Download as pdf
Download as pdf
You are on page 1of 10
Project Page 1 Location BILL OF MATERIALS Unit Total Description of Material Quantity | Unit | cose coal 1. FOUNDATION, CONCRETE COLUMNS, BEAMS ‘AND CONCRETE HOLLOW BLOCKS WALLS Portland Cement, ATLAS brand 450 | Bag | 6500 ‘Washed Sand 30 | cum | 250.00 Gravel or Crushed Stones 45 | cum | 350.00 Ezrth Fil 15 | cum | 9000 ‘Cone. Holl. Giks., 100 x 200 x 400mm, JACKBILT 1,350 | Piece | 4.00 Do, | 150%x200x 400mm, JACKBILT 2900 | Piece | 450 ‘Steel Reinforcing Bars, Deformed: (PAG-ASA brand) ‘10mm x 6.00 meters 350 | Piece | 45.00 ‘12mm 6.00 meters 120 | Piece | 95.00 16mm x 6,00 meters 65 | Piece | 150.00 ‘We No. 16 for Tying 30 | Kio | 3000 (Common Wire Nails: 50mm (2°) 30 | Ko | 2500 75men (3°) 25 | Ko | 2500 ‘100mm (4°) 20 | Kilo | 2500 125mm (5°) 15 | Kio | 2500 Finishing Nails: 3tmm (1-114) 10 | Kio | 2500 250.00 50mm (2') 9 | Kio | 25.00 225.00 63mm (2-1/2') 8 | Kio | 2500 200.00 Concrete Nails, 75mm (3°) 3 | Kio | 3500 1105.00 Form Lumber, Rough Tanquile: '50 Pes, - SOmm.x 75mm x 3,60mm (23% 12’) 300 | eon | 1250 3,750.00 90 Pes. = 50mm_x $0mm x 3.60mm (2%2%12) 360 | Bat | 1250 4,500.00, Waterproof Plywood, 6mm x 1.20mx 2.40m 15 | Sheet | 200.00 3,000.00 2. FLOOR FRAMING ....... . se sense P. Floor Beams, Guijo-Rough 2 Pes. - SOmmx 200mm x 3.00m (2"x8°% 10) 26 | Ben 3 Pes, - 50mmx 250mm x 4.20m (2x10%14") 7o | Ban 5 Pes, - 50mm x 250mm x 3,60m (210 12) 100 | Bat. Floor Joists and Bridgings, Apitong Rough: 30 Pes, - 50mm x 150mm x 3.00m (2%6°x10) 300 | Bar 40 Pes, - 50mm x 150mm x 4.20m (26X14) 560 | Bd Prepared by: Approved: "ARCHITECTIENGINEER ‘OWNER DATE DATE ASS ESTIMATING BILL OF MATERIALS - Tagayun Project Owners 71 Location BILL OF MATERIALS : Unit Total Description of Material Quantity | unit | gat a IMC Botts w/ Washers, 16mm fa x 200mm (51 da x 8") Common Wire Naiis. 100mm (4°) Common Wire Nais, 125mm (5°) SOLIGNUM Wood Preservative 3, ROOF FRAMINGS P. Roof Beams. Guijo-Rough: 6 Pes. - SOm x 200mm x 3.00m (2x 8x 10) 80 | Bon 8 Pes. - SOmm x 250mm x 4.20m (2"x8"x 14} 10 | Bon ‘Truss Top Chord, Apitong Rough: {8 Pes. - SOmm x 200mm x 5.40m (2'x 8"x 18} 12 | ban 2 Pes. - 80mm x 200mm x 480m (2'x 8x 16) 42 | Bat Bottom Chords, Apitong Rough: 8 Pes, -SOmm x 125mm x 420m (2'x 5'x 14) 93 | Ban Pes, - SOmmx 125mm x 480m (2"x 5" 16) 2 | Bat Truss Collars, Aritong Rough: 40 Pes, - 50mm x 125mm x2.40m (2"x 5" 8) 66 | Ban Diagonal and Vertical Truss Members Guijo-Rough 10 Pes. - 0mm x 100mm x 3.6m (Z"x 4°x 12) 2 | Ban. Rafters, Antong Rough 114 Pes, - 50mm x 150mm x 2.40m (2"x6"x 8) | Bon, 7 Pes, - 50mm x 150mm x 360m (2'x6"x 12) ea | Ban Cleats. Aptong/Tanqule, Rough: 14 Pes, - 50mm x 50mm x 3,00m (2'x2"x 101 46 | Ban Putin, Apitong Rough £80 Pos, 50mm x 7Smmx 360m (2'x3'x 12) as | eat Fascia Boards, KD Tangule, $25: 410 Pes, - 25mm x 300mm x 4 80m (1"x 12"x 16) te | eat [MC Bolts with washers, 16mm la x 250mm 5/8" cia x 10) 25 | Piece Do, ‘amm ax 175mm 1/2" dax 7”) 50 | Piece ‘Common Wre Nails 75mm (3") 5 | Kio Do 100mm(4’) 7 | ko Do 125mm(s) 10 | Kilo Wood Preservative, SOUGNUM 12. | titer Prepared by Approved “ARCHITECTIENGINEER OWNER DATE DATE AS6 Project Owners Location Page 3 BILL OF MATERIALS : Unit Total Description of Material Quantity | unit | One ee 4, ROOFING MATERIALS : YACINTO colorsheet pre-coated galvanized sheets: (0.4mm x 0.81mm x 244m 34 | Sheet 0.4mm x 0.8mm x 3.05m 48 | Sheet 04mm x 0.8mm x 3.665 37 | Sheet Plain Gl ridge roll and hip rolls, Ga. 0.4mm 450mm x 2.44 (18" x 8) 35 | Piece Plain Gl fascia flashing, Ga, 25, 450mm x 2.44m (18° x 8) 11 | Piece Plain Gi wall lashing and straps, Ga. 0.4mm 6 | Sheet 810mm x 2.44m (32 x 8) 7 | Kio Sef-diling rooting screws 12mm x 6.00 meters 10 | Kilo VULCASEAL sealant 3 | +Can PVC Pipes downspout, Schedule 40, MOLDEX Gray 75mrm dia x 3.00m (3" dia x 10) 20 | Piece PVC Elbows, 75mm dia (3° dia), Sched. 40 32 | Piece PVC Tees, 75mm dia (3" dia), Sched. 40 4 | Piece PVC Solvent Cement 20 | oe 5. PLUMBING PIPES AND FITTINGS Sanitary pipes and fitings. MOLDEX SANIMOLD Pipes - 100mm dia x.3.00m (4° dia x 10°) 5 | Piece Pipes - 75mm dia x 3.00m(3" dia x 10}) 4 | Piece Pipes - SOrmm dia x 3,00m(2" dia x 10} 7 | Piece Sanitary Tee - 100mm dia (4" aia) 5 | Piece Sanitary Tee- 75mm dia (3" aia) 3. | Piece Sanitary Tee- SOmm dia (2" dia) 4 | Piece Elbow, 90 deg - 100rrm dia (4° dia) 6 | Piece Elbow, 90 deg- 76mm dia (3° dia) 8 | Piece Elbow, 90 deg- 50mm dia (2° dia) 2 | Piece Sanitary Wye - 100mm dia (4” da) 3. | Piece Reducer Wye- 50mm cia x 100mm dia (2" dia x 4" dia) 2 | Piece Prepared by. Approved: "ARCHITECTIENGINEER ‘OWNER, DATE DATE AS? ESTIMATING BILL OF MATERIALS - Tagayun Project Page 4 Owmerts = Location BILL OF MATERIALS 5 Unit Total Description of Material Quantity | unt | ont et Reducer Viye -7Smm fa x 100mm ca (3 bax ba) 4 | Plece Reducer Tee - 50mm da x 100mm da (2' ca x 4a) 5 | Piece Reducer Tee - 75mm da x 100mm da (3" ax 4" da) 3 | rece Reducer Coupling - 75mm cfax 100mm cia (3 dax4' da) 2 | Pee ‘Coupting- 100mm cia (a" ea) 5 | Pee Coupling - 75mm da (3" da) 3 | Plece Coupling - 50mm da (2" da) 4 | Piece Floor Drain Trap - 50mm cba (Z" cia) 5 | Piece Clean-out wptug- 100mm da (4° da) 2 | Pece Glean-out wiplug 50mm da (2" da) 2 | Pece Concrete Drainage pipes: ‘00mm cha x 1,00 meter 8 | Piece 450mm ca x 1.00 meter 12 | Piece ‘Water meter, GREAT VOLUME brand 1 | Plece Gate valve, Bronze frish, GREAT VOLUME brand 1 | Set Faucet, Bronze frish, GREAT VOLUME brand 5 | Prece Hose bibbs, chrome frish, GREAT VOLUME brand 2 | Pece Gi pipes andifiting heduie 40, Pipe - 12mm cia x 6.00m (1/2" ba x 20) Pipe - 19mm cla x 6:00m (3/4" da x 20) ‘bow, 80 deg 198mm da (3/4 ca) bow, 90 deg - 12mm da (1/2" da) ‘Street Bl- 12mm da (172" da) Tapped Tee - 19mm cha (3/4" da) Tapped Tee - 12mm da (1Z" da) Reducer Tee - 18mm da x Tamm da (3/4 da x 12" da) Reducer Ell- 19mm da x 12mm da (3/4" bax 172" da) Reducer Bll - 12mm da x 10mm ca (1/2' a x 38" da) ‘Nipple - 12mm fa x 150mm (1/2" ha x 6°) Courling - 19mm a (34 ca) Coupling - 12mm da (172' a) Union - 19mm da (3/4" da) ONNSvOURHaNNAROD 2 8 Union - 12mm da (1/2" da) Piece ‘Teflon Tape, Big Rall Prepared by: Approved: "ARCHITECTIENGINEER OWNER DATE DATE ASB Project Pages Owners Location BILL OF MATERIALS 7 Unit Total Description of Material Quantity | Unit | cos Pair 6 PLUMBING FIXTURES AND ACCESSORIES P. ‘Water closet, SANIWARES Ventura PF 2400 2 Set Lavatory, SANIWARES Ventura PF 1002 2 Set Kitchen sink, NORTHERN HILL Lavelle 4221 RA 1 Set Laundry tray, NORTHERN HILL Lawndale -244RA, 1 Set ‘Soap holder, C.W. Tan Mfg. Model ACOO4 3 Set Toilet paper holder, C.W. Tan Mig, Model ACOO1 2 Set Towel holder, SANIWARES PF 3800 3 Set ‘Shower head, valve and faucet 2 Set Floor Drain, Chrome-plated, 100mm x 100mm 5 | Piece 7. CEILINGS, PARTITIONS, FLOORS IP. AND OTHER INTERIOR WORKS: Wood flooring, KD Tanguile, T&S 165 Pes, 25mm.x 100mm x 4.80m (1"x 4" x 161) 347 | Batt Baseboards, KD Tanquile, S45 25 Pes, 25mm x 100mm x 3,60m (1"x 4" x 12') 100 | Bde Celling joists, hangers and studs, Tanquile, Rough 200 Pes. 50mm x 60mm x 4.80m (2"x 2"x 16°) 1067 | Bd Ceiling and partition boards: ‘mmx 1.20mx 2.40m Class A plywood 80 | Sheet Sem x 1.20m x 2.40m plywood 10 | Sheet 419mm x 1.20m x 2.40m Plyboard for Cabinets 15 | Sheet Shelves for cabinets and closets, KD Tanquile, S4S, 12 Pes.25mmx 300m x 3:60m (1"x 12" x 12) 144 | Bat ‘Quarter, “C" mouldings, KD Tanquile, 360m (12) 95 | Piece Marble floor tiles, 300mm x 600mm (12" x 24") 120 | Piece KENT Vinyl floor tiles, 300mm x 300mm (12"x 12") 750 | Piece RUGBY glue for vinyl tiles 4 | aLcan Toilet-Bathroom tiles and mouldings, MARIWASA. Unglazed floor tiles, 108 x 108mm 750 | Piece Glazed wall tiles, 108 x 