Package Title:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 2 of 69
Table of Contents
1 Introduction ................................ ................................ ................................ ............................ 5
1.1 Purpose ............................................................................................................................................ 5
4.2 TABLE 2 – For Mineral wool in valve boxes and flange boxes ....................................................... 13
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 3 of 69
5.6 Class 05. Fire Proofing. For max OT > 100 °C ..................................................................................
Class 15. Heat Conservation and Fire Proofing. For max OT > 100 °C .............................................
Class 35. Personnel Protection and Fire Proofing. For max OT > 100 °C .........................................
Class 45. Frost Proofing and Fire Proofing. For max OT > 100 °C ....................................................
Class 56. Fire Proofing and Acoustic Insulation. For max OT > 80 °C ...............................................
Class 57. Fire Proofing and Acoustic Insulation. For max OT > 80 °C............................................ 43
5.10 Class 56. Fire Proofing and Acoustic Insulation. For max OT ≤ 80 °C ...............................................
Class 57. Fire Proofing and Acoustic Insulation. For max OT ≤ 80 °C ............................................ 51
5.11 Class 58. Fire Proofing and Acoustic Insulation. For max OT ≤ 100 °C .......................................... 53
5.12 Class 58. Fire Proofing and Acoustic Insulation. For max OT ≥ 100 °C .......................................... 55
6 VALVE AND FLANGE BOX DETAILS ................................ ................................ ................. 57
6.1 Adjustable Locking Devices ............................................................................................................ 57
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 4 of 69
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 5 of 69
1 Introduction
1.1 Purpose
The purpose of this procedure prepared by Beerenberg Corp. AS is to give the insulation requirements
and material build-up applicable to the Ivar Aasen Field Development Project - pdQ.
All insulating work is to be done in accordance with this procedure and documents referred to.
1.2 Abbreviations
AES Alkali Earth Silicate wool
AI Acoustic Insulation
FP Fire Proofing
HC Heat Conservation
ID Internal Diameter
Max Maximum
Min Minimum
OT Operating temperature
PP Personnel Protection
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 6 of 69
1.3 References
Note: Line List to be read in conjunction with Master P&ID’s and Isometric drawings.
Revision Modifications
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 7 of 69
IPS describes the factors and conditions that are decisive for choice of materials, thicknesses, system
build up and products.
Furthermore, it includes installation descriptions of the current insulation work to be done, in form of
drawings (sketches) and its detailed information.
In addition, there are also necessary and important documentation in that respect - such as test reports,
verification reports and similar. These reports will be included in the final certification records (Ref. DN02-
FA0033-L-RD-0001, Latest revision)
This procedure describes technical insulation solutions and quality control based on the requirements
settled in the governing documents.
All insulation work for Company on Ivar Aasen Field Development Project - pdQ to be carried out as
described in this IPS.
Products and materials that is part of the insulation systems are HES-evaluated in accordance to
Company criteria (see NORSOK standard R-004 Edition 3).
SMOE project managers and governing personnel must make them familiar with and implement guidelines
for insulation performance described in this IPS. The governing personnel include project managers,
supervisors, QC personnel and equivalent.
All personnel involved shall meet the personnel qualifications in NORSOK standard R-004 Edition 3.
It is required to document that all installation personnel are sufficiently familiar with the following governing
documentation; NORSOK standard R-004 Edition 3, Specification for Insulation (DN02-SM-M-SP-0006,
Latest revision) and Insulation Procedure Specification (DN02-FA0033-L-FD-0002, Latest revision).
All drawings are for illustration purposes only. Orientation of the boxes should not be read as a
requirement.
NORSOK standard R-004, Piping and equipment insulation, Edition 3, August 2006
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 8 of 69
Equipment installed on piping systems where insulation is required and that requires regular
maintenance, replacement, inspection etc., such as probes for corrosion monitoring, are to be insulated
with removable insulation.
