Australian Ballast Water Management Requirements

Attachment 1 : Ballast Water Pump Test


Vessel : M/V SM DONGHAE
Lloyds Number : 3 F L R 8 / 9225067
Port of Registry : PANAMA
Date Launched : 23RD JUNE 2001
ID of Ballast Pump(s) tested : NO. 1 BALLAST PUMP
Original Rated Capacity of Pump(s) tested : 1000 m3/hr

Details of Tank(s) used in test : F.P.T. (Fore Peak Tank)


(Fore Peak Tank preferred for single pump tests, forward upper wing tanks preferred for testing combined pumps)

- No. 1 Ballast Pump


a) Maximum Tank Capacity (m3) : 1961.8 m3

b) Initial contents (m3) : 590.1 m3

c) Time start pumping : 0805 LT

d) Time tank overflowed : 0931 LT

e) Hours Pumping (d-c) : 1.433 Hrs (01 H 26 M)

f) Volume pumped (a-b) : 1371.7 m3

g) Pump's delivery rate (f/e) per hour : 957.2 m3/hr

Master's Signature :

Chief Officer's Signature : Date : 28TH APR. 2017

Ship's Stamp :

Note: It is strongly recommended that pumps are tested at least every twelve months.