CRACK WIDTH
4 Section Force 437.1 3.6 13.8
5 Section Force 437.1 3.6 13.8
6 Section Force 437.1 3.6 13.8
7 Section Force 437.1 3.6 13.8
8 Section Force 437.1 3.6 13.8
9 Section Force 437.1 3.6 13.8
10 Section Force 341.0 -10.7 -1.2
11 Section Force 437.1 3.6 13.8
12 Section Force 341.0 -10.7 -1.2
13 Section Force 454.9 81.1 80.0
14 Section Force 203.5 -97.3 -68.8
15 Section Force 364.0 41.9 191.6
SLS COMBINATION
16 Section Force 325.7 -36.6 -175.8
17 Section Force 390.2 99.8 92.1
18 Section Force 299.6 -94.5 -76.3
19 Section Force 390.2 99.8 92.1
20 Section Force 299.6 -94.5 -76.3
21 Section Force 390.2 99.8 92.1
22 Section Force 203.5 -97.3 -68.8
23 Section Force 364.0 41.9 191.6
24 Section Force 325.7 -36.6 -175.8
25 Section Force 655.7 5.4 20.7
26 Section Force 156.0 -141.2 -105.9
27 Section Force 546.1 62.9 287.4
ULS COMBINATION
Oasys Results:
Development Length (Ldc) for 32mm dia bar = 93.3mm which is <600mm. :Hence (OK)
Shear Check
SHEAR DESIGN OF RECTANGULAR/SQUARE COLUMN
1. DETAILS OF COLUMN
3.(a) MOMENT CARRYING CAPACITY OF LONGITUDINAL BEAM FRAMING INTO THE COLUMN
WIDTH = 400 mm
DEPTH = 750 mm
CLEAR COVER = 30 mm
DIA OF STIRRUPS USED = 12 mm
∴ DIA OF MAIN BAR USED = 25 mm
EFFECTIVE DEPTH OF THE BEAM = 695.5 mm
REINFORCEMENT PROVIDED IN THE BEAM = 1947.4 mm2
MOMENT CARRYING CAPACITY OF THE BEAM = 537.619 KN-m
3.(b) MOMENT CARRYING CAPACITY OF TRANSVERSE BEAM FRAMING INTO THE COLUMN
WIDTH = 400 mm
DEPTH = 600 mm
CLEAR COVER = 30 mm
DIA OF STIRRUPS USED = 10 mm
∴ DIA OF MAIN BAR USED = 25 mm
EFFECTIVE DEPTH OF THE BEAM = 547.5 mm
REINFORCEMENT PROVIDED IN THE BEAM = 985.5 mm2
MOMENT CARRYING CAPACITY OF THE BEAM = 221.507 KN-m
3.(c) EARTHQUAKE IN THE LONGITUDINAL DIRECTION
BOTH LONGITUDINAL BEAMS ARE PRESENT = YES
NO. OF BARS ALONG THE LONGITUDINAL DIRECTION OF COLUMN = 0
FACTORED SHEAR FORCE AS PER ANALYSIS = 46.14 KN
HEIGHT OF STOREY = 4.865 m
SHEAR FORCE CORRESPONDING TO PLASTIC HINGE FORMATION = 232.066 KN
REQUIREMENT OF SHEAR REINFORCEMENT = YES
SHEAR FORCE TO BE RESISTED BY THE STIRRUPS = 232.066 KN
DIA OF STIRRUPS PROVIDED = 10 mm
NO. OF TIES = 5
SPACING REQUIRED = 417.90 mm c/c
GOVERNING CASE FOR NOMINAL SHEAR STIRRUPS Minimum Nominal Links as Per IS 456 - 2000 Requirements