Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

RPD/ID/BIT/T/49

Design,Engineering,Finance,Construction,Operation & Maintanance of Gurgaon-Faridabad and ballabhgarh-sohna road in Faridabad and Gurgaon Districts on Build,Operate and
Transfer (BOT) basis.
(Package No. : Haryana PWD (B&R) Branch/BOT - 4 & 5)

Location Max. allowable difference between Road surface & straight edge for Max. allowable difference between Road surface & straight edge for
Layer type Tolerance in Levels Bituminous Base cource = 6mm GSB / Base cource = 8mm
SG +20mm/ -25mm Maximum Permitted Number of Surface Irregularities
Type of Surface GSB +10mm/ -20mm Type of Layer BC Surface Other Than BC Surfaces
WMM +10mm/ -10mm Irregularity 4 mm 7 mm 4 mm 7 mm
Lane DBM +6mm/ -6mm Length (m) 300 75 300 75 300 75 300 75
BC +6mm/ -6mm National Highway 20 9 2 1 40 18 4 2
Longitudinal in 'mm' Longitudinal in 'mm' Longitudinal in 'mm'
CHAINAGE Left Center Right CHAINAGE Left Center Right CHAINAGE Left Center Right

Transverse dip readings Transverse dip readings Transverse dip readings


CHAINAGE Left Center Right Camber % CHAINAGE Left Center Right Camber % CHAINAGE Left Center Right Camber %

Site Incharge Highway Engineer Independent Consultant


Contractor PMC/EPC /Concessionaire
Design,Engineering,Finance,Construction,Operation & Maintanance of Gurgaon-Faridabad and ballabhgarh-sohna road in Faridabad and Gurgaon Districts on Build,Operate and RPD/ID/
Transfer (BOT) basis.
(Package No. : Haryana PWD (B&R) Branch/BOT - 4 & 5)

Location Max. allowable difference between Road surface & straight edge for Max. allowable difference between Road surface & straight edge for
Layer type Tolerance in Levels Bituminous Concrete = 3mm GSB / Base cource = 8mm
SG +20mm/ -25mm Maximum Permitted Number of Surface Irregularities
Type of Surface GSB +10mm/ -20mm Type of Layer Bituminous Concrete (BC) / Biituminous Base Course (DBM) = 3mm / 6mm
WMM +10mm/ -10mm Irregularity 4 mm 7 mm 4 mm 7 mm
Lane DBM +6mm/ -6mm Length (m) 300 75 300 75 300 75 300 75
BC +6mm/ -6mm National Highway 20 9 2 1 40 18 4 2
Longitudinal in 'mm' Longitudinal in 'mm' Longitudinal in 'mm'
CHAINAGE Left Center Right CHAINAGE Left Center Right CHAINAGE Left Center Right

Transverse dip readings Transverse dip readings Transverse dip readings


CHAINAGE Left Center Right CHAINAGE Left Center Right CHAINAGE Left Center Right

Site Incharge Material Engineer/Highway Engineer Independent Engineer


Contractor PMC/EPC /Concessionaire