System power: 5.00 kWp

PVsyst TRIAL
FSE Building - Bangladesh

PVsyst TRIAL

PVsyst TRIAL
Author

PVsyst TRIAL
Project: Grid Connected ET201052_Abid
Variant: New simulation variant

PVsyst V7.4.6
VC0, Simulation date:
05/05/24 00:10

PVsyst TRIAL
with V7.4.6

Project summary
Geographical Site Situation Project settings
FSE Building Latitude 22.50 °N Albedo 0.20
Bangladesh Longitude 91.72 °E
Altitude 9m
Time zone UTC+6

Weather data
FSE Building
Meteonorm 8.1 (1991-2012), Sat=100% - Synthetic

System summary

PVsyst TRIAL
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation Near Shadings User's needs


Fixed plane No Shadings Daily household consumers
Tilt/Azimuth 24 / 0 ° Seasonal modulation
Average 2.3 kWh/Day

System information
PV Array Inverters Battery pack
Nb. of modules 20 units Nb. of units 1 unit Storage strategy: Self-consumption
Pnom total 5.00 kWp Pnom total 5.00 kWac Nb. of units 1 unit
Pnom ratio 1.000 Voltage 50 V
Capacity 268 Ah

Results summary

PVsyst TRIAL
Produced Energy
Used Energy
6586.00 kWh/year
843.35 kWh/year

Project and results summary


Specific production 1317 kWh/kWp/year Perf. Ratio PR

Table of contents

General parameters, PV Array Characteristics, System losses


Solar Fraction SF
77.02 %
100.00 %

2
3
Detailed User's needs 5
Main results 6
Loss diagram 7
Predef. graphs 8
Single-line diagram 9

PVsyst TRIAL

PVsyst TRIAL
05/05/24 PVsyst Evaluation mode Page 2/9
Project: Grid Connected ET201052_Abid
Variant: New simulation variant

PVsyst V7.4.6
VC0, Simulation date:
05/05/24 00:10

PVsyst TRIAL
with V7.4.6

General parameters
Grid-Connected System No 3D scene defined, no shadings

PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane No 3D scene defined Transposition Perez
Tilt/Azimuth 24 / 0 ° Diffuse Perez, Meteonorm
Circumsolar separate

Horizon Near Shadings User's needs


Free Horizon No Shadings Daily household consumers
Seasonal modulation
Average 2.3 kWh/Day

PVsyst TRIAL
Storage
Kind
Charging strategy
Self-consumption

When excess solar power is available


Discharging strategy
As soon as power is needed

PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
Model TSP 250 Model HIS 48V 5.0
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 250 Wp Unit Nom. Power 5.00 kWac
Number of PV modules 20 units Number of inverters 2 * MPPT 50% 1 unit
Nominal (STC) 5.00 kWp Total power 5.0 kWac

PVsyst TRIAL
Modules 2 string x 10 In series Operating voltage 150-425 V
At operating cond. (50°C) Max. power (=>25°C) 5.50 kWac
Pmpp 4486 Wp Pnom ratio (DC:AC) 1.00
U mpp 276 V No power sharing between MPPTs
I mpp 16 A

Total PV power Total inverter power


Nominal (STC) 5 kWp Total power 5 kWac
Total 20 modules Number of inverters 1 unit
Module area 32.7 m² Pnom ratio 1.00
Cell area 29.2 m²

Battery Storage
Battery
Manufacturer Generic

PVsyst TRIAL
Model Powerwall2
Battery pack Battery Pack Characteristics
Nb. of units 1 Unit Voltage 50 V
Discharging min. SOC 20.0 % Nominal Capacity 268 Ah (C10)
Stored energy 10.9 kWh Temperature Fixed 20 °C
Battery input charger
Model Generic
Max. charg. power 3.2 kWdc
Max./Euro effic. 97.0/95.0 %
Battery to Grid inverter
Model Generic
Max. disch. power 3.2 kWac
Max./Euro effic. 97.0/95.0 %

