Download as pdf or txt
Download as pdf or txt
You are on page 1of 57

EN

2016 |07

Vario Curtain Sider Roof

Assembly instructions

www.EdschaTS.com
Contents

Operation 3 Inserting sliding pillars 36


Hook in sliding pillars 37
Installing batten pockets 38

Designated use 4 Installing battens 39


Guide rails 40
Preassemble bows 41

? General information 5
Mount bows
Preassemble end carriage
42
43
Preassemble end bow 45
Preassemble end carriage / end bow
Assembly
(for use with tarpaulin back cover) 46
Front dimensions 8 Preassemble end carriage / gantry beam (for use with doors) 47
Pre-assemble bulkhead 9 Slide up end carriage 48
Installing the bulkhead 14 End plug / stopper 49
Preparing the rear (PWP SA) 16 Rivet folding joints 50
Rear doors (PWP SA) 19 Mount safety rope 51
Guide rails 20 Safety rope – tension 52
Guide rail package 21 Build roof package 53
Installing the guide rails 33 Drill front locking hole 54
Installing pillar bases 34 Roof mounted 55

www.EdschaTS.com 2
Operation

www.EdschaTS.com 3
?

≤ 75 kg / m2 ≤2.3.
75 kg≤ 75
/m kg2 / m≤2 7
1a
1a 1a 1b
1a 1b 1b
1b
2. 2. 2.

2 ≤3.75 kg
≤ 75/kg 2 2
1b 2.
1b
2. ≤ 75
≤ 75 kg /kg
m2 /
2. m 2. 3. m/ m 3.
3.

The Edscha Trailer Systems sliding roofs and their operating com- All the arising exclusions of risk and liability
ponents are exclusively manufactured for their due employment ! shall remain valid also if:
on truck specific transport operations. Any usage going beyond
such applications is considered as misuse. For resulting damages • examiners or experts of the technical testing bodies or
the manufacturer European Trailer Systems GmbH repudiates any experts from officially recognised organisations have
liability; for this the user alone bears the full risk. The “intended performed acceptance tests;
usage” also includes the observance of the operation, care and • official approval exists.
maintenance instructions and of the mounting and repair instruc-
tions as prescribed by the manufacturer.

! • 1a 1b Remove roof loads


before starting a trip
! The manufacturer, European Trailer Systems
GmbH, is discharged from any liability if:
! • 2. Roof load ≤ 75 kg / m2

• the Edscha Trailer Systems sliding roof and its components


are changed arbitrarily
• EdschaTS original parts are exchanged against other
! • 3. Cannot be walked on

components;
• the Edscha Trailer Systems sliding roof and its operating The vehicle equipment supplier is obligated in principle to check
components are not handled and serviced in compliance whether the products shown satisfy the demands of the user.
with the prevailing Edscha Trailer Systems instructions
© 2016 European Trailer Systems GmbH
www.EdschaTS.com

4
?
General information

Structure - planning / preparation

1.0 Measure existing vehicle structure

2.0 Planning the structural extension

2.1 Taking important legal factors into account:

Permitted curb weight / total weight

Vehicle dimensions: total height / length / width

Laws / traffic safety / insurance / load safety

2.2 Taking important technical factors into account:

Vehicle structural analysis

Load capacity / material of existing structure

Planned vehicle use / loading possibilities

www.EdschaTS.com 5
?
General information

Structure - parameters / requirements

Roof track width (e.g. 2520 mm)

Structural length / height / width (e.g. 13500 x 4000 x 2550 mm)

Rear design (e.g. soft door / doors --> effect on end carriage or gantry beam)

Roof design (CS / VP / fixed posts / sliding posts)

Screws

All screws / nuts with lock / galvanised

6.8 8.8 10.9


MA (Nm)
M4 2,2 3,0 4,4
M5 4,5 5,9 8,7
M6 7,6 10 15
M8 18 25 36
M10 37 49 72
M12 64 85 125
M14 100 135 200
M16 160 210 310
M18 220 300 430
M20 310 425 610
M22 425 580 830
M24 535 730 1050
Tightening torques and rigidity classes (see table)

www.EdschaTS.com 6
?
General information

Vehicle structural analysis - forces / moments

The chassis must be capable of taking up a


bending torque ≥ 10 kNm in the area of the front frame
Prerequisite: roof with longitudinal beams

Distance between posts ≤ 3500 mm

The chassis must be capable of taking up a


bending torque ≥ 4.5 kNm in the post area
Prerequisite: load capacity ≤ 20 kN / running meter

Front wall rigidity ≥ 500 kN area load (0.4 x load capacity recommended)

The chassis must be capable of taking up a


bending torque ≥ 40 kNm in the area of the rear frame
Prerequisite: load capacity ≤ 270 kN

Correct realisation

Tools

Execution of welded seams

Tolerances

Aids

Quality control, tests


www.EdschaTS.com 7
?

