Professional Documents
Culture Documents
Bk91-1310-Cpf-214-Pip-Lay-0011 - 0 - Piping Layout For Light Oil Treatment Unit (11) - C1
Bk91-1310-Cpf-214-Pip-Lay-0011 - 0 - Piping Layout For Light Oil Treatment Unit (11) - C1
Bk91-1310-Cpf-214-Pip-Lay-0011 - 0 - Piping Layout For Light Oil Treatment Unit (11) - C1
from PDMS 3D Model which all piping routes, pipe support, in-line items,
elevation, dimension, etc. are matched/aligned with latest 3D model.
If any changed on 3D model design or mismatched with Iso dwg, Structure
should be:0010,please confirm. dwg, Instrument Location Plan, Hook-up drawing, etc., EPC Contractor is fully
(previous comments) responsibility to modify and update this GA drawing in accordingly.
BY
DRAWING LIMIT
CPF-214-PM-04B
CENTRIFUGAL PUMP
DOWN
DOWN
BY
N2
N5
N1
DISCIPLINE
CLIENT:
CONTRACTOR:
PHASE:
DRAWING NO. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
PROJECT TITLE:
DRAWING TITLE: