Professional Documents
Culture Documents
ROW DUbai DS196-2-RTA-AREA1-CL-SHT-01 TO 03
ROW DUbai DS196-2-RTA-AREA1-CL-SHT-01 TO 03
ROW DUbai DS196-2-RTA-AREA1-CL-SHT-01 TO 03
Road
Ras Al Khor
Industrial Area 3
N
AREA NO-4A
INTERNATIONAL CITY
D6 2
AL
M AN
AM
AR AREA NO-4B
OA
D
AD
LC AREA NO-4C
AREA NO-02
18.30m CORRIDOR
RO
AREA NO-03
9.15 9.15
ED
D67
AY
7.00
Z
BIN
3.15 2.50 3.50 CARRIAGEWAY 3.50 2.50 3.15
D
FOOTPATH PARALLEL PARKING LANE LANE PARALLEL PARKING FOOTPATH
4.90
ME
AREA NO-01
AM
4.10 1.55
4.70
OH
3.40
NAD AL
K. M
2.30 3.50 SHEBA 4
SH
2.30
2%
2%
0.80
0.90
1.00
0.80
0.90
1.00
0.90
1.50
PGL
0.70
FUTURE KERB SURROUND FOR
0.80
1.20
1.50
0.40
ROAD LIGHTING PROTECTION
1.00
1.50
0.40
1.50
1.20
1.20 1.00 0.70 0.60
1.00 1.30 1.20
0.60 0.70 1.00 0.60 0.90 0.60 1.00
SEWERAGE
SEWERAGE
SEWERAGE
STREET LIGHTING
SWD MANHOLE
DEWA(WD)
DEWA(WD)
DEWA(HV)
DEWA(LV)
DEWA(LV)
ETISALAT
ETISALAT
EITC-Du
(H.C)
(H.C)
TYPICAL SERVICES RESERVATION CROSS SECTION
CROSS SECTION FOR CORRIDOR WITH OF 18.3m
SECTION B1-B1
( PROPOSED ROAD )
18.30m R.O.W.
3.50
0.90 2.27
EXISTING GUTCH ROAD
EXISTING ETISALAT
EXISTING CONDITION
SECTION B1-B1
9.38
0+839.37
CONTRACTOR
PROJECT TITLE
EXISTING ETISALAT
1.00
PROJECT DS 196/2
NAD AL SHEBA 3RD SEWERAGE AND
PROPOSED SEWERAGE
1.00
STORMWATER SYSTEM
PROPOSED DRAINAGE
DRAWING TITLE
LINE Ø400 GRP
Ras Al Khor
Industrial Area 3
N
AREA NO-4A
INTERNATIONAL CITY
D6 2
AL
MA
N AM
AR AREA NO-4B
OA
D
AD
LC AREA NO-4C
AREA NO-02
18.30m CORRIDOR
RO
AREA NO-03
9.15 9.15
ED
D67
AY
7.00
Z
BIN
3.15 2.50 3.50 CARRIAGEWAY 3.50 2.50 3.15
D
FOOTPATH PARALLEL PARKING LANE LANE PARALLEL PARKING FOOTPATH
4.90
ME
AREA NO-01
AM
4.10 1.55
4.70
OH
3.40
NAD AL
K. M
2.30 3.50 SHEBA 4
SH
2.30
2%
2%
0.80
0.90
1.00
0.80
0.90
1.00
0.90
1.50
PGL
0.70
FUTURE KERB SURROUND FOR
0.80
1.20
1.50
0.40
ROAD LIGHTING PROTECTION
1.00
1.50
0.40
1.50
1.20
1.20 1.00 0.70 0.60
1.00 1.30 1.20
0.60 0.70 1.00 0.60 0.90 0.60 1.00
SEWERAGE
SEWERAGE
SEWERAGE
STREET LIGHTING
SWD MANHOLE
DEWA(WD)
DEWA(WD)
DEWA(HV)
DEWA(LV)
DEWA(LV)
ETISALAT
ETISALAT
EITC-Du
(H.C)
(H.C)
TYPICAL SERVICES RESERVATION CROSS SECTION
CROSS SECTION FOR CORRIDOR WITH OF 18.3m
SECTION D1-D1
( PROPOSED ROAD )
18.30m R.O.W.
