ROW DUbai DS196-2-RTA-AREA1-CL-SHT-01 TO 03

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Al Awir

Road

Ras Al Khor
Industrial Area 3
N
AREA NO-4A

INTERNATIONAL CITY

D6 2
AL
M AN
AM
AR AREA NO-4B
OA
D

AD
LC AREA NO-4C
AREA NO-02
18.30m CORRIDOR

RO
AREA NO-03
9.15 9.15

ED
D67

AY
7.00

Z
BIN
3.15 2.50 3.50 CARRIAGEWAY 3.50 2.50 3.15

D
FOOTPATH PARALLEL PARKING LANE LANE PARALLEL PARKING FOOTPATH
4.90

ME
AREA NO-01

AM
4.10 1.55
4.70

OH
3.40
NAD AL

K. M
2.30 3.50 SHEBA 4

SH
2.30

R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


1.80 1.80
0.90 0.90
0.50 0.50
2%

2%
2%

0.80

0.90
1.00
0.80
0.90

1.00

0.90

1.50
PGL

0.70
FUTURE KERB SURROUND FOR

0.80
1.20
1.50

0.40
ROAD LIGHTING PROTECTION

1.00

1.50
0.40

1.50
1.20
1.20 1.00 0.70 0.60
1.00 1.30 1.20
0.60 0.70 1.00 0.60 0.90 0.60 1.00

SEWERAGE

SEWERAGE

SEWERAGE
STREET LIGHTING

SWD MANHOLE
DEWA(WD)

DEWA(WD)
DEWA(HV)
DEWA(LV)

DEWA(LV)
ETISALAT

ETISALAT
EITC-Du

(H.C)
(H.C)
TYPICAL SERVICES RESERVATION CROSS SECTION
CROSS SECTION FOR CORRIDOR WITH OF 18.3m

SECTION B1-B1
( PROPOSED ROAD )

18.30m R.O.W.

R.O.W. / BUILDING LINE

R.O.W. / BUILDING LINE


6.85 6.25 5.20
UNMADE AREA UNMADE AREA

3.50

0.90 2.27
EXISTING GUTCH ROAD

EXISTING WATER Ø150

EXISTING DEWA CABLE

EXISTING ETISALAT
EXISTING CONDITION
SECTION B1-B1

00 ISSUED FOR APPROVAL MAN DM S.A 13-04-23


REV. DESCRIPTION DRWN CKD APPD DATE
STATUS
NOC
18.30m R.O.W.
DRAWING
R.O.W. / BUILDING LINE

R.O.W. / BUILDING LINE


6.85 6.25 5.20
UNMADE AREA UNMADE AREA
4.90
3.50 4.55 4.70
DRAINAGE PROJECTS DEPARTMENT
0.90 2.27
EXISTING GUTCH ROAD CONSULTANT

9.38
0+839.37
CONTRACTOR

NAEL CONSTRUCTION & CONTRACTING


P.O.BOX-29703, DUBAI,U.A.E
EXISTING WATER Ø150

EXISTING DEWA CABLE

PROJECT TITLE
EXISTING ETISALAT

1.00
PROJECT DS 196/2
NAD AL SHEBA 3RD SEWERAGE AND
PROPOSED SEWERAGE

1.00
STORMWATER SYSTEM
PROPOSED DRAINAGE

DRAWING TITLE
LINE Ø400 GRP

TYPICAL SERVICES RESERVATION


CROSS SECTION FOR CORRIDOR WIDTH
Ø 315 uPVC

OF 18.30m EX.CONDITION & PROPOSED


(SECTION B1-B1)
DESIGNED DRAWN CHECKED APPROVED
DIPAK MANSOOR DIPAK Eng.SHADI
PROPOSED CONDITION DATUM: W.G.S-84 (DLTM)
SECTION B1-B1 SCALE
(AS SHOWN)
HORIZ. VERT.

DATE WORK ORDER NO.


0 0.5 1.50 2.50 5.0m 13-04-2023 DS 196/2
CONTRACT NO. DRAWING NO. REV.
Scale 1:75 DS 196-2 DS196-2-RTA-AREA1-CL-SHT-01 00

Z:\_DS196-2\01.WORKING\03-NOC\09-RTA COVERL LEVELS\AREA1\REV-00\SEW\SHEET-1\DS196-2-RTA-AREA1-CL-SHT-01 TO 03


Al Awir
Road

Ras Al Khor
Industrial Area 3
N
AREA NO-4A

INTERNATIONAL CITY

D6 2
AL
MA
N AM
AR AREA NO-4B
OA
D

AD
LC AREA NO-4C
AREA NO-02
18.30m CORRIDOR

RO
AREA NO-03
9.15 9.15

ED
D67

AY
7.00

Z
BIN
3.15 2.50 3.50 CARRIAGEWAY 3.50 2.50 3.15

D
FOOTPATH PARALLEL PARKING LANE LANE PARALLEL PARKING FOOTPATH
4.90

ME
AREA NO-01

AM
4.10 1.55
4.70

OH
3.40
NAD AL

K. M
2.30 3.50 SHEBA 4

SH
2.30

R.O.W / BUILDING LINE

R.O.W / BUILDING LINE


1.80 1.80
0.90 0.90
0.50 0.50
2%

2%
2%

0.80

0.90
1.00
0.80
0.90

1.00

0.90

1.50
PGL

0.70
FUTURE KERB SURROUND FOR

0.80
1.20
1.50

0.40
ROAD LIGHTING PROTECTION

1.00

1.50
0.40

1.50
1.20
1.20 1.00 0.70 0.60
1.00 1.30 1.20
0.60 0.70 1.00 0.60 0.90 0.60 1.00

SEWERAGE

SEWERAGE

SEWERAGE
STREET LIGHTING

SWD MANHOLE
DEWA(WD)

DEWA(WD)
DEWA(HV)
DEWA(LV)

DEWA(LV)
ETISALAT

ETISALAT
EITC-Du

(H.C)
(H.C)
TYPICAL SERVICES RESERVATION CROSS SECTION
CROSS SECTION FOR CORRIDOR WITH OF 18.3m

SECTION D1-D1
( PROPOSED ROAD )

18.30m R.O.W.
6.00 6.37 5.93

R.O.W. / BUILDING LINE

R.O.W. / BUILDING LINE


UNMADE AREA UNMADE AREA
5.01

2.45
2.35
3.50
EXISTING GUTCH ROAD
1.17 2.35
0.90
0.90

EXISTING STEEL FENCE


EXISTING DEWA CABLE
EXISTING WATER Ø150

EXISTING WATER Ø150


EXISTING DEWA CABLE
EXISTING DEWA CABLE
EXISTING ETISALAT

EXISTING ETISALAT
EXISTING CONDITION
SECTION D1-D1

00 ISSUED FOR APPROVAL JBN DM S.A 14-04-23


REV. DESCRIPTION DRWN CKD APPD DATE
STATUS
NOC
18.30m R.O.W. DRAWING
6.00 6.37 5.93
EXISTING STEEL FENCE
R.O.W. / BUILDING LINE

R.O.W. / BUILDING LINE


UNMADE AREA UNMADE AREA
5.01
4.90
2.45
2.35 4.76 4.70
1.80 DRAINAGE PROJECTS DEPARTMENT
3.50
EXISTING GUTCH ROAD CONSULTANT
1.17 2.35
0.90
10.516 0.90
0+044.79
CONTRACTOR

NAEL CONSTRUCTION & CONTRACTING


P.O.BOX-29703, DUBAI,U.A.E
EXISTING DEWA CABLE
EXISTING WATER Ø150

EXISTING WATER Ø150


EXISTING DEWA CABLE

1.00 PROJECT TITLE


EXISTING ETISALAT

EXISTING ETISALAT

PROJECT DS 196/2
PROPOSED SEWER (HC)

1.00 NAD AL SHEBA 3RD SEWERAGE AND


STORMWATER SYSTEM
PROPOSED DRAINAGE

DRAWING TITLE
PROP- SEWER MANHOLE
MH V-NB-2/6 TYPICAL SERVICES RESERVATION
CL:10.832
CROSS SECTION FOR CORRIDOR WIDTH
Ø 500 GRP

IL:8.436
EXISTING DEWA CABLE

OF 18.30m EX.CONDITION & PROPOSED


(SECTION D1-D1)
DESIGNED DRAWN CHECKED APPROVED
DIPAK JBN DIPAK Eng.SHADI
PROPOSED CONDITION DATUM: W.G.S-84 (DLTM)
SECTION D1-D1 SCALE
(AS SHOWN)
HORIZ. VERT.

DATE WORK ORDER NO.


