Professional Documents
Culture Documents
Pavarotti FP - 1
Pavarotti FP - 1
COVER B
STEEL COLUMN
A4
HEAT RESISTANT 100 X 6.25 X 75 LONG SCREW
CAULKING COMPOUND STEEL BARS WELDED PIPE 2-15 X 50L BOLT WITH
TO PIPE DOUBLE NUTS AND
A
MOUNTING PLATE LOCK WASHER
A2
3
PIPE 8 )
NUTWLOCKWASHER
1. ALL WORKS HERE IN INCLUDED SHALL BE EXECUTED ACCORDING DIRECTION OF
ROD DIA.
A4
ROLL VANE OPPOSITE
A4
OFF LOW ARROW TO FLOW ARROW
NUT WITH LOCK WASHER
A2
8
A
DOUBLE NUTS AND ROD DIA.
MOUNTING HOLE
ASSOCIATION (USA) AND LOSS PREVENTION COUNCIL(UK). LOCK WASHER
B2
A4
6.5MM THK. X 50MM
B PIPE
X 50MM
FLO
W
RN TYP.
CONCRETE WALL ER
AT
W
3. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE NOTE:
C WALL PIPE HANGER DETAIL
PIPE SLEEVE SHALL HAVE A MINIMUM FIRE RATING SIMILAR
EXACT LOCATION AND DIMENSIONS OF AL REQUIRED WALL TO PENETRATED WALL.
B WATER FLOW SWITCH MOUNTING ARRANGEMENT
FP-1
AND FLOOR OPENINGS. A PIPE SLEEVE THRU WALLS & BEAMS FP-1
FP-1
A
ROUND BAR HEAD
HANGER
5. LOCATION OF DRAIN PIPES AND OF THE BACK-UP SUPPLY LINES HEXAGONAL NUTS
W WASHERS
MACHINE BOLT
W NUT A- DEFLECTORS OF SPRINKLER SHALL RN TYP.
NOTE:
TRUSS COUPLING REDUCER
25mm DROP NIPPLE
6. LOCATION AND MOUNTING OF FIRE HOSE CABINETS SHALL BE BOTTOM OF SLAB
ROUND BAR
CROSS MAIN AND BRANCH LINE PIPE
SHOULD BE MAXIMIZE TO THE CEILING LEVEL.
PIPESIZE STEELPLATEBAR ROD.DIA. MACHINEBOLTWNUT
7. SIZE OF RISER NIPPLES SHALL CONFORM TO PIPE SCHEDULES F COMBINATION SPRINKLER HEADS DETAIL
FROM EXISTING BRANCH/
FP-1
AS DELINEATED IN NFPA13. CROSS MAIN AND BRANCH LINE PIPE
SHOULD BE MAXIMIZE TO THE CEILING LEVEL. E
FP-1
ADJUSTABLE TYPE CLEVIS HANGER CROSSMAIN / FEEDMAIN
(VERIFY ACTUAL/ BLDG UTY)
PIPESIZE STEELPLATEBAR ROD.DIA.
mm. in. (thick x width) mm.
ELBOW FITTING
SPRINKLER
FIRE-ALARM
MUST ATALL
INTENT ARCHITECTURAL CEILING PLAN
OPEN PRIOR FOR INSTALLATION OF
AND DUCT SUPPORTS. D ADJUSTABLE TYPE FLAT IRON HANGER
WHEN BELL RINGS
CALL
FIRE DEPT. - POLICE
BE TIMES
FIRE PROTECTION EQUIPMENT SHALL BE BY THE FIRE SPRINKLER FLUSHING CONN. REQUEST DIRECTIONS RESTORE PROTECTION QUICKLY
SPRINKLER SUPERVISORY ALARM CONTROL PANEL SHALL BE BY THE H FLUSHING CONNECTION DETAIL
FIRE HOSE FOR USE BY OCCUPANTS DRY STAND PIPE FOR FIRE DEPT.
CONCRETE WALL OR BEAM FP-1
FIRE SPRINKLER CONTRACTOR. FOR BUILDING USE ONLY
WELDED
13.SHOP DRAWINGS SHALL BE PREPARED BY THE CONTRACTOR FOR G PIPE RISER BRACKET DETAIL FILLET WELD ALL AROUND
FP-1 NUT FEEDMAIN(FM)
FIRE PUMP LAYOUT,PIPE HANGER AN DO THER INSTALLATION AS MULTI PURPOSE DRY CHEMICAL
20LBS15LBS. AUTOMATIC WALL
TYPE HALOGENIC AGENT TYPE
PORTABLE FIRE EXTINGUISHER
EXTINGUISHER (ABC) 15lbs. or
HYDROCHLOROFLUOROCARBON
REQUIRED AND INDICATED IN THE SPECIFICATION. CO2 EXTINGUISHER 10lbs. (HCFC)TYPE TRACKBOLT CROSSMAIN(CM)
I FIRE EXTINGUISHER
14.ALL PIPES PASSING THRU WALLS AND FLOORS, PROVIDE PIPE SLEEVES. FP-01
BRANCHLINE(BL)
PIPE SLEEVE SHOULD HAVE PLASTIC WATERPROOF HEAT RESISTANT CONCRETESLABBEAM
HOUSING
PIPE
CAULKING COMPOUND WITH OAKUM MASTIC PACKING. 2-L 50 X 50 X 7 X 0-75 BOLTS & NUTS
GASKET
INSTALLATION OF FLUSHINGCONNECTION
N FLEXIBLE COUPLING
15.PROVIDE PIPE HANGER @ EVERY 2METERS, SWAY BRACE AND EXPN. SHIELD L 50 X 7 X 0-150MM
FP-01
PENDENTSPRINKLERHEAD
OF EVERY FITTING CONNECTION. ORDINARY
SIDEWALL
TYPE SPRINKLER HEAD
EXTENDED COVERAGE
SIDEWALL
TYPE SPRINKLER HEAD
L40 X 5MM
13MM NPT CHROME FINISH 20MM NPT CHROME FINISH PIPE BOLTS&NUTS GASKET
17.ALL PIPES SHOULD BI PIPE SCHEDULE 40. VERIFY LOCATION AND STD. PIPE
10LBS.CARBONDIOXIDE
ENGINEERPRIORFORSITEINSTALLATION. LATERAL CLAMP LONGITUDINAL
PFECO2 PORTABLEFIRE
L TYPE OF SPRINKLER HEAD M TWO-WAY SWAY BRACE
FP-1 FP-01
(EVERYTWOLENGTHOFPIPE) EXTINGUISHER
O FLANGE CONNECTION DETAIL
FP-01
ENGINEER : DEVELOPER / OWNER : REVISION : DESIGN BY: SHEET CONTENTS: SHEET NO.
CAD BY : CGC
FP
PAVAROTTI TEATRO RISTORANTE ITALIANO CHECKED BY : CGC
AS-SHOWN
01 01
Mr. Marco Ascione
OWNER
LOCATION: Sapphire Bloc at Sapphire, Garnet and Onyx Rd, Ortigas Center, Pasig Metro Manila DATE : APR. 2024