PVsyst TRIAL
05/05/24 PVsyst Evaluation mode Page 3/9
Project: Grid Connected ET201052_Abid
Variant: New simulation variant

PVsyst V7.4.6
VC0, Simulation date:
05/05/24 00:10

PVsyst TRIAL
with V7.4.6

Array losses
Thermal Loss factor DC wiring losses LID - Light Induced Degradation
Module temperature according to irradiance Global array res. 284 mΩ Loss Fraction 1.0 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s

Module Quality Loss Module mismatch losses IAM loss factor


Loss Fraction -0.8 % Loss Fraction 2.0 % at MPP ASHRAE Param.: IAM = 1 - bo (1/cosi -1)
bo Param. 0.05

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL
05/05/24 PVsyst Evaluation mode Page 4/9
Project: Grid Connected ET201052_Abid
Variant: New simulation variant

PVsyst V7.4.6
VC0, Simulation date:
05/05/24 00:10

PVsyst TRIAL
with V7.4.6

Detailed User's needs


Daily household consumers, Seasonal modulation, average = 2.3 kWh/day
Summer (Jun-Aug) Autumn (Sep-Nov)

Nb. Power Use Energy Nb. Power Use Energy


W Hour/day Wh/day W Hour/day Wh/day
Lamps (LED or fluo) 6 10/lamp 4.0 240 Lamps (LED or fluo) 6 10/lamp 5.0 300
TV / PC / Mobile 1 75/app 3.0 225 TV / PC / Mobile 1 75/app 4.0 300
Domestic appliances 1 200/app 3.0 600 Domestic appliances 1 200/app 4.0 800
Fridge / Deep-freeze 1 24 799 Fridge / Deep-freeze 1 24 799
Stand-by consumers 24.0 144 Stand-by consumers 24.0 144
Total daily energy 2008 Total daily energy 2343

PVsyst TRIAL
Lamps (LED or fluo)
TV / PC / Mobile
Winter (Dec-Feb)

Nb.

6
1
Power
W
10/lamp
75/app
Use
Hour/day
6.0
6.0
Energy
Wh/day
360
450
Lamps (LED or fluo)
TV / PC / Mobile
Spring (Mar-May)

Nb.

6
1
Power
W
10/lamp
75/app
Use
Hour/day
5.0
4.0
Energy
Wh/day
300
300
Domestic appliances 1 200/app 4.0 800 Domestic appliances 1 200/app 4.0 800
Fridge / Deep-freeze 1 24 799 Fridge / Deep-freeze 1 24 799
Stand-by consumers 24.0 144 Stand-by consumers 24.0 144
Total daily energy 2553 Total daily energy 2343

Hourly distribution

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL
05/05/24 PVsyst Evaluation mode Page 5/9
Project: Grid Connected ET201052_Abid
Variant: New simulation variant

PVsyst V7.4.6
VC0, Simulation date:
05/05/24 00:10

PVsyst TRIAL
with V7.4.6

Main results
System Production
Produced Energy 6586.00 kWh/year Specific production 1317 kWh/kWp/year
Used Energy 843.35 kWh/year Perf. Ratio PR 77.02 %
Solar Fraction SF 100.00 %
Battery aging (State of Wear)
Cycles SOW 92.5 %
Static SOW 90.0 %

