Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

30,000

10,175 150 3,000 150 1,400 150 3,350 150 3,800 150 3,400 150 3,000 150 825

1,500

1,500
BACKYARD BACKYARD

150
1,475 150

1,475 150
1,350 150
Balcony Laundry Balcony

RG
Kitchen

2,400
2,850

Kitchen

3,785
Dining

RG
Bedroom 01
Bedroom 01

150
150

1,250 150
Kitchen Store

1,250

150
3,800
2,850

PARKING AREA Dining

940
Bedroom 02

100
Lobby

875
150

150
1,350
20,000

20,000
ROAD

3,350
150

Bedroom 02

Lounge Lounge
3,350

150
Master Access
Bedroom Lobby

1,350
Access
Lobby
150

150
5,875

Access

5,875
LAWN

8,975
Access

10,175 150 4,050 150 3,850 150 2,350 150 4,850 150 3,000 150

30,000

ROAD

SITE LAYOUT
Project: Consultant's: Location Title: Design by: Chumba Checked by: ARCHITECTURAL NOTES
. FIRE NOTES
. Revision Date Revision Date
7. All inspection chambers in drive area to have
1. All works to be carried out in accordance with Local 1. Automatic booster pump for FHRs to be provided to
PROPOSED DEVELOPMENT Drawn by: Chumba heavy duty covers.
Zephaniah Authority regulations
. the satisfaction of the Chief Fire Officer
.
ON LR.No.................... 2. All figured dimensions to be taken in preference
8. Check all dimensions on site.
2. 4500 litres reserve for hose reel
to scaled dimensions. 9. All sanitary work to be in accordance with MOH rules 3. Electrical fire alarm system to the approval of Chief Fire Officer
.
Drawing Title: Scale: Date: 3. All walls below200mm to be reinforced with hoop and regulations and NCC requirements.
iron at every alternative course.
Ambassadors Court, 2nd Floor, Suite E3 1:100 MAR 2024 10. 500g polythene sheeting and anti-termite treatment
4. Fire alarm and booster to be provided with
Client: NELSON Opposite Maxwell SDA Church, Milimani road 4. Provide damp proof course (D.P.C.) under all walls.
5. P.V. indicates permanent ventilations.
to be provided under ground floor concrete slab.
secondary power supply.
P.O Box 7779-00100-Nairobi. Drawing: Status: Drawing Number: Status: 5. 2x9 kg Dry Powder Fire Extinguishers at parking areas
.
6. All drainage passing under building and drive
Mobile: +254702317785, 11. All reinforced concrete works to Structural Eng
. detail.
Client's sign: ........................... Email:trimaxidgconsult@gmail.com PROPOSAL 01 PROPOSAL area to be of pvc pipe and encased in 150mm 6. 2x9 litre water and1x4.5 kg CO2 fire extinguishers
thick concrete surround. to be provided per floor.
30,000
10,175 150 3,000 150 1,400 150 3,350 150 3,800 150 3,400 150 3,000 150 825

