Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

KIIFB - Improvements to Hill Highway Kallikkad to Parasala First Phase Kudappanamoodu to Parasala

CH: KM 15/715 to KM 28/760 and CH: KM 31/410 to 33/860 in Thiruvananthapuram district.

CBR MOULD
Client : The Project Director KRFB
Execution agency : KRFB - PMU Division Thiruvananthapuram
Contractor : ULCCS Ltd
Calibration of C.B.R Mould
Date of Calibration : 18/03/2021
Due date of Calibration : 17/03/2022
Mould Internal Dia. In Tolerance as per Internal Height. In Tolerance as per
Mould No Average Average Volume Remarks
Weight (gm) mm IS: 9669 (In mm) mm IS: 9669 (In mm)
150.05 174.99
1 7165 150.02 150.03 150±0.1 175.02 175.00 175±0.1 2249
150.02 174.99
149.99 175.10
2 6735 150.05 150.02 150±0.1 175.00 175.02 175±0.1 2249
150.02 174.96
149.99 175.00
3 7330 150.03 150.02 150±0.1 175.00 175.00 175±0.1 2249
150.05 174.99
149.98 175.11
4 7135 150.03 150.01 150±0.1 174.96 174.99 175±0.1 2249
150.03 174.90
150.02 175.06
5 7145 150.06 150.02 150±0.1 175.03 175.04 175±0.1 2250
149.99 175.03
150.06 174.99
6 5820 150.04 150.05 150±0.1 175.04 175.03 175±0.1 2250
150.05 175.05

QC Engineer-ULCCS Project Engineer-KRFB Assistant Engineer


KIIFB - Improvements to Hill Highway Kallikkad to Parasala First Phase Kudappanamoodu to Parasala
CH: KM 15/715 to
KM 28/760 and CH: KM 31/410 to 33/860 in Thiruvananthapuram district.

PROCTOR MOULD
Client : The Project Director KRFB
Execution agency : KRFB - PMU Division Thiruvananthapuram
Contractor : ULCCS Ltd
Calibration of Proctor Equipments

i) Volume of Mould 1000 cc Date of Calibration : 18/03/2021


Due date of Calibration : 17/03/2022

Mould Weight Internal Dia. In Tolerance as per


Mould No Average Remarks
(gm) mm IS:10074 in mm

100
1 3890 99.98 99.98 100±0.4
99.98

Internal Height In Tolerance as per


Mould No Average Remarks
mm IS:10074 in mm

127.18
1 127.25 127.21 127.3±0.2
127.20

2) Hammer

Hammer Weight Free Fall Height Foot Rammer Dia. of Foot Rammer
Hammer No
in kg in mm Height in mm in mm

1 2.614 310.00 50.05 49.96

Tolerance as per
2.6±0.025 310±0.5 50±0.5 50±0.2
IS:10074 in mm

QC Engineer-ULCCS Project Engineer-KRFB Assistant Engineer


KIIFB - Improvements to Hill Highway Kallikkad to Parasala First Phase Kudappanamoodu to Parasala
CH: KM 15/715 to
KM 28/760 and CH: KM 31/410 to 33/860 in Thiruvananthapuram district.

PROCTOR MOULD
Client : The Project Director KRFB
Execution agency : KRFB - PMU Division Thiruvananthapuram
Contractor : ULCCS Ltd
Calibration of Proctor Equipments

i) Volume of Mould 2250 cc Date of Calibration : 18/03/2021


Due date of Calibration : 17/03/2022

Mould Weight Internal Dia. In Tolerance as per


Mould No Average Volume Remarks
(gm) mm IS:10074 in mm

150.05
1 5622 150.02 150.04 150±0.4 2249
150.05

Internal Height In Tolerance as per


Mould No Average Remarks
mm IS:10074 in mm

127.28
1 127.25 127.26 127.3±0.2
127.25

2) Hammer

Hammer Weight Free Fall Height Foot Rammer Dia. Of Foot Rammer
Hammer No
in kg in mm Height in mm in mm

1 4.915 450.00 130.05 49.95

Tolerance as per
4.9±0.05 450±0.5 130±0.5 50±0.2
IS:10074 in mm

QC Engineer-ULCCS Project Engineer-KRFB Assistant Engineer


KIIFB - Improvements to Hill Highway Kallikkad to Parasala First Phase Kudappanamoodu to Parasala
CH: KM 15/715 to KM
28/760 and CH: KM 31/410 to 33/860 in Thiruvananthapuram district.

