Bk91-1310-Cpf-214-Pip-Lay-0009 - 0 - Piping Layout For Light Oil Treatment Unit (09) - C1
Bk91-1310-Cpf-214-Pip-Lay-0009 - 0 - Piping Layout For Light Oil Treatment Unit (09) - C1
from PDMS 3D Model which all piping routes, pipe support, in-line items,
elevation, dimension, etc. are matched/aligned with latest 3D model.
If any changed on 3D model design or mismatched with Iso dwg, Structure
dwg, Instrument Location Plan, Hook-up drawing, etc., EPC Contractor is fully
should be:0007,please confirm. responsibility to modify and update this GA drawing in accordingly.