***Review Note: (TYP.

for ALL GA drawing)


COMPANY could not perform to review this GA drawing in detail line by line,
so EPC Contractor is to ensure this Piping GA drawing has been extracted
DATE

from PDMS 3D Model which all piping routes, pipe support, in-line items,
elevation, dimension, etc. are matched/aligned with latest 3D model.
If any changed on 3D model design or mismatched with Iso dwg, Structure
dwg, Instrument Location Plan, Hook-up drawing, etc., EPC Contractor is fully
should be:0007,please confirm. responsibility to modify and update this GA drawing in accordingly.
(previous comments)
BY

FOR CONT.REFER DWG.BK91-1310-CPF-214-PIP-LAY-1007


DISCIPLINE

FOR CONT.REFER DWG.BK91-1310-CPF-214-PIP-LAY-1002


DATE

DRAWING LIMIT
DOWN

DOWN
BY

CPF-214-E-09
MEDIUM-WATER HEAT EXCHANGER

N2

N5

N1
DISCIPLINE

FOR CONT.REFER DWG.BK91-1310-CPF-214-PIP-LAY-1010

CLIENT:

CONTRACTOR:

PHASE:

DRAWING NO. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
PROJECT TITLE:

DRAWING TITLE:

STAGE DRAWING NO. SHT. REV.