Mb ≥ 5 kNm Mb ≥ 5 kNm

25
≥120 70
25 FH
98 337,5
337,5
98
A

18

Front dimensions
Process step: Preparation of the base frame

Process: Measurement and drilling

Parameters: Edscha TS bulk head

Material: Edscha TS bulk head

Tools: drilling machine

Aids: Folding rule, centre punch

Preparation: Measurement and drilling

www.EdschaTS.com 8
?

2
C= A - 785mm

D = B - ~150mm

m
-7 85m
C= A 18
A

Pre-assemble bulkhead 01
Process step: pre-assemble bulkhead

Process: Mount individually cut front plate

Parameter: Platform width, installation height

Material: Plywood panel, bulkhead elements (2021), screws

Tools: measurement/marking tools, saw, drilling machine, screw driver

Aids:

Preparation:

www.EdschaTS.com 9
?

Pre-assemble bulkhead 02
Process step: pre-assemble bulkhead

Process: Mount bulkhead cover (adjust if necessary)



Parameters: Installation width, roof track width

Material: Edscha TS bulkhead cover (2021), screws

Tools: torque wrench, screw driver

Aids:

Preparation:

www.EdschaTS.com 10
?

Pre-assemble bulkhead 03
Process step: pre-assemble bulkhead

Process: Mount assembly sets



Parameters: roof track width, guide rail package

Material: Edscha TS Montagesätze

Tools: torque wrench

Aids:

Preparation:

www.EdschaTS.com 11
?

FH

Pre-assemble bulkhead 04
Process step: pre-assemble bulkhead

Process: Mount support angle (adjust if necessary)

Material: Edscha TS support angle, screws

Tools: Screw driver

Aids:

Preparation:

www.EdschaTS.com 12
?

Pre-assemble bulkhead 05
Process step: pre-assemble bulkhead

Process: Mount protective plate (adjust if necessary)

Material: Edscha TS protective plate, screws / rivets

Tools: Riveting pliers / screwdriver

Aids:

Preparation:

www.EdschaTS.com 13
?

7
1.

3.
2. 3.

Installing the bulkhead 01


Process step: installing the bulkhead

Process: Align bulkhead and mount

Parameter: Platform width

Material: Pre-mounted Edscha TS bulkhead

Tools: torque wrench, wrench

Aids: crane

Preparation:

www.EdschaTS.com 14
?

3.

Installing the bulkhead 02


Process step: installing the bulkhead

Process: Screw bulkhead on

Parameter: Torques

Material: pre-assembled Edscha TS bulk head

Tools: torque wrench, wrench

Aids:

Preparation:

www.EdschaTS.com 15
?

Mb ≥ 40 kNm

Mb ≥ 40 kNm

80

150
40
8
Ø1
128 30

Preparing the rear 01


Process step: preparing the rear

Process: Drill holes for rear frame

Parameters: Platform width, requirements PWP SA

Material:

Tools: measurement/marking tools, drilling machine

Aids:

Preparation:

www.EdschaTS.com 16
?

10

Preparing the rear 02


Process step: preparing the rear

Process: Screws on rear pillars

Parameters: Platform width, requirements PWP SA

Material: Edscha TS rear pillars 2102, attachment materials

Tools: wrench, torque wrench

Aids:

Preparation:

www.EdschaTS.com 17
?

11

1.

2.

Preparing the rear 03


Process step: preparing the rear

Process: Mount assembly sets

Parameters: roof track width, guide rail package

Material: Edscha TS assembly sets, attachment material

Tools: wrench, torque wrench

Aids:

Preparation:

www.EdschaTS.com 18
?

12

Rear doors (PWP SA)


Process step: installation rear frame / rear doors

Process: installation rear frame / rear doors

Parameters: Platform width, installation height, requirements PWP SA

Material: Edscha TS rear frame (2102)

Tools: torque wrench, wrench

Aids: crane

Preparation: See assembly instructions PWP Defender


Assembly instructions PWP Defender:
http://bit.ly/29gZDjr (Sandwich)
http://bit.ly/29qllzM (Snaplock)

www.EdschaTS.com 19
?

13

Sliding pillar Fixed pillar

Guide rails
Process step: mount guide rails

www.EdschaTS.com 20
?

14

~250 mm

~50 mm

Guide rail package 01


Weld CurtainSider profile and sliding pillar profile
(top)

www.EdschaTS.com 21
?

15

~50
mm
~25
0m
m

Guide rail package 02


Weld CurtainSider profile and sliding pillar profile
(base)

www.EdschaTS.com 22
?

16

0 mm
~25
mm
~50

! See page 38 and


consecutive pages

Guide rail package 03


Weld running rail and rectangular tube
(top)

www.EdschaTS.com 23
?

17

~5
0
m
m
~2
50
m
m

Guide rail package 04


Weld running rail and rectangular tube
(base)

www.EdschaTS.com 24
?

18

Guide rail package 05


Join welded profile packages

www.EdschaTS.com 25
?

19

~2
50
m
m
~5
0
m
m

Guide rail package 06


Weld profile packages
(outside)

www.EdschaTS.com 26
?

20

mm
50
~2
m
0m
~5

Guide rail package 07


Weld profile packages
(inside)

www.EdschaTS.com 27
?

