Four Laning of Harda to Teamagaon section (Harda - Betul Pkg-1) NH-47(Old

NH-59A) from Design Ch. 0.000 To Design Ch. 30.000 (Length - 30.00 Km)
under Bharatmala Pariyojana Phase - 1 (Economic Corridor) in the state of
Madhya Pradesh on HAM Mode
Client : National Highways Authority of India

Independent Engineer : Lion Engineering Consultant Private Limited

Concessionaire : Harda Pathways Private Limited

EPC : Prakash Asphaltings & Toll Highways India Limited

DAILY WEATHER REPORT

Location of Weather station Month FEBRUARY


Temparature Humidity Rainfall
Date o o o o Status Remark
Min C Max C Min C Max C 24 hr.(mm)
1-Feb-24 15.5 28 72 65
2-Feb-24 16.8 28.9 70 60
3-Feb-24 17.9 29.2 67 57
4-Feb-24 18.5 27 67 60
5-Feb-24 18.9 28 67 58
6-Feb-24 20.1 29 71 60
7-Feb-24 18.4 28.5 71 62
8-Feb-24 16.4 24.6 63 55
9-Feb-24 14.3 25.4 62 55
10-Feb-24 15.5 25.5 60 55
11-Feb-24 14.6 26.0 79 62
12-Feb-24 19.0 24.6 77 64
13-Feb-24 18.0 25.0 78 66
14-Feb-24 17.9 24.8 75 77
15-Feb-24 19.0 27.8 76 65
16-Feb-24 19.1 29.8 72 64
17-Feb-24 20.4 28.6 65 57
18-Feb-24 19.5 32.8 72 42
19-Feb-24 20.9 32.2 66 43
20-Feb-24 20.5 31.8 55 44
21-Feb-24 21.8 31.0 50 42
22-Feb-24 22.9 32.0 51 42
23-Feb-24 19.8 29.6 68 52
24-Feb-24 19.6 28.9 70 60
25-Feb-24 19.8 28.5 71 55
26-Feb-24 18.4 24.6 70 57
27-Feb-24 19.6 28.4 69 58
28-Feb-24 21.4 27.2 65 57
29-Feb-24 21.2 28.6 64 58

For Contractor Rep. For Concessionaire Rep. For IE Rep.