If not otherwise specified, all temperatures refer to normal operation temperature. General reference is
given to Norm. Opr temp. For PP and PFP applications involving Chartek system Max temperature
shall be used.
3.1 HSE
Approved HSE product data sheets shall be available for all materials. All materials shall comply with
applicable health and safety regulations both in the country where the insulation is applied and the country
where the product is to be used.
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 9 of 69
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 10 of 69
4 Insulation classes
4.1 Class 01. Heat Conservation
Class 03 (T > 150 °C). Personnel Protection for T > 150 °C
Class 04. Frost Proofing
Class 13. Heat Conservation and Personnel Protection
Class 14. Heat Conservation and Frost Proofing
Class 34. Personnel Protection and Frost Proofing
TABLE 1
NPS ≤ 8” = 40 mm
With Heat Tracing
NPS > 8” = 50 mm
Class 04 SS 316 – 2B Finish For Space Restrictions
Class14 0, 7 mm ≤ DN 450 see table in doc. no.
Class 34 0, 9 mm > DN 450 Minimum thickness, or DN02-FA0033-L-LA-0002.
according to TABLE 2
Mineral wool
NOTES
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 11 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 12 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 13 of 69
4.2 TABLE 2 – For Mineral wool in valve boxes and flange boxes
(“) 10-
mm 150 200 250 300 350 400 450
100
20 ¾ 30 30 30 30 50 50 50 50
25 1 30 30 50 50 50 50 50 50
32 1¼ 30 30 50 50 50 50 50 50
40 1½ 30 30 50 50 50 50 50 50
50 2 30 30 50 50 50 50 80 80
65 2½ 30 30 50 50 50 80 80 80
80 3 30 50 50 50 50 80 80 80
100 4 50 50 50 50 50 80 80 100
150 6 50 50 50 50 80 80 80 100
200 8 50 50 50 50 80 80 80 100
Above
>24 50 50 80 80 100 100 100 150
600
and flat
surface
NOTES:
Thicknesses in millimeters.
For Space Restrictions see table in doc. no. DN02-FA0033-L-LA-0002.
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 14 of 69
VALVE BOXES
VAPOUR
BARRIER
MASTIC
SWAGED
EDGE
CRYOGEL Z
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 15 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 16 of 69
FLANGE BOXES
CRYOGEL Z
SWAGED
EDGE
MASTIC
NOTES
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 17 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 18 of 69
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 19 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 20 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 21 of 69
Operating
DN temperature (°C)
Inch T≤
(“)
10-
mm 150
100
20 ¾ 30 30
25 1 30 30
32 1¼ 30 30
40 1½ 30 30
50 2 30 30
65 2½ 30 30
80 3 30 50
100 4 50 50
150 6 50 50
200 8 50 50
250 10 50 50
300 12 50 50
350 14 50 50
400 16 50 50
450 18 50 50
500 20 50 50
600 24 50 50
Above
>24 50 50
600
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 22 of 69
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 23 of 69
Class 56 Benarx F Epoxy Box AES Wool, 25/38 mm Insulation shall be wrapped
in aluminium foil, and
Class 57 Thickness 19 mm For space restrictions use
fastened / glued to Benarx
Chartek Pyrogel XT-E, 10/20 mm
F Epoxy Box.
Max. OT
If valve/flange is Heat
Acoustic insulation only to
≥ 100 °C Traced, use same thickness
be added if specified.
as for Class 45 with Heat
Tracing.
Class 58 Benarx F Epoxy Box AES wool, 100 mm Insulation shall be wrapped
in aluminium foil, and
Thickness 19 mm For space restrictions use
fastened / glued to Epoxy
Chartek Pyrogel XT-E, 50 mm
Box.
Pyrogel XT-E 0 0 0 0 10 10 10 10 20 20
AES wool 0 0 0 0 25 25 25 25 38 38
Chartek 8 8 8 8 8 8 8 8 8 8
NOTES:
Table 4: AES to be used in general. Pyrogel XT-E to be used for space restrictions when surveyor
decides so. ( AES or Pyrogel)
Insulation thicknesses in millimetres
Operating temperatures (OT) in °C.
