SITE INSPECTION AND TEST RECORD

Contract No: PIC P - 7703

Name of Substation: 10J SUBSTATION


Description: BUSBAR PROTECTION RELAY 7SS522
Panel: Location: Page 1 of 8

1. GENERAL INFORMATION

Panel
Equipment Tag
Frequency 60Hz
C.U Type
CT Ratio
Rated Current
Rated Voltage
Aux. Voltage 125V DC
B.U Type

2. MEASUREMENTS:

* Bays at Z1B&Z2B

Meas. Meas. (CZ) Reading by Digsi (%)


Phase

BAY I inj.
@ B.U @ C.U (%) Check zone Bus zone Bus Zone No.
No. (A) Ipri
(%) Idiff. IStab. Idiff. IStab. Idiff. IStab.
L1 0.5
L2 0.75
L3 1
L1 0.5
L2 0.75
L3 1
L1 0.5
L2 0.75
L3 1
L1 0.5
L2 0.75
L3 1
L1 0.5
L2 0.75
L3 1

* Bus Section AD

TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD

Contract No: PIC P - 7703

Name of Substation: 10J SUBSTATION


Description: BUSBAR PROTECTION RELAY 7SS522
Panel: Location: Page 2 of 8

Meas. (CZ) Reading by Digsi (%)


Meas.
Phase

BAY I inj. @ C.U (%)


@ B.U Check zone Bus zone Bus Zone No.
No. (A) Ipri
(%)
Idiff. IStab. Idiff. IStab. Idiff. IStab.
L1 0.5 ---- ---- ---- ----
L2 0.75 ---- ---- ---- ----
L3 1 ---- ---- ---- ----
L1 0.5 ---- ---- ---- ----
L2 0.75 ---- ---- ---- ----
L3 1 ---- ---- ---- ----

* Injection was done from terminal block of the bay unit


* Bus zone (selective zone) depending on which isolator closed.

3. BUS BAR PROTECTION DIFF. CURRENT ALARM TEST:

Settings: Address 6306: Idiff supervision : ON


Address 6307: Idiff superv. Time delay : …. sec
Address 6308: Idiff superv. Limit value – BZ : …... A
Address 6309: Idiff superv. limit value – CZ : …... A
* Idiff. sup.CZ. / BZ alarm appears only at C. U (Config. Led on address CZ. / 10410, BZ/ 10415)
* Stop contact (M15, 10410) for CZ. /CU and (M16, 10415) for BZ. /CU

Check Zone Bus Zone


Relay
Bay Phase Remarks
Time LED
P/U (A) D/O (A) P/U(A) D/O(A) Time (Sec)
(Sec)
L1-N

Z 1B L2-N

L3-N

L1-N

Z 2B L2-N

L3-N
4. BUS BAR DIFF. PROTECTION CURRENT:

TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD

Contract No: PIC P - 7703

Name of Substation: 10J SUBSTATION


Description: BUSBAR PROTECTION RELAY 7SS522
Panel: Location: Page 3 of 8

*4-1 Pickup Test:


(Check zone or Bus zone), the function which will be tested the other should be
Set at low value.

Settings: Address 6306: Idiff superv : OFF


Address 6101: Stabilizing factor (BZ) : …...
Address 6102: Idiff threshold (BZ) : …... A
Address 6103: Stabilizing factor (CZ) : …...
Address 6104: Idiff threshold (CZ) : …...A

* Bays at Z 1B & Z 2B

Bus Zone
Check Zone Relay
BAY No. Phase Q1 (Z 1A) Q2 ON (Z 2A) Remarks
Leds
PICK UP (A) PICK UP (A) PICK UP (A)
L1-N
L2-N
L3-N
L1-N
L2-N
L3-N
L1-N
L2-N
L3-N
L1-N
L2-N
L3-N
L1-N
L2-N
L3-N
L1-N
L2-N
L3-N

*4-2 Time Test:

TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD

Contract No: PIC P - 7703

Name of Substation: 10J SUBSTATION


Description: BUSBAR PROTECTION RELAY 7SS522
Panel: Location: Page 4 of 8

* Stop contact. BB Trip 3 pole

Any Bay Phase Z 1B Z 2B Relay Leds Remarks


L1-N * Relay tripping time
Check Zone L2-N at 4 I set= 15msec
L3-N * Relay Calculs. time
L1-N ( ½ cycle ) = 8 m sec
Bus Zone L2-N * Total time= 23 msec.
L3-N

4-Bus bar Protection Diff. Current Slop Test:

* 4-1 BUS ZONE (SELECTIVE ZONE)

Settings, Address 6306: Idiff superv. : OFF


Address 6101: Stabilizing factor (BZ) : ….
Address 6102: Idiff threshold (BZ) : …. A
Address 6103: Stabilizing factor (CZ) : ….
Address 6104: Idiff threshold (CZ) : …. A

* Stop contact. BB Trip 3 pole

K- Factor Injected current Bus Zone K- factor


phase ( slop) ( slop)=Id/Is Remarks
setting I1 I2 Id Is measured

L1

L2

L3

Id= | I1 - I2 | IS = | I1| + | I2 | K= Id/Is

** Verify this connection.


Inject I1∟0 & I2∟180 equals; decrease any one up to trip,
Calculate slop = Id/Is

* 4-2 CHECK ZONE.

Settings, Address 6306: Idiff superv. : OFF


TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD

Contract No: PIC P - 7703

Name of Substation: 10J SUBSTATION


Description: BUSBAR PROTECTION RELAY 7SS522
Panel: Location: Page 5 of 8

Address 6101: Stabilizing factor (BZ) : ….