SMAPLE CONTAINERS
Client : The Project Director KRFB
Execution agency : KRFB - PMU Division Thiruvananthapuram
Contractor : ULCCS Ltd
Description : Sample containers - small
Qty : 50 nos
Date : 18/03/2021
Container Container
SL.No ID Mark Remarks SL.No ID Mark Remarks
Weight Weight
1 1 33.83 26 26 32.73
2 2 34.17 27 27 31.62
3 3 34.79 28 28 33.87
4 4 32.77 29 29 32.75
5 5 33.88 30 30 31.76
6 6 29.97 31 31 31.21
7 7 32.78 32 32 32.02
8 8 32.11 33 33 32.33
9 9 36.00 34 34 32.29
10 10 29.99 35 35 32.09
11 11 35.09 36 36 31.27
12 12 34.74 37 37 31.82
13 13 33.86 38 38 30.24
14 14 34.21 39 39 33.05
15 15 34.10 40 40 29.94
16 16 34.39 41 41 32.14
17 17 34.33 42 42 30.28
18 18 34.07 43 43 33.13
19 19 32.17 44 44 30.57
20 20 33.91 45 45 30.18
21 21 34.37 46 46 28.35
22 22 35.39 47 47 32.28
23 23 34.21 48 48 33.18
24 24 33.52 49 49 29.98
25 25 31.08 50 50 34.29

