Column Splicing
Column Splicing
10 mm Ø TIES
SPACED @ 3-50mm, 2-100mm &
REST 300 mm.
THICKNESS OF SLAB SLAB SLAB
10 mm Ø TIES
SPACED @ 3-50mm, 2-100mm &
REST 300 mm.
A A
SECTION A-A
AMALSA DESIGN & CONSTRUCTION MAPANDAN GOVERNMENT HOSPITAL: PROJECT MANAGER: JOHN DE GUZMAN
PROJECT ENGINEER: MICHELLE SANGALANG
Arellano St. Dagupan City A PROPOSED FOUR - STOREY STRUCTURAL ENGINEER: LOUIE PACLEB
HOSPITAL BUILDING IN DESIGN ENGINEER: JONAS SIBAYAN
AS SHOWN
ESTIMATOR/SCHEDULER: MIGUEL ISMAEL UBANDO
MAPANDAN, PANGASINAN