Professional Documents
Culture Documents
Resource Management
Resource Management
Resource Management
[Project Implementation Unit - PIU, Estimated Cost for PIU, Resource Loading]
Page: 9
b) Responsibilities: Design and implement database schema, optimize database
performance, perform backups and recovery procedures, and ensure data security and
compliance with regulatory standards.
(BDT)
SN Name of the post Nos. Monthly Monthly Total Total
Salary per Allowance Monthly (Implementation
Person per Person Salary Period – 12 months)
a b c d e = d *80% f = c*(d+e) g=f*12
1. Superintending 1 1,05,000 84,000 1,89,000 22,68,000
Engineer - SE
2. Executive 5 91,000 72,800 8,19,000 98,28,000
Engineer - XEN
3. Sub-Divisional 1 70,000 56,000 1,26,000 15,12,000
Engineer - SDE
4. Assistant 1 52,000 41,600 93,600 11,23,200
Engineer - AE
Total 8 2,13,000 2,54,400 12,27,600 1,47,31,200
Page: 10
6.3 RESOURCE LOADING:
The resource loading graph during the implementation period is shown below:
Page: 11