All pipe branches ≤ 2” is not to be insulated for Class 5 unless specified on P&ID or Line List.,
Piping components <4” sha ll not insulated for class 6/7/8 unless specifically shown on the line list and/or P&ID
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 24 of 69
VALVE
BOXES
VALVE BOX
ROKU STRIP
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 25 of 69
HATCH
Max operating Air Gap
temperature (mm)
OT ≤ 80 °C 30
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 26 of 69
FLANGE
BOXES
FLANGE BOX
OT ≤ 80 °C 30
ROKU STRIP
(SEE NOTE 1)
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 27 of 69
ROKU STRIP
(SEE NOTE 1)
NOTES
1 ROKU Strip (fire gasket) to be mounted between valve box and insulated
Fire Gasket
pipe.
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 28 of 69
Class 16 SS 316 Mineral wool – min. 40 mm For class 6, Valve & flange to
Class 17 0, 7 mm ≤ DN 450 Or ref. TABLE 2 be insulated only when
specified.
Class 36 0, 9 mm > DN 450 For Space Restrictions use
Pyrogel XT-E min 20 mm
Class 37
or table in doc. no. For class 7, flange to be
DN02-FA0033-L-LA-0002 insulated. Valve only when
specified.
Class 46 SS 316 NPS ≤ 3”, 30 mm
Class 47 0, 7 mm ≤ DN 450 NPS > 3”, 40 mm
For class 8, valve & flange to be
Without 0, 9 mm > DN 450 Mineral wool insulated.
Should be <4"
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 29 of 69
NPS ≤ 8”, 20 mm
NPS > 8”, 25 mm
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 30 of 69
VALVE BOXES
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 31 of 69
FLANGE BOXES
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 32 of 69
NOTES
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 33 of 69
NOTES:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 34 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 35 of 69
NOTES:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 36 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 37 of 69
SWAGED EDGE
NOTES:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 38 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 39 of 69
NOTES:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 40 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 41 of 69
NOTES:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 42 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 43 of 69
NOTES:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 44 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 45 of 69
SWAGED EDGE
NOTES:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 46 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 47 of 69
SWAGED EDGE
NOTES:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 48 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 49 of 69
SWAGED EDGE
NOTES:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 50 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 51 of 69
5.10 Class 56. Fire Proofing and Acoustic Insulation. For max OT ≤ 80 °C
Class 57. Fire Proofing and Acoustic Insulation. For max OT ≤ 80 °C
NOTES:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 52 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 53 of 69
5.11 Class 58. Fire Proofing and Acoustic Insulation. For max OT ≤ 100 °C
NOTES:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 54 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 55 of 69
5.12 Class 58. Fire Proofing and Acoustic Insulation. For max OT ≥ 100 °C
NOTES:
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 56 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 57 of 69
LATCH PIN
ADJUSTABLE
LATCH
HOOK
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 58 of 69
DETAIL A
IDENTIFICATION
PLATE
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 59 of 69
6.3 Hatch
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 60 of 69
CLADDING
INSULATION
ALUMINIUM FOIL
ALUMINIUM FOIL GLUED
TO INNER SIDE OF VALVE
BOX
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 61 of 69
INSULATION
CLADDING
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 62 of 69
7 Special Items
7.1 Drains / Deadlegs with and without bracing
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 63 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 64 of 69
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 65 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 66 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 67 of 69
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 68 of 69
NOTE: Larger boxes of a similar design to flange boxes may be used where space is not an issue and by
agreement with the Engineer.
Doc No: DN02-FA0033-L-FD-0002
Ivar Aasen Field Development Project - pdQ
Rev: 06I
Date: 5/19/2015
INSULATION PROCEDURE SPECIFICATION (IPS)- VALVES,
FLANGES ETC. Page: 69 of 69
SNIFFING TUBES
Note:
1. Two gaskets – one in each outer edge
of the capsule.