Installation No:22321114 Billing Date:01.10.2023 Supply Voltage(KV):0.40 NIKUNJ AGARWAL Billing Cycle:SEP,2023 Contract Demand(KVA):118.00 209, A.J.C. BOSE ROAD GROUND FLOOR Present Reading Date:01.10.2023 Solar PV Capacity(Kwp): KOLKATA Previous Reading Date:01.09.2023 PF:0.9987 Pin - 700017 Service At:AMTA INDUSTRIAL PARK, LF%:8.8462 Country:India BILL No:000900001646 Nature Of industry: COMMERCIAL Account Reference No:25246012 Pan No:BGQPA8551B Consumer No: 000900001646
Meter No GL5B0118 Type TOD MC 1 MF 1.000 Loss Factor 1 Net MF 1
00 Meter Readings KVAH KWH KVA / Dt. & Time of MD Time Normal Peak Off-peak Normal Peak Off-peak Normal Peak Off-peak Present 68465.000 116190.00 67912.000 68276.780116177.62 67899.760 21.680 24.000 20.160 0 0 Previous 66448.620 113275.00 66455.000 66264.260113265.38 66444.480 29.09.23 24.09.23 17.09.23 0 0 16:45:00 19:30:00 23:15:00 KVAH KWH KVA Reading Advance 2016.380 2915.000 1457.000 2012.520 2912.240 1455.280 21.680 24.000 20.160 * Net MF Energy Charge Normal Peak Off-peak Energy/Min Charge(Rs) 50116.60 Rate EC(p/KWH) 712 993 472 Rebate on EC(Rs.) 0.00 P.F.Reb(-)/Sur(+)(%onEC) -8.00 -9.00 -7.00 L.F.Reb(-)/Sur(+)(p/KWH) 35 Addl.EC(Rs.) 0.00 Chargeable KWH 2012.520 2912.240 1455.280 Total EC(Rs.) 50116.60 !EC Amount Rs. 14329.1400 28918.5400 6868.9200 Chargeable PF 0.9981 0.9991 0.9988 PF Rs. -1146.33 -2602.67 -480.82 Demand Charge *Demand Charge 27000.00 Rate Normal(Rs/KVA/month) 270.00 Addl.DC(Rs.) 0.00 Chargeable Normal KVA 100.00 Total DC(Rs.) 27000.00 Addl.KVA Reb on DC(on TP) Rebate(-)/Surcharge(+) (Rs.) LF Reb(-)/Sur(+) 2233.01 PF Reb(-)/Sur(+) -4229.82 MVCA Charges @0.00 Paise/KWH 0.00 ###Government subsidy ## Other Arrear Charges 0.00 Electricity Duty EDIM Units 00.00 %On Net Charge 0.00 Net ED(Rs.) 11155.29 EDCOM Units 6380.04 %On Net charge 15.00 Exemption (Rs.) EDFUR Units 00.00 %On Net charge 0.00 #Arrear ED(Rs.) 0.00 ED DOM Units 00.00 %On Net charge 0.00 ED Adjust (Rs) Total ED(Rs.) 11155.29 Other Charges & Outstanding (Rs.) Rental of Meter/Meters 1200.00 Amnt. For Current Month(Rs) 87475.08 Transformer Rental + GST 0.00 Due Date : 11.10.2023 E.C adjustment Outstanding Amount(Rs.): # 0.00 D.C adjustment Adjustment Amount (Rs) : -0.24 Other adjustment Adjustment Amount1(Rs): ~~ 0.00 LPSC Charges 0.00 Payable by DueDate(Rs): 86724.00 Adjustments -0.24 Payable After DueDate(Rs): 87475.00 Timely Payment Rebate -751.20 ~Addl LF Rebate for Timely Payment 0.00 Payable by DueDate Total Timely Payment Rebate -751.20 Through NEFT/RTGS(RS): 85980.00 Amount Before Due Date(Rs) Eighty six thousand seven hundred twenty four rupees Amount After Due date(Rs) Eighty seven thousand four hundred seventy five rupees Messages to consumer Register your mobile No. and email Id at www.wbsedcl.in to get Billing and Payment info. Payment may be made using RTGS/NEFT in your exclusive a/c no: WBB90000164622321114 with IFSC code ICIC0000104 *Demand Charge includes interruption benefit of 00:00:00 hours As a Go Green initiative,you may opt for the E-Bill facility instead of Paper bill and avail Rebate of Rs 5.
Superintending Engineer/Divisional Engineer
For and on behalf Of West Bengal State Electricity Distribution Company Limited