(TYP.)
150
BARRETTE CUT-OFF LEVEL
MECHANICAL
COUPLER
300
A A
- -
4000
04 05 06
+
01 + 02
01 + 02
01
B B 01 + 02 02
- -
6000
06 06
TREMIE 05 TREMIE 05
PIPE (TYP) PIPE (TYP)
06 06
04 04
1200
NOTES:- BAR
DESCRIPTIONS SHAPES REMARKS
NOS.
1. CONCRETE TO BE GRADE M40 (MIN.) 01 T16 @ 135 c/c
2. THE CLEAR COVER FOR ALL BARRETTE SHALL BE 80MM ON
ALL SIDES. 02 T16 @ 135 c/c BUNDLE WITH 01
03 NOT USED
0 500 1000 1500 2000 2500 mm 0 250 500 750 1000 1250 mm
SCALE 1:50 SCALE 1:25 CONSTRUCTION REFERENCE DRAWING
fnYyh EksVªks jsy dkiksZjs'ku fyfeVsM
DELHI METRO RAIL CORPORATION LTD.
1. PC08R-SYS-BMU-ST-DWG-11031 TO 11033
L&T CONSTRUCTION
THIS DRAWING IS THE PROPERTY OF
2. PC08R-SYS-BMU-ST-DWG-11015 & 11016 DELHI METRO RAIL CORPORATION LTD. Design and Construction of Single Tunnel (SUBWAY)
3. PC08R-SYS-BMU-ST-DWG-11021 & 11022 Metro Bhawan , Fire Brigade Lane, Barakhamba Road, New Delhi-110001 L&T Headquarters, Mount Poonamallee High Road, between Bihar Museum and Patna Museum by Shield
4. PC08R-SYS-BMU-ST-DWG-11041 Vatika Mindscapes, Tower-B, 12/3 Mathura Road, NH-2,
5. PC08R-SYS-BMU-ST-DWG-11051 & 11052 NOTICE OF 'NO OBJECTIONS' FROM EMPLOYER'S REPRESENTATIVES: Manapakkam, Post Box - 979,
Sector-27/D Faridabad, Haryana-121013, PH: 0129 668 5600 TBM, Fire Escapes, Ancillary building, Entry/exit building
"Notice of No Objections"from Employer is being accorded for design principles.However the overall responsibility for the detailing Chennai - 600089 including Architectural Finishing, Water Supply, Sanitary
and design accuracy lies with Design and Build Contractor Installation and Drainage works at Patna.
uke gLrk{kj fnukad uke gLrk{kj fnukad
BY SYSTRA
BY CONTRACTOR
DELHI METRO RAIL CORPORATION LTD. NAME SIGNATURE DATE NAME SIGNATURE DATE lajpuk सुरंग i`"B la[;k
ACCEPTED BY
KAREKAR
J.E. (DESIGN) Reviewed fMTkkbZu DBK Deepika
Digitally signed by KAREKAR Deepika
Balkrishna
DN: cn=KAREKAR Deepika Balkrishna,
TITLE :
SCALE AS SHOWN
lgizca/kd@izca/kd (vfÒdYiu) lehf{kr
c=IN, o=SYSTRA, ou=Engineer -
CE. (DESIGN) Reviewed & comments as marked on Drawing DESIGN QUALITY ASSURANCE VERIFIED
AAP Alhad Abhay
c=IN, o=SYSTRA, ou=Principal
Engineer- Structures,
email=aapanwalkar@systra.com
Date: 2024.05.08 14:32:42 +05'30' A CRD SUBMISSION FIRST ISSUE 08-05-2024 REINFORCEMENT DETAILS STATUS C
ifj;kstuk izca/kd THE RESPONSIBILITY OF CONTROL CHECK & VERIFICATION OF ACCURACY
This drawing is the property of L&T CONSTRUCTION-HEAVY CIVIL INFRASTRUCTURE, EDRC and must
not be passed on to any person or body not authorized by us to receive it nor be copied or otherwise made
SSK DBK MNA AAP
PROJECT MNGR.
eq[; ifj;kstuk izca/kd
CORRECTNESS COMPLETENESS INTEGRATION & FULL COMPLIANCE OF
CONTRACT PROVISIONS IN RESPECT OF DESIGN ANALYSIS & DRAWING
use either in full or in part by such person or body without our prior permission in writing.
la'kks/ku fooj.k fnukad fod`r fMTkkbZu tkap lR;kfir fp=kadu la[;k la'kks/ku
ENGR./CPM
Reviewed and no Objection issued with
comments as marked on Drawing RESTS WITH THE DESIGN CONSULTANT AND CONTRACTOR. REV. DESCRIPTION DATE DRN. DGN. CHD. VERIFIED DRAWING NO. PC08R-SYS-BMU-ST-DWG-11053 REV.
A
Size A1