1390 11678
0.270
Total Time
570
2280
1040
79.5
79.5
129
7200
300
Distance (m) Time (s) Frequency
1. Solution & Slurry Preparation 10 360 1
2. Guar Gum Loading 128 450 1
3. Glycerin Loading 270 260 1
4. Mixer Chute Cleaning 23 330 1
5. Sample Collection 210 675 12
6. Stem Moisture Monitoring 20 150 1
7. Fibre Condition Monitoring 40 85 4
8. Lecithin Preparation and Transfer 40 350 5
9. Waste OV Tank Discharge and Cleaning 30 700 1
10 Misc. - Monitoring the Process 1 7200 1
772 19640
0.455
39600
0.91666667
43200
Total Time
360
450
260
330
8100
150
340
1750
700
7200
Distance (m) Time (s) Frequency
1. Doctor Knife Replacement 99 2005 5
2. Hot Plate Sampling Inspection 101 560 3
3. Manual Strapping 14 55 1
4. Under Coater Waste Clearing 65 75 1
5. Guar Ball Clearing 32 115 1
6. Shredder Area Cleaning 23 105 1
7. Transfer of Waste/ Add Back 21 70 2
8. End of Shift Cleaning 50 360 1
9.
10. Misc. - Monitoring the Process 1 7200 1
406 19755
Estimated Man-Hours Required 0.499
Total working hours (sec.) 12 43200
Total Rest Hours (sec.) 1 3600
Actual Working Hours 11 39600
Efficiency of Manpower Rate 91.67%
Total Time
10025
1680
55
75
115
105
140
360
0
7200
Distance (m) Time (s) Frequency
1. Carton Box Preparation 1 x 1 box 26 80 10
2. Carton Box Preparation 2 x 4 boxes 44 140 1
3. Packing Process 23 190 1
4. Finished Goods Storage 402 360 1
5. 1
6. 1
7. 2
8. 1
9.
10. Misc. - Monitoring the Process 1 7200 1
496 8690
Estimated Man-Hours Required 0.219
Total working hours (sec.) 12 43200
Total Rest Hours (sec.) 1 3600
Actual Working Hours 11 39600
Efficiency of Manpower Rate 91.67%
Total Time
800
140
190
360
0
0
0
0
0
7200
Area 1A Area 1B
Preparation (sec) 28800 3600
Inspection/ Checking (hourly) 10080
Collecting Sample 180
Routine Cleaning 1
Routine Cleaning 2
Routine Cleaning 3
Takt
Cycle Time
Change Over Time
Uptime %
Scrap/ Waste
Shifts 3
Manpower/shift (PMM) - 2
Manpower/shift (Contract) - 1
Total Manpower/ shift - 3
Total Manpower - 12
Storage Capacity 1
Storage Capacity 2
Storage Capacity 3
Storage Capacity 4
2 5 2
1 1 1
3 6 3
12 24 12
2000 300 kg/hr 6500
60000 1300 kg/hr
1000 50 kg/hr
200 40 kg/hr