108mm (4-1/4" x 4-1/4") 2500 | Peice Tile mouldings (Assorted) 150 | Peice PRIME white cement 3 | Bag Prepared by: Approved: ARCHITECTIENGINEER. ‘OWNER DATE DATE Aso ESTIMATING BILL OF MATERIALS - Tagayun Project Page 6 Owners Location BILL OF MATERIALS 4 : Unit Total Description of Material Quantity | unit | ont paar 8. ELECTRICAL MATERIALS P. Entrance Cap - 25mm da (1" da) 1 | Piece Rigid steel conduit - 25mm cia x 3.00%, ‘Schedule 40 4 | Piece Conduit lamp for 25mm RSC 5 | Piece ‘Metal locknut with bushing - 25mm dia 3 | Pair ‘Automatic circuit breaker, 100A main switch, with 6 branch circuits, EVER brand 1 | set RSC elbow - 90° long bend, 25mm dia 5 | Piece RSC coupling - 25mm da 3. | Piece NELTEX Power Guard electric wire protection, Orange: UPVC Pipe, 20mm céax 300m, Schedule 40 90 | Piece UPVC Coupling - 20mm cia 70 | Piece UPVC Adaptor wilocknut and bushing, 20mm da 40 | Piece UPVC Range pipe, 25mm dia x 3.00m 2 | Piece UPVC Adaptor wflocknut and bushing, 025mm dia 4 | Par UPVC Utility boxes, 38mm x 100mm x 54mm 55 | Piece ‘UPVC Junction boxes, 100mm x 100mm x 54mm 40 | Piece ‘Solvent cement 100 | cc Electric Wre, PHELPS-DODGE, THW. Electric wire, (3.5mm) 2 Box We for range, (5.5mm?) 5 | Meter Wr for range, (8 mm?) S| Meter Wire for service entrance, (22mm?) 15 | Meter ‘We for service entrance, (14mm?) 30 | Meter Porcelain lamp receptacle - 10mm da 45 | Piece ‘Whing Devices, EAGLE brand, Pate assembly for single-gang switch 12 | set Plate assembly for two-gang switch 8 | set Piate assembly for three-gang switch 2 | se Wal switch module, 5A, 250V, AC 30 | Piece Three-way switch module, 54, 250V, AC 8 | Piece Duplex convenience outlets 10 | Piece Range outlet with cover pate, prongs 1 | set Fricton/Ptastic tape, Big size 12 | Rol Prepared by Approved: ARCHITECTENGINEER OWNER DATE DATE A60 Ast Project Owners Page 7 BILL OF MATERIALS 5 a unit Total Description of Material Quantity | Unit | Coup et 9 DOORS, WINDOWS AND ACCESSIRIESS P. (0-1) ENTRANCE DOOR Tene x 200mm (3" x YAKAL door head and jambs 1 | Piece § <4mnm (1-3/4) thick S NARRA panel door 1 | Piece WEISER Entrance lock sat, colonial design 1 | set 9-172" x 4" BF ball bearing template hinges 3. | Piece {0-2} SEAVICE DOORS ene x 150mm (3" x6") YAKAL door head and jambs 2 | Piece g ‘4enm (1-3/4) thick “ Kilndried TANGUILE panel door 2 | Piece WEISER Service entrance oor lookset 2 | se BF ball bear template hinges 6 | Piece Prepared by: Approved: "ARCHITECTENGINEER OWNER DATE DATE ESTIMATING BILL OF MATERIALS - Tagayun Page 8 ae Brie mer BILL OF MATERIALS a re Description of