Doc. No.
Index for Light Oil
Revision 3
Treatment Unit Date of
04-21-2023
Issue
Page 1 of 15
3 RE-ISSUED FOR CONSTRUCTION 04-21-2023 FAN B.B. SHAN C.Y. LI F.L. CAI F.F.
2 RE-ISSUED FOR CONSTRUCTION 04-14-2023 FAN B.B. SHAN C.Y. LI F.L. CAI F.F.
1 RE-ISSUED FOR CONSTRUCTION 04-07-2023 FAN B.B. SHAN C.Y. LI F.L. CAI F.F.
0 ISSUED FOR CONSTRUCTION 03-31-2023 FAN B.B. SHAN C.Y. LI F.L. CAI F.F.
NOTES:
1) Pipe Quantity is in meters and other quantities in Nos.
2) All dimensions, elevations and co-ordinates indicated in the isometric drawings are in mm unless otherwise specified.
3) All dimenions and elevations refer to centre line of pipe unless otherwise specified.
4) In case of any discrepancy in Process Data / Line Data in the isometric drawing with respect to the line list, Approved line list shall be governed.
5) Location of Hydrostatic vents & drains indicated on isometrics are for reference only. Final locations shall be decided by construction contractor.
The same shall be recorded on red marked up drawings and updated in AS-Built drawings.
6) “HOLDS” wherever applicable are indicated on isometrics.
7) Height of the shoe indicated under support tags on isometrics of sloping line is as per working point BOP elevation and TOS (Top of Steel)
elevation at support point.Shoe profile to be adjusted according to the slope of the line.
8) Fabrication/Erection of Pipe work, Painting, Insulation and Pipe supports shall confirm to relevant Project specifications / Standards.
9) Construction contractor shall verify all dimensions and elevations prior to fabrication and installation / demolition of piping.
10) All Tie-Ins (Vendor + Existing Area) shall be verified before fabrication. Last Weld joints shall be done after TIE IN verification.
11) Full Couplings & Union for CS-Galvanised Piping shall be adjusted at site suitably.
12) Well connected lines untill the first support to be fabricated after WELL Nozzle Orientation & Elevation confirmation.
13) Field & Shop weld requirements for pipe supports shall be followed inline with Pipe Support Specification and Drawings Doc.
BK91-1310-CPF-999-PIP-DPS-0001.
14) Vertical height adjustments for the pipe shoes, T-Supports, L-Supports shall be done at site based on the installed pipe BOP requirements.
15) CS Pipe sleeve protection shall be provided at GRE pipe crossings with roads, concrete trenches and pits.
16) Supports on water hydrant and foam hydrant please reference BK91-1310-CPF-999-FRF-DWG-0001 Installation Drawing
for Fire Fighting Equipment.
17) Piping routing may changed during the revising of the stress analysis report.
18) Gaskets/Bolts length for the instrumentations gauges/transmitters with flush ring will be updated after have the vendor information.
5 AOC-CPF-214-123(214) 4"-AOC-CPF-214-123-1A3(214) 1
6 AOC-CPF-214-214(214) 4"-AOC-CPF-214-214-1A3(214) 1
7 AOC-CPF-214-326(214) 4"-AOC-CPF-214-326-1D3(214) 1
8 AOC-CPF-214-430(214) 2"-AOC-CPF-214-430-1A3(214) 1
9 AOC-CPF-214-431(214) 2"-AOC-CPF-214-431-1A3(214) 1
10 AOC-CPF-214-624(214) 2"-AOC-CPF-214-624-1A3(214) 1
11 AOC-CPF-214-626(214) 2"-AOC-CPF-214-626-1A3(214) 1
12 AOC-CPF-214-923(214) 2"-AOC-CPF-214-923-1D3(214) 1
13 AOC-CPF-214-924(214) 2"-AOC-CPF-214-924-3T1-P80(214) 1
14 AOC-CPF-214-924(214) 2"-AOC-CPF-214-924-3T1-P80(214) 2
15 AOC-CPF-214-924(214) 2"-AOC-CPF-214-924-3T1-P80(214) 3
16 AOC-CPF-214-925(214) 2"-AOC-CPF-214-925-1A3(214) 1
17 AOC-CPF-214-926(214) 4"-AOC-CPF-214-926-1A3(214) 1
64 DE-CPF-182-107(214) 3/4"-DE-CPF-182-107-3C0(214) 1
65 DE-CPF-182-107(214) 3/4"-DE-CPF-182-107-3C0(214) 2
66 DE-CPF-212-428(214) 3/4"-DE-CPF-212-428-3C0(214) 1
67 DE-CPF-212-428(214) 3/4"-DE-CPF-212-428-3C0(214) 2
69 DE-CPF-214-201(214) 1/2"-DE-CPF-214-201-3D3(214) 1
81 GW-CPF-214-105(214) 4"-GW-CPF-214-105-1N0S-P30(214) 1
82 GW-CPF-214-136(136A) 4"-GW-CPF-214-136-1N0S-H40(136A) 1
83 GW-CPF-214-136(214) 4"-GW-CPF-214-136-1N0S-H40(214) 1
84 GW-CPF-214-136(214) 4"-GW-CPF-214-136-1N0S-H40(214) 2