ENVIRONMENTAL IMPACT ASSESSMENT

Lecture 58: EIA Case Study –


Mumbai Metro Line 3, Colaba - Bandra - SEEPZ
Dr. HARSHIT SOSAN LAKRA
DEPARTMENT OF ARCHITECTURE AND PLANNING

1
Coverage

1 Case Study - Mumbai Metro Line 3, Colaba - Bandra - SEEPZ

2
Learning Outcomes

1 Case Study - Mumbai Metro Line 3, Colaba - Bandra - SEEPZ

3
https://www.jica.go.jp/english/our
_work/social_environmental/id/as
ia/south/india/c8h0vm0000935z0
n-att/c8h0vm0000fdf6vp.pdf

4
Content

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

5
Purpose of the Project:
To decongest the existing public transport systems and increase
mobility across the Region, MMRC through MMRC commissioned the
services of RITES to prepare a DPR and Environmental/Social Impact
Assessment study for the corridor of Colaba – Bandra – SEEPZ covering
total length of 33.508 km.

Funding Agency:
MMRC has planned to get fund from Japan International Cooperation
Agency (JICA) for the construction of Mumbai Metro Line III.
The scope of the study is framed as per JICA guidelines for
Environmental and Social considerations, 2011.

https://www.jica.go.jp/english/our_work/social_
environmental/id/asia/south/india/c8h0vm0000
935z0n-att/c8h0vm0000fdf6vp.pdf

6
Salient Features of Project

https://www.jica.go.jp/english/our_work/social_
environmental/id/asia/south/india/c8h0vm0000
935z0n-att/c8h0vm0000fdf6vp.pdf

7
Objectives and Scope of the Study

• Objective: facilitate the Mumbai Metropolitan Region Development


Authority (MMRC) in the preparation EIA report as per requirement of
regulatory and funding agency.

• Scope: of EIA includes the impacts resulting from pre-construction,


construction and operation phases of Line I Metro corridor, Depot and
sub-stations.

• MMRC has planned to get fund from Japan International Cooperation


Agency (JICA) for the construction of Mumbai Metro Line III.

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

8
• The MoEF, Government of India, Notification of 14thSeptember 2006 and
its amendment dated 1st December 2009 enlist projects in Schedule that
require environmental clearance.
• However as per the said notification a metro project does not require
environmental clearance from MoEF.
• The scope of the study is framed as per JICA guidelines for
Environmental and Social considerations.
• The objectives of the JICA guidelines are to encourage Project proponents
to have appropriate consideration for environmental and social impacts, as
well as to ensure that JICA’s support for examination of environmental and
social considerations are conducted accordingly.

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

9
Scope of the Study

https://www.jica.go.jp/english/our_work/social_
environmental/id/asia/south/india/c8h0vm0000
935z0n-att/c8h0vm0000fdf6vp.pdf

10
Environmental and Social Management and Monitoring
Plan (ESMMP)

• Construction Labour Management Plan


• Occupationnel Health and Safety Plan
• Emergency Response Plan
• Traffic Management Plan

https://www.jica.go.jp/english/our_work/social_
environmental/id/asia/south/india/c8h0vm0000
935z0n-att/c8h0vm0000fdf6vp.pdf

11
Limitations

• The impact assessment study for the proposed project is largely


based on the available project.
• Information, discussion with local community and other
stakeholders and observations from various surveys and
investigations undertaken in the study area.
• Professional judgment and subjective interpretation of facts has
been applied for this study.

https://www.jica.go.jp/english/our_work/social_
environmental/id/asia/south/india/c8h0vm0000
935z0n-att/c8h0vm0000fdf6vp.pdf

12
EIA Categorization System in JICA

• Category A - Projects are likely to have significant adverse impacts on


the environment and society. It includes projects in sensitive sectors or
with sensitive characteristics and projects located in or near sensitive
areas.
• Category B - Projects are ones with potential adverse impacts on the
environment and society less adverse than those of Category A projects.
• Category C - Projects have minimal or little adverse impacts on the
environment and society.

