Sr No Item UOM Qty Rate Amount

1 Excavation Cum 0.07 60 4.2


2 PCC Material Rate Cum 0.07 3000 210
3 PCC Labour Rate Cum 0.07 600 42
4 RCC (Material Rate) Cum 0.294 3600 1058.4
5 RCC (Labour Rate) Cum 0.294 800 235.2
6 Shuttering Sqmt 2.576 158 407.008
7 Reinforcement (Material Rate) MT 0.008 66000 528
8 Reinforcement (Labour Rate) MT 0.008 6000 48
Total Cost 2532.8
Labour Cost 690.2
Add 15% OH & Profit for Labour Cost 103.5
Final Labour Cost 793.7
say
per RMT