Board/ PRBOA/ PRBArch 3. The proprietary rights to an architectural work by a person who commissions
the Architect for the said work. These proprietary rights shall be limited to
5. Construction in a building involving changes in the materials used, use of the design for one project only.
partitioning, locations/sizes of openings, structural parts, existing utilities,
and equipment without increasing the overall area. OWNERSHIP
ALTERATION 4. When the project is not yet executed, what happens to the intellectual
property of the design/drawings?
6. According to the National Building Code, what is the maximum cost of a
traditional family dwelling? a. The intellectual property for the design does not exist until the project is built.
P15,000.00/ 15,000 b. The intellectual property for the design is the owner’s until the project is built.
7. This person is tasked with the enforcement of the National Building Code in
his or her jurisdiction. He/she issues, denies, suspends, or revokes building
c. The intellectual property for the design remains the same because the construction
permits.
of the project is irrelevant to intellectual property.
BUILDING OFFICIAL
d. The intellectual property for the design is still the architect’s because it only
8. When was P.D. 1096 signed into law? becomes the owner’s AFTER the project is built.
FEBRUARY 19, 1977 c. The intellectual property for the design remains the same because the
construction of the project is irrelevant to intellectual property.
9. A legal tie or relation itself that exists after a contract has been entered into.
5. Any room meeting the requirements of the Code for sleeping, living, cooking,
OBLIGATION or dining purposes.
10. This article of the Civil Code speaks about the 15 years civil liability of the HABITABLE ROOM
architect who drew up the plans and specifications for a building.
6. In which fire zones can Type 3 constructions be built?
ART./ ARTICLE 1723
NON-FIRE RESTRICTED & FIRE RESTRICTIVE ZONES
ARCHITECTURAL DEFICIENCY
8. The length of time a material can withstand being burned which may be one- SECTION 13
hour, two-hours, four-hours, etc.
8. It may be distributed to the successful examinees during their mass oath
FIRE-RESISTIVE TIME PERIOD RATING taking as new registered and licensed architects.
9. It creates the obligation to return the things which were the object of the REPORT OF RATING
contract, together with their fruits, and the price with its interest.
9. Which of the following requires a building permit?
RESCISSION
a. Garden pools 500mm deep or shallower
10. Contracts where the consent is vitiated by mistake, violence, intimidation,
undue influence, or fraud can be considered as? b. Repairs of doors, floors, windows, or fences
1. If, for any reason, any section or provision of the IRR of R.A. 9266 is C. REPAIRS OF LOAD-BEARING PARTITION WALLS
declared unconstitutional or invalid, the remainder of this IRR shall not be
10. Agencies, organizations or individuals whether public or private, who secure
affected by such declaration. This statement speak about Section 45,
the services of a foreign professional authorized by law to practice in the
___________________________.
Philippines, shall be responsible for securing a special permit from which
SEPARABILITY CLAUSE government entities?
2. When was “An Act to Ordain and Institute a National Building Code of the PRC and DOLE
Philippines” enacted by the Senate and House of Representatives of the
11. Within ______ years from the effectivity of R.A. No. 9266, all proposed
Philippine Congress?
positions in the local government, whether career, permanent, temporary or
AUGUST 26, 1972 contractual and primarily requiring the services of an architect shall be filled
only by registered and licensed architects.
3. According to Article 1723 of the Civil Code, who shall be held liable if a
building collapses more than 10 years after completion due to the use of 3 YEARS
inferior materials?
12. The Building Code requires that the owner hire a full-time inspector for the
The Contractor and the Construction Supervisor/ Engineer or Architect who construction. This inspector must be a:
supervise the construction.
LICENSED ARCHITECT AND CIVIL ENGINEER
4. When the building collapses, the building owner has a maximum of how
13. How much is the fine for excavations left open without any work being done
many years from the date of the collapse to initiate legal action seeking
on the site for more than 120 days?
damages?
P10,000.00
10 YEARS
14. The following types of construction are allowed in the fire-restrictive zones.
5. R.A 8981 is also known as the?
TYPES II, III AND IV CONSTRUCTIONS
PRC MODERNIZATION ACT OF 2000
15. Pursuant to __________________________, the United Architects of the
6. This implies that the building official is responding to complaints/ grievances
Philippines, Inc.is the existing integrated and accredited professional
raised by individuals or entities regarding specific aspects of a building,
organization of registered architects.
construction project, or related activities.
BOARD RESOLUTION NO. 3, SERIES OF 2004
ACTS ON CLAIMS