https://www.jica.go.jp/english/our_work/social_
environmental/id/asia/south/india/c8h0vm0000
935z0n-att/c8h0vm0000fdf6vp.pdf

13
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

14
World Bank's Operational Policies and Guidelines

https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

15
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

16
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

17
Legal Framework

https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

18
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

19
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

20
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

21
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

22
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

23
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

24
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

25
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

26
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

27
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

28
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

29
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

30
Approach and Methodology
The proposed alignment has been fixed based on Technical Feasibility, Socio-economic
acceptability, and Environmental sustainability for Metro Corridors. The
environmental study is carried out for the final alignment proposed by MMRC.

The basic concept is to ascertain the existing baseline conditions and assess
the impacts as a result of construction and operation of the project.

The impacts are assessed for various phases of project cycle namely
• Impacts due to project location
• Impacts due to project design
• Impacts due to project construction https://www.jica.go.jp/engli
• Impacts due to project operation. sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

31
Following documents were reviewed by the GC in view of current
situations and employer requirements:

1. Detailed Project Report (Chapter 9 on Environment), by RITES 2012


2. EIA report by RITES in 2012.
3. Environmental and Social Management Plan, by IC 2014.
4. Environmental Baseline Monitoring Plan, by IC 2014.
5. Addendum to Environmental and Social Management Plan, by IC 2015.

https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

32
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

33
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

34
35
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

36
Tunnel Boring Machine

https://www.herrenknecht.com/en/references/referencesdetail/mumbai-metro-line-3/

https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

37
https://www.tunneltalk.com/India-12Mar2020-Mumbai-Metro-Line-3-excavation-methods-advance-
and-statistics.php

https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

38
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

39
Analysis of Alternatives

Alignment Planning
• Selection of an optional alignment is a multi-disciplinary decision, with
objectives which may conflict with one another.
• The selection of approach for resolving the problem is the multicriteria
analysis for the alternative to be analyzed.

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

40
Following parameters are taken into consideration:

• Catchment area
• Integration with other mass transit corridors
• Construction feasibility
• Environment and social aspects.

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

41
https://www.jica.go.jp/english/ou
r_work/social_environmental/id/
asia/south/india/c8h0vm000093
5z0n-att/c8h0vm0000fdf6vp.pdf

42
https://www.jica.go.jp/english/our
_work/social_environmental/id/as
ia/south/india/c8h0vm0000935z0
n-att/c8h0vm0000fdf6vp.pdf

43
Analysis of Alternatives

Depot Planning

The proposed corridor


would require a dedicated
depot for the maintenance
of the rakes.

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

44
Proposed Alternative sites for Depot

Following sites had been selected


for the depot having requisite size
along the alignment.

Mahalaxmi Race Course


Kalina University Land
Aarey Milk Colony Land

https://www.jica.go.jp/english/our_work/soci
al_environmental/id/asia/south/india/c8h0v
m0000935z0n-att/c8h0vm0000fdf6vp.pdf

45
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

46
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

47
48
https://www.jica.go.jp/english/our_work/soci
al_environmental/id/asia/south/india/c8h0v
m0000935z0n-att/c8h0vm0000fdf6vp.pdf

49
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

50
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

51
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

52
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

53
https://www.jica.go.jp/english/our
_work/social_environmental/id/a
sia/south/india/c8h0vm0000935z
0n-att/c8h0vm0000fdf6vp.pdf

54
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

55
https://www.jica.go.jp/english/our_work/socia
l_environmental/id/asia/south/india/c8h0vm0
000935z0n-att/c8h0vm0000fdf6vp.pdf

56
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

57
https://www.jica.go.jp/english/our_work/social_environmental/id/asi
a/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