1,500

1,500
BACKYARD BACKYARD

150
1,475 150

1,475 150
1,350 150
Balcony Laundry Balcony

RG
Kitchen

2,400
2,850

Kitchen

3,785
Dining

RG
Bedroom 01
Bedroom 01

150
150

1,250 150
Kitchen Store

1,250

150
3,800
2,850

PARKING AREA Dining

940
Bedroom 02

100
Lobby

875
150

150
1,350
20,000

20,000
ROAD

3,350
150

Bedroom 02

Lounge Lounge
3,350

150
Master Access
Bedroom Lobby

1,350
Access
Lobby
150

150
5,875

Access

5,875
LAWN

8,975
Access

10,175 150 4,050 150 3,850 150 2,350 150 4,850 150 3,000 150

30,000

GROUND FLOOR LAYOUT ROAD


Project: Consultant's: Location Title: Design by: Chumba Checked by: ARCHITECTURAL NOTES
. FIRE NOTES
. Revision Date Revision Date
7. All inspection chambers in drive area to have
1. All works to be carried out in accordance with Local 1. Automatic booster pump for FHRs to be provided to
PROPOSED DEVELOPMENT Drawn by: Chumba heavy duty covers.
Zephaniah Authority regulations
. the satisfaction of the Chief Fire Officer
.
ON LR.No.................... 2. All figured dimensions to be taken in preference
8. Check all dimensions on site.
2. 4500 litres reserve for hose reel
to scaled dimensions. 9. All sanitary work to be in accordance with MOH rules 3. Electrical fire alarm system to the approval of Chief Fire Officer
.
Drawing Title: Scale: Date: 3. All walls below200mm to be reinforced with hoop and regulations and NCC requirements.
iron at every alternative course.
Ambassadors Court, 2nd Floor, Suite E3 1:100 MAR 2024 10. 500g polythene sheeting and anti-termite treatment
4. Fire alarm and booster to be provided with
Client: NELSON Opposite Maxwell SDA Church, Milimani road 4. Provide damp proof course (D.P.C.) under all walls.
5. P.V. indicates permanent ventilations.
to be provided under ground floor concrete slab.
secondary power supply.
P.O Box 7779-00100-Nairobi. Drawing: Status: Drawing Number: Status: 5. 2x9 kg Dry Powder Fire Extinguishers at parking areas
.
6. All drainage passing under building and drive
Mobile: +254702317785, 11. All reinforced concrete works to Structural Eng
. detail.
Client's sign: ........................... Email:trimaxidgconsult@gmail.com PROPOSAL 01 PROPOSAL area to be of pvc pipe and encased in 150mm 6. 2x9 litre water and1x4.5 kg CO2 fire extinguishers
thick concrete surround. to be provided per floor.
30,000
10,175 150 3,000 150 1,400 150 3,350 150 2,350 150 21 3,329 150 1,350 150 3,000 150 825

2,975

2,975
150

150
F
2,850

Laundry

3,800
Bedroom 01
Kitchen Bedroom 03

RG
Bedroom 04
150

150
2,850

Dining
Bedroom 02 Lobby Laundry /linen

1,900
store/ Ironing
area
150

150
1,350
20,000

20,000
1,875
w.i.c

100
150

Master
Bedroom
Lounge

1,375
3,350

Master
Access

150
Bedroom
Lobby

1,350
Balcony
150

150
5,875

5,875
9,050 20,950

10,175 150 4,050 150 3,850 150 2,350 150 4,850 150 3,000 150 825

30,000

FIRST FLOOR LAYOUT


Project: Consultant's: Location Title: Design by: Chumba Checked by: ARCHITECTURAL NOTES
. FIRE NOTES
. Revision Date Revision Date
7. All inspection chambers in drive area to have
1. All works to be carried out in accordance with Local 1. Automatic booster pump for FHRs to be provided to
PROPOSED DEVELOPMENT Drawn by: Chumba heavy duty covers.
Zephaniah Authority regulations
. the satisfaction of the Chief Fire Officer
.
ON LR.No.................... 2. All figured dimensions to be taken in preference
8. Check all dimensions on site.
2. 4500 litres reserve for hose reel
to scaled dimensions. 9. All sanitary work to be in accordance with MOH rules 3. Electrical fire alarm system to the approval of Chief Fire Officer
.
Drawing Title: Scale: Date: 3. All walls below200mm to be reinforced with hoop and regulations and NCC requirements.
iron at every alternative course.
Ambassadors Court, 2nd Floor, Suite E3 1:100 MAR 2024 10. 500g polythene sheeting and anti-termite treatment
4. Fire alarm and booster to be provided with
Client: NELSON Opposite Maxwell SDA Church, Milimani road 4. Provide damp proof course (D.P.C.) under all walls.
5. P.V. indicates permanent ventilations.
to be provided under ground floor concrete slab.
secondary power supply.
P.O Box 7779-00100-Nairobi. Drawing: Status: Drawing Number: Status: 5. 2x9 kg Dry Powder Fire Extinguishers at parking areas
.
6. All drainage passing under building and drive
Mobile: +254702317785, 11. All reinforced concrete works to Structural Eng
. detail.
Client's sign: ........................... Email:trimaxidgconsult@gmail.com PROPOSAL 01 PROPOSAL area to be of pvc pipe and encased in 150mm 6. 2x9 litre water and1x4.5 kg CO2 fire extinguishers
thick concrete surround. to be provided per floor.
30,000
10,175 150 4,050 150 3,850 150 2,350 150 3,850 150 4,000 150 825

