Traffic Plan Mostorod
Traffic Plan Mostorod
Traffic Plan Mostorod
Traffic Plan
Area 1 Area 2
Area 3 Area 4
This activity will be divided into 4 working area to prevent the full stoppage of the operation, starting by this U-shape
side as explained above layout in coordination with management and safety Responsible at TOTAL MOSTOROD
GASOIL Tanks Outlet Pipeline from between GASOIL and GASOLINE Tanks Dike:
▪ Dump truck will go backward carefully to The bridge between the tanks.
▪ New Soil and Materials will be stored near the excavation with a sufficient distance
▪ The rubble/debris is to be removed manually from the working area to the dump truck as per requirements (on
daily basis) transferring it (in an authorized Landfill Area)
Precautions:
▪ Banksman with reflective vest and Two Colored Flags (Green, Red) will Guide the trucks with the assistant of
Safety supervisor at the turns.
▪ Ensure that the driver has a clear view and avoid obstacles and working areas
Area 1:
▪ At the first Excavation phase, Entrance Gate will work as (Entrance + Exit), Dump / Delivery and Concrete Mixer
Trucks will take the road around the site.
▪ New Soil and Materials will be stored near the excavation with a sufficient distance
Precautions:
▪ Banksman with reflective vest and Two Colored Flags (Green, Red) will Guide the trucks with the assistant of
Safety supervisor at the turns.
▪ Ensure that the driver has a clear view and avoid obstacles and working areas
Area 1:
▪ After the soil replacement, Entrance and Exit will return to normal.
▪ New Soil and Materials will be stored near the excavation with a sufficient distance
Precautions:
▪ Banksman with reflective vest and Two Colored Flags (Green, Red) will Guide the trucks .
▪ Ensure that the driver has a clear view and avoid obstacles and working areas