Republic of the Philippines

Department of Education
REGION XII
DIVISION OF SULTAN KUDARAT
MAGANAO ELEMENTARY SCHOOL
Maganao Palimbang Sultan Kudarat

PROJECT PROPOSAL
PP No.: 2022-11-008

I. Project Title: To construct handwashing facility


II. Proponent: MAGANAO ELEMENTARY SCHOOL
III. Location: Maganao Palimbang Sultan Kudarat
IV. Duration: Nov-22
V. Project Beneficiaries: Maganao ES Faculty, Staff, Students and Stakeholders

Hand washing helps prevent the spread of germs and bacteria. Hands are the most
VI. Rationale: contaminated parts to wash. Water should flow from the least to the most
contaminated area, rinsing microorganisms into the sink.
1. to educate children and their caregivers on how to prevent common
VII. Goals/Objectives:
health problems by developing proper hand-washing skills.
2. to increase children's knowledge of positive health behaviors and enhance wellness
VIII. Budget Requirements:

ITEM
Total Remarks
DESCRIPTION
I. MATERIAL COST 24285.00
II. LABOR COST 8499.75
III. INCIDENTAL
1067.97
EXPENSES
IV. TOTAL COST ₱33,852.72

IX. Cooperating Agencies:


1. Division Office
2. School Repair and Maintenance Committee
3. School Physical Facilities Coordinator
X. Program/PAPs: RM-Building and Other Structure/GAD FUND

Prepared by:

ADTIS A. ABUBAKAR
School Head

Validated by: Checked and Reviewed:

NISREEN AMERAH D. WAYA ENGR. VIRGIL GLENN D. VEGO


Senior Bookkeeper Engineer III

APPROVED:

LEONARDO M. BALALA, CESE


Schools Division Superintendent

Address: Kenram, Isulan, Sultan Kudarat


Telephone No.: (064) 471 1007
Website: https://depedsultankudarat.org Email: depedsk.r12@deped.gov.ph
Republic of the Philippines
Department of Education
REGION XII
DIVISION OF SULTAN KUDARAT
MAGANAO ELEMENTARY SCHOOL
Maganao Palimbang Sultan Kudarat

PROGRAM OF WORKS
PP No.: 2022-11-008
PROJECT TITLE: To construct handwashing facility
BUDGET ALLOCATION: PHP 33,852.72
SOURCE OF FUNDS: School MOOE
PERIOD COVERED: Nov-22

Unit Cost Total Cost


No. Description Unit Quantity TOTAL
Material Labor Material Labor
1 Holcim Cement bags 35 265 92.75 9275 3246.25 12,521
2 Def Bar 12mm pcs 25 180 63 4500 1575 6,075
3 Blue pipe length 10 90 31.5 900 315 1,215
4 Faucet pcs 20 180 63 3600 1260 4,860
5 Sink pcs 12 270 94.5 3240 1134 4,374
6 PVC Hose PVC horse 2 1385.00 484.75 2770 969.5 3,740

Total Cost of Materials 24285.00


Incidental Expenses 1067.97
Labor Cost 8499.75
Grand Total 33852.72

Prepared by:

ADTIS A. ABUBAKAR
School Head

Validated by: Checked and Reviewed:

NISREEN AMERAH D. WAYA ENGR. VIRGIL GLENN D. VEGO


nior Bookkeeper Engineer III

APPROVED:

LEONARDO M. BALALA, CESE


Schools Division Superintendent

Address: Kenram, Isulan, Sultan Kudarat


Telephone No.: (064) 471 1007
Website: https://depedsultankudarat.org Email: depedsk.r12@deped.gov.ph