21

Guide rail package 08


Join welded profile package with stabilisation tube

www.EdschaTS.com 28
?

22
m
~250 m
m
~50 m

Guide rail package 09


Weld profile package (with a high profile weight or long
self-supporting lengths the profiles may need to be welded with
preload, see following illustrations)

www.EdschaTS.com 29
?

23

2.

2.

a a

1.

0 0
0 + X mm

Guide rail package 10


Weld profile package with preload.
Compensate profile deflection through counterload on profile.

www.EdschaTS.com 30
?

24

0 0
0 + X mm

~50 mm
~250 mm

Guide rail package 11


Join welded profile packages
(base)

www.EdschaTS.com 31
?

25

0 mm
~25

0 mm
~5

0 0
0 + X mm

Guide rail package 12


Join welded profile packages
(top)

www.EdschaTS.com 32
?

26

Installing the guide rails

www.EdschaTS.com 33
?

27

x
x
x ≤ 4000
x

Installing pillar bases 01


Process step: installing pillar bases

Process: installing pillar bases



Parameters: Installation length

Material: Edscha TS pillar bases (LP2)

Tools: measurement/marking tools

Aids:

Preparation:

www.EdschaTS.com 34
?

28

25

50

13

min. 100mm

Mb ≥ 4,5 kNm

Installing pillar bases 02


Process step: installing pillar bases

Process: installing pillar bases



Parameters: Platform height

Material: Edscha TS pillar bases (LP2)

Tools: measurement/marking tools, drilling machine

Aids:

Preparation:

www.EdschaTS.com 35
?

29

Detail 1. *
Profilschlitz
1.

2.

Inserting sliding pillars


*Notch to be performed by customer

www.EdschaTS.com 36
?

30

4.

1.

2.

3.

Hook in sliding pillars

www.EdschaTS.com 37
?

31

Installing batten pockets

www.EdschaTS.com 38
?

32

Installing battens

www.EdschaTS.com 39
?

33

! See page 21 and


consecutive pages

90° b

ab

Guide rails
The rails must be mounted in parallel within a maximum
angle deviation of ± 1° and must be braced against rotation
at the same height in order to ensure perfect roof running.
Measurement a b -> see figure 48

www.EdschaTS.com 40
?

34

20 Nm
1.
2.

20 Nm

2.
1.

Preassemble bows
Push the bow bracket (right / left) onto the bow from the outside
until the provided mounting holes align. Fasten the bulkhead
bow bracket to the bow on both sides, using the pan head screw
M8x50 and locknut M8 (torque: 20 Nm)

www.EdschaTS.com 41
?

35

Mount bows

www.EdschaTS.com 42
?

36

Preassemble end carriage 01


Carry out process on both sides

www.EdschaTS.com 43
?

37

2.

1.

Preassemble end carriage 02

www.EdschaTS.com 44
?

38

Preassemble end bow


Carry out process on both sides

www.EdschaTS.com 45
?

39

Preassemble end carriage /


end bow (for use with tarpaulin back cover)

www.EdschaTS.com 46
?

40

Preassemble end carriage /


gantry beam (for use with doors)

www.EdschaTS.com 47
?

41

Slide up end carriage


Push the pre-assembled end carriage into the provided
chambers of the running rail profiles.

www.EdschaTS.com 48
?

42

20 N
! 10 U m
/min
max.

End plug / stopper


Carry out process on both sides

www.EdschaTS.com 49
?

43

Rivet folding joints

www.EdschaTS.com 50
?

44

Mount safety rope


Must be securely connected to vehicle bulkhead

www.EdschaTS.com 51
?

45

≥ 40 mm

Safety rope – tension


Carry out process on both sides

www.EdschaTS.com 52
?

46

~25 1.
0

2. (see figure 47)

Build roof package

www.EdschaTS.com 53
?

47

10

Drill front locking hole

www.EdschaTS.com 54
?

48

Roof mounted
Difference measurement ‘a’ to ‘b’ when closed ≤ ± 2 mm.
All bows and the end carriage must have the same width within
a tolerance of ± 2 mm in order to allow perfect running of the
roof.

www.EdschaTS.com 55
?

Structural components side curtains


Post position

cm cm cm

Front

Distance between tarpaulin eyelets with expander cable from the front

cm

Length and width of roof

Exact length of roof: cm

Exact width of roof cm

x cm
Front Rear

56
No. 808 837

Your sales partner in India:

European Trailer Systems


c/o RINGFEDER POWER TRANSMISSION INDIA PRIVATE LIMITED
Subject to technical changes · 07 / 2016

Plot No. 4, Door No. 220, Mount-Poonamallee Road, Kattupakkam,


Chennai – 600 056, India
Phone: +91 (0) 44-2679 1411 · Fax: +91 (0) 44-2679 1422
E-mail:sales.india@EdschaTS.com

European Trailer Systems GmbH


Im Moerser Feld 1f, 47441 Moers, Germany
Phone: +49 (0) 2841 6070 700 · Fax: +49 (0) 2841 6070 333 Das Original

www.EdschaTS.com

You might also like