58
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

59
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

60
Mangroves of the Mithi Estuary

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

61
Sanjay Gandhi National Park

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

62
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

63
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

64
Potential Ecological Impacts of the Project

• Removal of Trees

• Loss and/or Degradation of Biodiversity

• Loss and/or Degradation of Soil

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

65
https://www.mmrcl.com/sites/default/files/SIA%20Report%202020.pdf

66
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

67
Western Railway Head Quarter
CST Railway Station &
on Jamshedji Tata Road
BMC Building at DN Road

68
https://www.mmrcl.com/sites/default/files/SIA%20Report%202020.pdf

69
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

70
71
Negative Environmental Impacts

• Land Environment
• Water Environment
• Air Environment
• Noise Environment
• Biological Environment
• Socio-Economic Environment

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

72
Negative Environmental Impacts

Impacts due to project location

• Project Affected People (PAPs)


• Change of Land use;
• Loss of trees/forest;
• Utility/Drainage Problems,
• Impact on Historical and Cultural Monuments, and
• Impact on Local Transport Facilities

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

73
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

74
https://www.jica.go.jp/english/our_
work/social_environmental/id/asia/
south/india/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

75
https://www.jica.go.jp/english/our_work/soc
ial_environmental/id/asia/south/india/c8h0v
m0000935z0n-att/c8h0vm0000fdf6vp.pdf

76
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

77
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

78
Impacts Due To Project Design

• No hazard is anticipated due to the proposed sizes of inlets and outlets.

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

79
Metro Station Refuse

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

80
Risk Due to Earthquake

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

81
Impact Due to Project Construction

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

82
Health Risk at Construction Site

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

83
Impact on Sensitive Receptors

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

84
Impact Due to Labour Camp

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

85
Impact Due to Blasting

https://www.jica.go.jp/english/our_work/socia
l_environmental/id/asia/south/india/c8h0vm0
000935z0n-att/c8h0vm0000fdf6vp.pdf

86
Impact Due to Project Operation

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

87
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

88
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

89
Water Supply and Sanitation

https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

90
Impacts Due to Depot

https://www.jica.go.jp/english/our_work/social_environmental/id/a
sia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

91
https://www.jica.go.jp/english/our_work/social_environmental/id/asi
a/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

92
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

93
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

94
https://www.jica.go.jp/english/our_work/social_environmental/id/
asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

95
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

96
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

97
https://www.jica.go.jp/english/our_work/social_environmental/id/
asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

98
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

99
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

100
https://www.jica.go.jp/english/our_work/social_environmental/id/a
sia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

101
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

102
https://www.jica.go.jp/english/our_work/social_environmental/id/
asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

103
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

104
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

105
https://www.jica.go.jp/english/our_work/social_environmental/id/
asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

106
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

107
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-att/c8h0vm0000fdf6vp.pdf

108
https://www.jica.go.jp/engl
ish/our_work/social_envir
onmental/id/asia/south/ind
ia/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

109
https://www.jica.go.jp/engli
sh/our_work/social_enviro
nmental/id/asia/south/india
/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

110
Summary

1 Case study - Mumbai Metro Line 3- Colaba –Bandra -SEEPZ

111
References
1 Social Impact Assessment Report (Volume -1), MAPLE Consortium - General Consultant for Mumbai
Metro Line 3, December – 2020;
https://www.jica.go.jp/english/our_work/social_environmental/id/asia/south/india/c8h0vm0000935z0n-
att/c8h0vm0000fdf6vp.pdf

112
Suggested Watch and Read

https://www.youtube.com/watch?v=V https://www.youtube.com/watch?v=skb1Q https://www.youtube.com/watch?v=ukMU


djtsErp4i0&t=4s&ab_channel=Bacteri Ihh9QM&ab_channel=ThinkAdvertising rHP9830&ab_channel=LondonAssembly
aatwork

113
Please feel free to ask Questions.
Let us know about any Concerns you have .
Do share your Opinions, Experiences and
Suggestions.
Looking forward to Interacting and
Co-learning with you while exploring EIA

114