2,375

2,375
600 150

600 150
F F

Laundry Kitchen Kitchen Laundry

RG

RG
Bedroom 01 Bedroom 01
3,800

3,800
150

150
Dining Dining
1,900

1,900
150

150
1,350

1,350
20,000

20,000
150

150
Lounge Lounge
3,350

3,350
Master Master
Access
Bedroom Bedroom
Lobby
150 600

150 600
5,275

5,275
10,175 150 4,050 150 3,850 150 2,350 150 3,850 150 4,000 150 825

30,000

SECOND FLOOR LAYOUT


Project: Consultant's: Location Title: Design by: Chumba Checked by: ARCHITECTURAL NOTES
. FIRE NOTES
. Revision Date Revision Date
7. All inspection chambers in drive area to have
1. All works to be carried out in accordance with Local 1. Automatic booster pump for FHRs to be provided to
PROPOSED DEVELOPMENT Drawn by: Chumba heavy duty covers.
Zephaniah Authority regulations
. the satisfaction of the Chief Fire Officer
.
ON LR.No.................... 2. All figured dimensions to be taken in preference
8. Check all dimensions on site.
2. 4500 litres reserve for hose reel
to scaled dimensions. 9. All sanitary work to be in accordance with MOH rules 3. Electrical fire alarm system to the approval of Chief Fire Officer
.
Drawing Title: Scale: Date: 3. All walls below200mm to be reinforced with hoop and regulations and NCC requirements.
iron at every alternative course.
Ambassadors Court, 2nd Floor, Suite E3 1:100 MAR 2024 10. 500g polythene sheeting and anti-termite treatment
4. Fire alarm and booster to be provided with
Client: NELSON Opposite Maxwell SDA Church, Milimani road 4. Provide damp proof course (D.P.C.) under all walls.
5. P.V. indicates permanent ventilations.
to be provided under ground floor concrete slab.
secondary power supply.
P.O Box 7779-00100-Nairobi. Drawing: Status: Drawing Number: Status: 5. 2x9 kg Dry Powder Fire Extinguishers at parking areas
.
6. All drainage passing under building and drive
Mobile: +254702317785, 11. All reinforced concrete works to Structural Eng
. detail.
Client's sign: ........................... Email:trimaxidgconsult@gmail.com PROPOSAL 01 PROPOSAL area to be of pvc pipe and encased in 150mm 6. 2x9 litre water and1x4.5 kg CO2 fire extinguishers
thick concrete surround. to be provided per floor.
30,000
10,175 150 4,050 150 3,850 150 2,350 150 3,850 150 4,000 150 825

2,375

2,375
600 150

600 150
F F

Laundry Laundry
Kitchen Kitchen

RG

RG
Bedroom 01 Bedroom 01
3,800

3,800
150

150
1,900

1,900
Lounge Lounge
150

150
W W
20,000

20,000
4,850

4,850
ROOF TERRACE ROOF TERRACE
150

150
5,875

5,875
10,175 150 3,000 150 900 150 3,850 150 2,350 150 3,850 150 900 150 2,950 150

30,000

ROOF TERRACE LAYOUT


Project: Consultant's: Location Title: Design by: Chumba Checked by: ARCHITECTURAL NOTES
. FIRE NOTES
. Revision Date Revision Date
7. All inspection chambers in drive area to have
1. All works to be carried out in accordance with Local 1. Automatic booster pump for FHRs to be provided to
PROPOSED DEVELOPMENT Drawn by: Chumba heavy duty covers.
Zephaniah Authority regulations
. the satisfaction of the Chief Fire Officer
.
ON LR.No.................... 2. All figured dimensions to be taken in preference
8. Check all dimensions on site.
2. 4500 litres reserve for hose reel
to scaled dimensions. 9. All sanitary work to be in accordance with MOH rules 3. Electrical fire alarm system to the approval of Chief Fire Officer
.
Drawing Title: Scale: Date: 3. All walls below200mm to be reinforced with hoop and regulations and NCC requirements.
iron at every alternative course.
Ambassadors Court, 2nd Floor, Suite E3 1:100 MAR 2024 10. 500g polythene sheeting and anti-termite treatment
4. Fire alarm and booster to be provided with
Client: NELSON Opposite Maxwell SDA Church, Milimani road 4. Provide damp proof course (D.P.C.) under all walls.
5. P.V. indicates permanent ventilations.
to be provided under ground floor concrete slab.
secondary power supply.
P.O Box 7779-00100-Nairobi. Drawing: Status: Drawing Number: Status: 5. 2x9 kg Dry Powder Fire Extinguishers at parking areas
.
6. All drainage passing under building and drive
Mobile: +254702317785, 11. All reinforced concrete works to Structural Eng
. detail.
Client's sign: ........................... Email:trimaxidgconsult@gmail.com PROPOSAL 01 PROPOSAL area to be of pvc pipe and encased in 150mm 6. 2x9 litre water and1x4.5 kg CO2 fire extinguishers
thick concrete surround. to be provided per floor.

You might also like