***Review Note: (TYP.

for ALL GA drawing)


COMPANY could not perform to review this GA drawing in detail line by line,
so EPC Contractor is to ensure this Piping GA drawing has been extracted
DATE

from PDMS 3D Model which all piping routes, pipe support, in-line items,
elevation, dimension, etc. are matched/aligned with latest 3D model.
If any changed on 3D model design or mismatched with Iso dwg, Structure
should be:0009,please confirm. dwg, Instrument Location Plan, Hook-up drawing, etc., EPC Contractor is fully
(previous comments) responsibility to modify and update this GA drawing in accordingly.
BY

FOR CONT.REFER DWG.BK91-1310-CPF-214-PIP-LAY-1009


DISCIPLINE

FOR CONT.REFER DWG.BK91-1310-CPF-136-PIP-LAY-1013


DATE

DRAWING LIMIT
DOWN

DOWN
BY

CPF-214-PM-04A
DEHYDRATION PUMP

N2

N5

N1
DISCIPLINE

FOR CONT.REFER DWG.BK91-1310-CPF-214-PIP-LAY-1011

CLIENT:

CONTRACTOR:

PHASE:

DRAWING NO. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
PROJECT TITLE:

DRAWING TITLE:

STAGE DRAWING NO. SHT. REV.