6.00 6.37 5.93
2.45
2.35
3.50
EXISTING GUTCH ROAD
1.17 2.35
0.90
0.90
EXISTING ETISALAT
EXISTING CONDITION
SECTION D1-D1
EXISTING ETISALAT
PROJECT DS 196/2
PROPOSED SEWER (HC)
DRAWING TITLE
PROP- SEWER MANHOLE
MH V-NB-2/6 TYPICAL SERVICES RESERVATION
CL:10.832
CROSS SECTION FOR CORRIDOR WIDTH
Ø 500 GRP
IL:8.436
EXISTING DEWA CABLE
Ras Al Khor
Industrial Area 3
N
AREA NO-4A
INTERNATIONAL CITY
D6 2
AL
MA
N AM
AR AREA NO-4B
38.10m CORRIDOR OA
D
AD
AREA NO-4C
6.25 2.50 7.30 6.00 7.30 2.50 6.25 AREA NO-02
RO
SIDEWALK/ LANDSCAPE PARALLEL CARRIAGEWAY CENTRAL MEDIAN CARRIAGEWAY PARALLEL SIDEWALK/ LANDSCAPE AREA NO-03
ED
D67
PARKING PARKING
Z AY
CL
BIN
D
ME
AREA NO-01
AM
R.O.W / BUILDING LINE
OH
R.O.W / BUILDING LINE
NAD AL
K. M
8.20 8.70 SHEBA 4
SH
6.70 7.60
5.30
5.80
12.71 3.90
4.80
2.30
3.30 9.71
1.80 0.90
0.90
0.50
0.50
2% 2% 2%
2%
0.80
0.50
0.90
0.40 0.80
1.20
0.40 0.80
1.00
0.90
1.00
0.90
1.20
1.20
1.50
1.50
1.50
1.50
1.50
1.50
1.00
3.00 0.60
1.00 1.20 1.00 1.00 0.90 0.90 0.50
0.70 0.60
STREET LIGHTING
1.80
3.30
4.80
IRRIGATION LINE
5.80
SEWERAGE
SEWERAGE
DEWA(WD)
DEWA(HV)
MANHOLE
DEWA(LV)
MANHOLE
ETISALAT
6.70
ETIC-Du
(H.C)
S.W.D.
8.20
SEWERAGE
SEWERAGE
DEWA(WD)
DEWA(HV)
MANHOLE
MANHOLE
DEWA(LV)
ETISALAT
ETIC-Du
(H.C)
S.W.D.
TYPICAL SERVICES RESERVATION CROSS SECTION FOR CORRIDOR WIDTH OF 38.10m
SECTION F1-F1
38.10m CORRIDOR
EXISTING ETISALAT
EXISTING CONDITION
SECTION F1-F1
NOC
DRAWING
38.10m CORRIDOR
8.20
8.20 6.40
12.71
9.71 3.50 DRAINAGE PROJECTS DEPARTMENT
EXISTING GUTCH ROAD
2.35 CONSULTANT
0.90
0.90
2% 11.537 2%
0+646.65
CONTRACTOR
EXISTING WATER Ø150
EXISTING ETISALAT
P.O.BOX-29703, DUBAI,U.A.E
PROPOSED S.W.D.Ø315uPVC
PROJECT TITLE
PROPOSED SEWERAGE Ø400GRP
PROJECT DS 196/2
NAD AL SHEBA 3RD SEWERAGE AND
PROPOSED S.W.D. Ø700 GRP
STORMWATER SYSTEM
DRAWING TITLE
TYPICAL SERVICES RESERVATION
PROPOSED CONDITION CROSS SECTION FOR CORRIDOR WIDTH
SECTION F1-F1 OF 38.10m EX.CONDITION & PROPOSED
(SECTION F1-F1)
DESIGNED DRAWN CHECKED APPROVED
DIPAK JBN DIPAK Eng.SHADI
DATUM: W.G.S-84 (DLTM)
SCALE HORIZ. VERT.
(AS SHOWN)
DATE WORK ORDER NO.
0 1 2 3 5 7m 14-04-2023 DS 196/2
CONTRACT NO. DRAWING NO. REV.
Scale 1:100 DS 196-2 DS196-2-RTA-AREA1-CL-SHT-03 00