Normalized productions (per installed kWp) Performance Ratio PR

PVsyst TRIAL
Balances and main results

PVsyst TRIAL
January
February
March
April
GlobHor
kWh/m²
114.7
120.9
156.5
164.0
DiffHor
kWh/m²
56.60
58.77
80.52
90.38
T_Amb
°C
21.09
23.97
26.89
28.44
GlobInc
kWh/m²
143.5
141.6
168.6
162.2
GlobEff
kWh/m²
140.1
138.6
164.6
157.9
EArray
kWh
612.6
592.7
695.5
667.7
E_User
kWh
79.15
71.49
72.64
70.30
E_Solar
kWh
79.15
71.49
72.64
70.30
E_Grid
kWh
482.8
478.6
576.3
553.0
EFrGrid
kWh
0.000
0.000
0.000
0.000
May 159.5 95.79 29.26 148.6 144.0 612.6 72.64 72.64 494.6 0.000
June 133.9 94.12 28.30 122.5 118.5 513.8 60.25 60.25 410.5 0.000
July 124.5 88.11 28.25 115.3 111.6 483.4 62.25 62.25 376.7 0.000
August 138.4 82.94 28.49 133.0 129.2 550.5 62.25 62.25 443.8 0.000
September 133.4 76.24 28.29 137.5 133.8 567.9 70.30 70.30 453.6 0.000
October 126.4 70.05 28.26 141.4 137.9 584.6 72.64 72.64 466.6 0.000
November 123.7 53.19 25.47 155.2 151.7 646.9 70.30 70.30 531.4 0.000

PVsyst TRIAL
December 110.1 54.52 22.46 140.7 137.4 599.4 79.15 79.15 474.7 0.000
Year 1605.9 901.22 26.61 1710.2 1665.1 7127.6 843.35 843.35 5742.6 0.000

Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_User Energy supplied to the user
T_Amb Ambient Temperature E_Solar Energy from the sun
GlobInc Global incident in coll. plane E_Grid Energy injected into grid
GlobEff Effective Global, corr. for IAM and shadings EFrGrid Energy from the grid

PVsyst TRIAL
05/05/24 PVsyst Evaluation mode Page 6/9
Project: Grid Connected ET201052_Abid
Variant: New simulation variant

PVsyst V7.4.6
VC0, Simulation date:
05/05/24 00:10

PVsyst TRIAL
with V7.4.6

Loss diagram
1606 kWh/m² Global horizontal irradiation
+6.5% Global incident in coll. plane

-2.63% IAM factor on global

1665 kWh/m² * 33 m² coll. Effective irradiation on collectors

efficiency at STC = 15.29% PV conversion

8326 kWh Array nominal energy (at STC effic.)

PVsyst TRIAL
-0.57% PV loss due to irradiance level

-11.04% PV loss due to temperature

+0.75% Module quality loss

-1.00% LID - Light induced degradation

-2.00% Module array mismatch loss

-0.99% Ohmic wiring loss


7128 kWh Array virtual energy at MPP

-3.27% Inverter Loss during operation (efficiency)

0.00% Inverter Loss over nominal inv. power

PVsyst TRIAL 6894 kWh


0.00%
0.00%
-0.02%
0.00%
Inverter Loss due to max. input current
Inverter Loss over nominal inv. voltage
Inverter Loss due to power threshold
Inverter Loss due to voltage threshold
Available Energy at Inverter Output

-0.60% Battery IN, charger loss


grid
-0.06% Battery Stored Energy balance
consumption
Stored Direct use
Battery Storage
10.4% 89.6%
-0.41% Battery global loss
(4.24% of the battery contribution)

PVsyst TRIAL
0 843

to user to user
from gridfrom solar
5743

to grid
kWh
-3.43% Battery OUT, inverter loss

Dispatch: user and grid reinjection

PVsyst TRIAL
05/05/24 PVsyst Evaluation mode Page 7/9
Project: Grid Connected ET201052_Abid
Variant: New simulation variant

PVsyst V7.4.6
VC0, Simulation date:
05/05/24 00:10

PVsyst TRIAL
with V7.4.6

Predef. graphs
Daily Input/Output diagram

PVsyst TRIAL

PVsyst TRIAL System Output Power Distribution

PVsyst TRIAL

PVsyst TRIAL
05/05/24 PVsyst Evaluation mode Page 8/9
PVsyst V7.4.6
VC0, Simulation date:
05/05/24 00:10

PVsyst TRIAL
with V7.4.6

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL

PVsyst TRIAL

You might also like