Material Quantity Unit Cost Cost saree a tee : || FASEB @ 8| S 7 i (345) (SqFt) Tal dallelceactint an oe Alumiqum jalousie hardware, single control 6 Pair ‘Smm x 100mm x 50m Smoked glass slats 6 Piece poet le ARCHITECT/ENGINEER ‘OWNER DATE DATE A62 Project Page 9 Owneris Location BILL OF MATERIALS : a) unit Total Description of Material Quantity | Unit 10. PAINTING MATERIALS P (DUTCH BOY or BOYSEN Products) Flatwall Ename! Paint, White 2 | 16LCan Quick Drying Enamel, Vite 2 | 16LCan Exterior Wood Primer and Sealer 1 | 16.Can Interior Wood Primer and Sealer 1 | 46. can Oi Tinting Colors: Green’ 2 | 1Lcan Yellow 2 | 1Lcan Brown 2 | ALcan Black 2 | tLcan Primer Thinner 2 | can Acrylic Serr-gloss Latex Paint 2 | t6Lcan Concrete Neutralizer 2 | t6LCan ‘Actylic Concrete Primer Sealer 3. | can Latex Putty 4 | 46.can Acrylic Tinting Colors : Brown 2 | atcan Yellow 1 | aLcan Clear Gloss Lacquer 2 | aLcan Dead Fiat Lacquer 2 | acan Lacquer Primer Surfacer 1 | aUcan Wood Filler Paste 2 | Alcan Lacquer Thinner 3 | Alcan Red Lead Primer 3 | acan Portland Cement Roof Paint 3 | aLcen Sandpapers (Assorted) 2 Doz. Cleaning Rags 2 ‘elo 41, MISCELLANEOUS MATERIALS ( Lump Sum Estimates) P (Cabinet door hardware, wrought iron giles, screens, star materials, etc.) Prepared by Approved: ARCHITECTIENGINEER OWNER DATE DATE A63 ESTIMATING BILL OF MATERIALS - Tagayun Page 10 ‘SUMMARY COST ESTIMATES FOR MATERIALS, LABOR AND OTHER CONSTRUCTION EXPENSES: ‘A ESTIMATED COST OF MATERIALS (Fromthe Bill of Materials) .... P 1, FOUNDATION, CONCRETE COLUMNS, BEAMS AND CONCRETE HOLLOW BLOCKS WALLS P 121,680.00 FLOOR FRAMING Pp ROOF FRAMINGS. Pp ROOFING MATERIALS P PLUMBING PIPES AND FITTINGS Pp PLUMBING FIXTURES AND ACCESSORIES P CEILINGS, PARTITIONS, FLOORS AND OTHER INTERIOR WORKS. ELECTRICAL MATERIALS DOORS, WINDOWS AND ACCESSORIES PAINTING MATERIALS (DUTCH BOY or BOYSEN Products) Pp 11, MISCELLANEOUS MATERIALS P NOwaen vv B. ESTIMATED COST OF LABOR (Including Supervision Fees) C. ESTIMATED EXPENSES FOR CONTINGENCIES Pp ESTIMATED TOTAL DIRECT COST Pp The above items comprise the estimated expenses for materials and labor applied directly in the construction of the building. If the work would be undertaken by a contractor, the indirect costs shown below should also be taken into account in projecting the total funding required for the completion of the project. D. CONTRACTOR'S PROFIT (Including Overhead) Pp E. CONTRACTOR'S TAX P ESTIMATED TOTAL DIRECT COST P ESTIMATED TOTAL DIRECT COST Prepared by. Approved: "ARCHITECTIENGINEER OWNER DATE DATE A64

You might also like