Remarks :
QC Engineer-ULCCS Project Engineer-KRFB Assistant Engineer
KIIFB - Improvements to Hill Highway Kallikkad to Parasala First Phase Kudappanamoodu to Parasala
CH: KM 15/715 to KM 28/760 and CH: KM 31/410 to 33/860 in
Thiruvananthapuram district.
CBR MOULD
Client : The Project Director KRFB
Execution agency : KRFB - PMU Division Thiruvananthapuram
Contractor : ULCCS Ltd
Calibration of C.B.R Mould
Date of Calibration 18/03/2021
Due date of Calibration 17/03/2022
Distance b/t opp Tolerance as per Hight of mould in Tolerance as per
Mould No Average Average Remarks
faces in mm IS: 10086 (In mm) mm IS: 10086 (In mm)
150.06 150.02
1 150.05 150.05 150±0.2 150.02 150.02 150±0.2
150.05 150.01
150.00 150.00
2 150.00 150.02 150±0.2 150.00 150.01 150±0.2
150.05 150.02
150.02 150.00
3 150.01 150.01 150±0.2 150.02 150.01 150±0.2
150.00 150.00
150.03 150.01
4 150.03 150.03 150±0.2 150.01 150.01 150±0.2
150.02 150.01
150.00 150.03
5 150.00 150.00 150±0.2 150.02 150.02 150±0.2
150.01 150.02
150.00 150.00
6 150.00 150.00 150±0.2 150.00 150.00 150±0.2
150.00 150.00
150.10 150.01
7 150.06 150.07 150±0.2 150.03 150.02 150±0.2
150.05 150.02
150.01 150.01
8 150.02 150.02 150±0.2 150.01 150.01 150±0.2
150.02 150.00
150.00 150.02
9 150.00 150.00 150±0.2 150.03 150.02 150±0.2
150.00 150.02
150.04 150.01
10 150.06 150.04 150±0.2 150.00 150.00 150±0.2
150.03 150.00
150.00 150.00
11 150.02 150.01 150±0.2 150.02 150.01 150±0.2
150.01 150.01
150.02 150.01
12 150.03 150.02 150±0.2 150.02 150.01 150±0.2
150.02 150.00
150.00 150.00
13 150.02 150.01 150±0.2 150.00 150.00 150±0.2
150.02 150.00
150.04 150.01
14 150.02 150.03 150±0.2 150.01 150.01 150±0.2
150.02 150.01
150.06 150.02
15 150.04 150.05 150±0.2 150.02 150.01 150±0.2
150.04 150.00
150.00 150.03
16 150.00 150.00 150±0.2 150.02 150.03 150±0.2
150.00 150.03
150.00 150.02
17 150.02 150.01 150±0.2 150.02 150.01 150±0.2
150.00 150.00
150.03 150.01
18 150.01 150.02 150±0.2 150.01 150.01 150±0.2
150.01 150.01
150.06 150.03
19 150.04 150.04 150±0.2 150.02 150.03 150±0.2
150.03 150.03
150.06 150.01
20 150.06 150.06 150±0.2 150.00 150.00 150±0.2
150.05 150.00
KIIFB - Improvements to Hill Highway Kallikkad to Parasala First Phase Kudappanamoodu to Parasala
CH: KM 15/715 to KM 28/760 and CH: KM 31/410 to 33/860 in
Thiruvananthapuram district.
CBR MOULD
Client : The Project Director KRFB
Execution agency : KRFB - PMU Division Thiruvananthapuram
Contractor : ULCCS Ltd
Calibration of C.B.R Mould
Date of Calibration 18/03/2021
Due date of Calibration 17/03/2022
Distance b/t opp Tolerance as per Hight of mould in Tolerance as per
Mould No Average Average Remarks
faces in mm IS: 10086 (In mm) mm IS: 10086 (In mm)
150.04 150.01
21 150.03 150.04 150±0.2 150.00 150.00 150±0.2
150.04 150.00
150.01 150.02
22 150.00 150.01 150±0.2 150.01 150.01 150±0.2
150.01 150.00
150.00 150.03
23 150.01 150.01 150±0.2 150.02 150.02 150±0.2
150.02 150.02
150.02 150.03
24 150.02 150.02 150±0.2 150.00 150.01 150±0.2
150.02 150.01
150.02 150.01
25 150.04 150.02 150±0.2 150.01 150.01 150±0.2
150.01 150.00
150.06 150.02
26 150.05 150.05 150±0.2 150.01 150.01 150±0.2
150.05 150.01
150.01 150.00
27 150.00 150.00 150±0.2 150.00 150.00 150±0.2
150.00 150.01
150.08 150.03
28 150.06 150.07 150±0.2 150.00 150.01 150±0.2
150.06 150.00
150.00 150.01
29 150.02 150.01 150±0.2 150.00 150.00 150±0.2
150.01 150.00
150.04 150.02
30 150.05 150.04 150±0.2 150.00 150.01 150±0.2
150.02 150.00
150.06 150.01
31 150.04 150.05 150±0.2 150.01 150.01 150±0.2
150.04 150.00
150.00 150.03
32 150.00 150.00 150±0.2 150.02 150.02 150±0.2
150.01 150.02
150.00 150.00
33 150.01 150.01 150±0.2 150.01 150.00 150±0.2
150.02 150.00
150.00 150.00
34 150.03 150.02 150±0.2 150.02 150.01 150±0.2
150.02 150.02
150.04 150.02
35 150.02 150.02 150±0.2 150.03 150.03 150±0.2
150.01 150.03
150.02 150.01
36 150.01 150.02 150±0.2 150.00 150.01 150±0.2
150.02 150.01
150.00 150.00
37 150.00 150.01 150±0.2 150.02 150.01 150±0.2
150.02 150.02
150.04 150.00
38 150.03 150.04 150±0.2 150.01 150.00 150±0.2
150.04 150.00
150.06 150.01
39 150.04 150.05 150±0.2 150.00 150.01 150±0.2
150.06 150.01
150.04 150.00
40 150.05 150.05 150±0.2 150.02 150.01 150±0.2
150.05 150.00
KIIFB - Improvements to Hill Highway Kallikkad to Parasala First Phase Kudappanamoodu to Parasala
CH: KM 15/715 to KM 28/760 and CH: KM 31/410 to 33/860 in
Thiruvananthapuram district.
CBR MOULD
Client : The Project Director KRFB
Execution agency : KRFB - PMU Division Thiruvananthapuram
Contractor : ULCCS Ltd
Calibration of C.B.R Mould
Date of Calibration 18/03/2021
Due date of Calibration 17/03/2022
Distance b/t opp Tolerance as per Hight of mould in Tolerance as per
Mould No Average Average Remarks
faces in mm IS: 10086 (In mm) mm IS: 10086 (In mm)
150.03 150.02
41 150.02 150.02 150±0.2 150.01 150.01 150±0.2
150.02 150.00
150.03 150.02
42 150.02 150.02 150±0.2 150.00 150.01 150±0.2
150.02 150.01
150.00 150.00
43 150.01 150.00 150±0.2 150.02 150.01 150±0.2
150.00 150.00
150.04 150.03
44 150.06 150.04 150±0.2 150.00 150.02 150±0.2
150.03 150.03
150.04 150.00
45 150.01 150.03 150±0.2 150.00 150.00 150±0.2
150.03 150.00
150.06 150.00
46 150.04 150.05 150±0.2 150.00 150.00 150±0.2
150.04 150.01
150.04 150.00
47 150.03 150.03 150±0.2 150.00 150.00 150±0.2
150.03 150.00
150.04 150.02
48 150.06 150.05 150±0.2 150.00 150.01 150±0.2
150.05 150.02
150.02 150.01
49 150.02 150.02 150±0.2 150.01 150.01 150±0.2
150.02 150.01
150.00 150.00
50 150.00 150.00 150±0.2 150.00 150.01 150±0.3
150.01 150.02

You might also like