 3 Lost Time Injury Major Damage Major Pollution L M H

IS THERE A SAFER WAY TO COMPLETE THE JOB ? ARE THERE ALTERNATIVES WITH LESS RISK ? LIKELIHOOD

JHA Number TASK SAFETY MANAGEMENT OUTLINE Date this JHA created :
Date JHA Last Revised :
WORK ACTIVITY EQUIPMENT
Type of Equipment Manufacturer Tag. No. Precise Work Site
WIRELINE EQUIPMENT MAIN DECK AREA
WORK ACTIVITY PARTICIPANTS THIS JHA CREATED BY
Name Discipline Position Performed Name Discipline Position
Job Before?
WIRELINE W/L OPRT WIRELINE W/L OPRT
WIRELINE
WIRELINE

WORK ACTIVITY RESPONSIBILITY JHA SUBMITTED BY JHA ACCEPTED BY


WORK LEADER RECEIVING AUTHORITY APPROVING AUTHORITY
Name : Name: Name :
Signature : Signature : Signature :
Date : Date : Date :
Time : Time : Time :