Address 6102: Idiff threshold (BZ) : …. A
Address 6103: Stabilizing factor (CZ) : ….
Address 6104: Idiff threshold (CZ) : ….. A

* Stop contact. BB Trip L1, L2, L3/ CZ

K- Factor Injected current K- factor


phase ( slop) ( slop)=I2/I1 Remarks
setting I1 I2 measured

L1

L2

L3

** Verify this connection


Inject I1∟0 ≥ Idiff threshold (CZ), Increase I2 up to trip,
Calculate slop = I2/I1

5. BREAKER FAILURE PROTECTION TEST:

Settings, Address 0114: BI mode / superv. : Initiation w/o supervision

TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD

Contract No: PIC P - 7703

Name of Substation: 10J SUBSTATION


Description: BUSBAR PROTECTION RELAY 7SS522
Panel: Location: Page 6 of 8

Address 0115: BF OP. mode (stg.-1) / (stg.-2): Trip repeat unbalance


Address 0118: Current threshold for BF : …. A
Address 0121: Time delay T-BF-3P (stag. -1 ): …. m sec
Address 0125: Time delay Trip rep. (Stag. -2 ): …. m sec
Test procedure: Config. , B/I CBF start, Led CBF trip, B/O-1 CBF trip 3P (stg.-2)
B/O-2 CBF rep. trip 3P (stg.-1)
Increase current up to P/U and decrease up to D/O
For timing Stg – 1 use B/O-1, for timing Stg – 2 use B/O-2

Circuit Breaker Failure


Bay Relay
Phase P/U D/O Remarks
No. Stg – 1 (m sec) Stg – 2 (m sec) Leds
(A) (A)
L1-N
BU… L2-N
L3-N
L1-N
BU… L2-N
L3-N
L1-N
BU… L2-N
L3-N

6. Breaker Failure Protection Special function Test :

1- C.B. Faulty:
Config. (B/I C.B. not ready).if this B/I is activated in the same time with (B/I CBF start)
The trip will issued after time T-BF CB fault (0124 usually set at low value m sec.)

2- Low Current mode:


If this function: ON and C.B closed , only make CBF start without current
The trip will issue after time T-BF low current (0122)

3- End fault protection:


Config. ( B/O End Flt Trip ) , make this function : ON and if the ( B/I C.B open ) is activated with
injected current.The End fault trip will issue immediately to trip the remote End.

Settings,
Address 0116: Low Current mode BF : ON
Address 0122: Time delay T-BF I< : ….. m sec
Address 0124: Time delay T-BF CB fault : …. m sec
TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD

Contract No: PIC P - 7703

Name of Substation: 10J SUBSTATION


Description: BUSBAR PROTECTION RELAY 7SS522
Panel: Location: Page 7 of 8

Address 0129: End fault protection : ON

I<
Bay I inj. C.B faulty End fault Relay
Phase mode Remarks
No. = In ( m sec ) ( m sec ) Leds
( m sec )
L1-N
BU… L2-N 1.0 A
L3-N
L1-N
BU… L2-N 1.0 A
L3-N
L1-N
BU… L2-N 1.0 A
L3-N

** Breaker Failure Protection Slop Test:


Settings, Address 0114: BI mode / supervision : Initiation w/o supervision
Address 0115: BF OP. mode : BZ unbalances
Address 0118: Current threshold for BF : …. A

* Stop contact. CBF Trip 3 pole

K- Factor Injected current Calculate K- factor


Phase ( slop) ( slop)=Id/Is Remarks
setting I1 I2 Id Is measured
L1
L2 …..
L3

Id= | I1 - I2 | IS = | I1| + | I2 | K= Id/Is

** Verify the connection as shown before with Bus zone slop test.
Inject I1∟0 & I2∟180, fixed I1; increase I2 up to trip,
Calculate slop = Id/Is

7. Diff. Current Supervision fun. Checked:

a) Blocking during fault. : ……….


b) Blocking till release. : ………. ( config. >B/I, Reset Id block)

TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature
SITE INSPECTION AND TEST RECORD

Contract No: PIC P - 7703

Name of Substation: 10J SUBSTATION


Description: BUSBAR PROTECTION RELAY 7SS522
Panel: Location: Page 8 of 8

c) Alarm without blocking. : ……….


8. Isolator supervision fun. Checked:
a) Blocking during fault. : ……….
b) Blocking till release. : ………. ( config. >B/I, Reset iso mal BI)
c) Alarm without blocking. : ……….
9. All Leds checked. : ……….
10. All Binary i/p checked. : ……….
11. All Command relays checked. : ……….
12. All Signal relays checked. : ……….
13. All bay units. checked.:
a ) DC Fail ( the relay save the old status , and the bus zone concerned to this bay unit is blocked )……..
b ) Comm. Fail ( the bus zone concerned to this bay unit is blocked )………..
c ) Out Of Service ( measuring of that bay unit is stopped for that BZ but CZ still running )………
14. Communication of Relay with Laptop through Software : ……….
15. Fault Record in Relay with Laptop through Software

15. Test Equipment used:


Serial no. of Test
No. Test equipment used Calibration Due date
equipment
1 FREJA 300

TESTED BY WITNESSED BY
xx/xx/20xx
ALFANAR T&C SIEMENS MARAFIQ RCA
Name Eng. Eng. Eng. Eng.
Signature