0 0.5 1.50 2.50 5.0m 14-04-2023 DS 196/2
CONTRACT NO. DRAWING NO. REV.
Scale 1:75 DS 196-2 DS196-2-RTA-AREA1-CL-SHT-02 00

Z:\_DS196-2\01.WORKING\03-NOC\09-RTA COVERL LEVELS\AREA1\REV-00\SEW\SHEET-1\DS196-2-RTA-AREA1-CL-SHT-01 TO 03


Al Awir
Road

Ras Al Khor
Industrial Area 3
N
AREA NO-4A

INTERNATIONAL CITY

D6 2
AL
MA
N AM
AR AREA NO-4B
38.10m CORRIDOR OA
D

AD
AREA NO-4C
6.25 2.50 7.30 6.00 7.30 2.50 6.25 AREA NO-02

RO
SIDEWALK/ LANDSCAPE PARALLEL CARRIAGEWAY CENTRAL MEDIAN CARRIAGEWAY PARALLEL SIDEWALK/ LANDSCAPE AREA NO-03

ED
D67
PARKING PARKING

Z AY
CL

BIN
D
ME
AREA NO-01

AM
R.O.W / BUILDING LINE

OH
R.O.W / BUILDING LINE
NAD AL

K. M
8.20 8.70 SHEBA 4

SH
6.70 7.60
5.30
5.80
12.71 3.90
4.80
2.30
3.30 9.71

1.80 0.90

0.90
0.50
0.50
2% 2% 2%
2%

0.80

0.50
0.90

0.40 0.80

1.20

0.40 0.80
1.00

0.90

1.00
0.90
1.20

1.20
1.50

1.50
1.50

1.50
1.50

1.50
1.00

3.00 0.60
1.00 1.20 1.00 1.00 0.90 0.90 0.50
0.70 0.60

STREET LIGHTING
1.80

3.30

4.80

IRRIGATION LINE
5.80

SEWERAGE

SEWERAGE
DEWA(WD)

DEWA(HV)

MANHOLE
DEWA(LV)

MANHOLE
ETISALAT
6.70

ETIC-Du
(H.C)

S.W.D.
8.20

SEWERAGE
SEWERAGE

DEWA(WD)
DEWA(HV)
MANHOLE

MANHOLE

DEWA(LV)
ETISALAT
ETIC-Du

(H.C)
S.W.D.
TYPICAL SERVICES RESERVATION CROSS SECTION FOR CORRIDOR WIDTH OF 38.10m

SECTION F1-F1

38.10m CORRIDOR

23.00 8.24 6.86

R.O.W / BUILDING LINE


3.50
EXISTING GUTCH ROAD
2.35
0.90
0.90
R.O.W / BUILDING LINE

EXISTING WATER Ø150

EXISTING WATER Ø300


EXISTING DEWA CABLE

EXISTING ETISALAT
EXISTING CONDITION
SECTION F1-F1

00 ISSUED FOR APPROVAL JBN DM S.A 14-04-23


REV. DESCRIPTION DRWN CKD APPD DATE

R.O.W / BUILDING LINE


STATUS
R.O.W / BUILDING LINE

NOC
DRAWING
38.10m CORRIDOR

23.00 8.24 6.86

8.20
8.20 6.40
12.71
9.71 3.50 DRAINAGE PROJECTS DEPARTMENT
EXISTING GUTCH ROAD
2.35 CONSULTANT
0.90
0.90
2% 11.537 2%
0+646.65

CONTRACTOR
EXISTING WATER Ø150

EXISTING WATER Ø300


1.00
1.55
NAEL CONSTRUCTION & CONTRACTING

EXISTING DEWA CABLE


1.10

EXISTING ETISALAT
P.O.BOX-29703, DUBAI,U.A.E
PROPOSED S.W.D.Ø315uPVC

PROJECT TITLE
PROPOSED SEWERAGE Ø400GRP
PROJECT DS 196/2
NAD AL SHEBA 3RD SEWERAGE AND
PROPOSED S.W.D. Ø700 GRP

STORMWATER SYSTEM
DRAWING TITLE
TYPICAL SERVICES RESERVATION
PROPOSED CONDITION CROSS SECTION FOR CORRIDOR WIDTH
SECTION F1-F1 OF 38.10m EX.CONDITION & PROPOSED
(SECTION F1-F1)
DESIGNED DRAWN CHECKED APPROVED
DIPAK JBN DIPAK Eng.SHADI
DATUM: W.G.S-84 (DLTM)
SCALE HORIZ. VERT.
(AS SHOWN)
DATE WORK ORDER NO.
0 1 2 3 5 7m 14-04-2023 DS 196/2
CONTRACT NO. DRAWING NO. REV.
Scale 1:100 DS 196-2 DS196-2-RTA-AREA1-CL-SHT-03 00

Z:\_DS196-2\01.WORKING\03-NOC\09-RTA COVERL LEVELS\AREA1\REV-00\SEW\SHEET-1\DS196-2-RTA-AREA1-CL-SHT-01 TO 03

You might also like