PowerCube 500 V100R001C02

Installation Environment Checklist


Project Contact Person
Contract No. Telephone Number

Device Type and First Check in an Early Period Second Check Before the Project Remarks
Offic Project
No. Installation Preparation Completed Scheduled Completed Scheduled
e Type
Environment on Completion Date on Completion Date

Device Type: □New 1 Civil work


site
□Street lamp 2 Site ground connect
□Video Survelliance 3 There is no barrier shielding
□Upgrad within the range required.
□WLAN ed site
Installation 4 Enough space for the Such as
environment: installation equipment. crane

Ambient 5 The power supply is prepared.


temperature range
(°C):_________ 6 Installation tools and such as a
equipment are prepared. crane
Ambient humidity
range (%):______ 7 The surrounding environment
does not exist factors that
affect the installation safety
Note:
The first check is conducted by site survey personnel during site survey, and the second check is conducted by the project supervisor and the result is agreed between the
supervisor and the customer onsite or by fax before site deployment.
First check Huawei representative Date Second check Huawei representative Date
Customer representative Date Customer representative Date

Page 1 of 1 STS/EM03-09-
0-E27