Quality Management Plan
Quality Management Plan
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Name Role
[John Doe] Project Manager Quality mentoring & coaching
[Jane Doe] Team Lead Quality audits
<Name> <Role> <Responsibility>
Tool Description
Activity Inspected
Method Acceptance Criteria Record
By
Prestart Implemented
Version Revision Hard copies ofApproval
Approved documentation Reason Doc
# By Visual Check
Date F-12
documentation in project binder Date
By Controller
1.0 <Author name> <mm/dd/yy> <name> <mm/dd/yy> <reason>
Checklist items 1-15 Site
Establish Site Visual Check F-34
completed Manager
Dimensional Site
Excavation As per site drawing drawing
check Manager
Delivery
Foundation pour Measure Slump test - 50mm +/- 10mm Engineer
record
Re-bar clean
Acceptance
Activity Inspected By Method Record
Criteria
...
Who
Description Sign Pass/Fail Details of Rectification
?
...
Final Inspection
Description Criteria Measurement Pass/Fail
...
zero defective
Display
pixels
Test or
Inspection Stage / Code /
Activity/Description performed Frequency Spec Inspection / Verification
Main
Sub Con Con Employer
Excavation
1. Preparation E W R
Test or
Inspection Stage / Code /
Activity/Description performed Frequency Spec Acceptance Criteria
Material Inspections
(Delivery on site )
1. Materials
As per approved
Material Submittals
1. Accessories Code 1/2
Reported Nonconformances and incomplete items: Internal fans are mounted with vibration isolators
Drive belts properly tensioned
Ventilators
maintenance
installed with clearance for inspection and
Field Operations
1. Material Section
Activity Description
Method Reference
Inspection/Test Frequency
Accpetance Criteria
Activity Description
Method Reference
Inspection/Test Frequency
Accpetance Criteria
3. Testing Summary
Activity Description
Method Reference
Inspection/Test Frequency
Accpetance Criteria
Contractor Sign Off
4. Installation Summary
Activity Description
Method Reference
Inspection/Test Frequency
Accpetance Criteria
5. Design Tolerances
Activity Description
Method Reference
Inspection/Test Frequency
Accpetance Criteria
6. Traffic Considerations
Activity Description
Method Reference
Inspection/Test Frequency
Accpetance Criteria
7. Survey Considerations
Activity Description
Method Reference
Inspection/Test Frequency
Accpetance Criteria
8. Inspection Requirements
Activity Description
Method Reference
Inspection/Test Frequency
Accpetance Criteria
Completion
■ ves ■ NIA
■ ves ■ NIA
■ ves ■ NIA
■ ves ■ NIA