Professional Documents
Culture Documents
BioDiversity Management Plan
BioDiversity Management Plan
Department of Roads
Development Cooperation Implementation Division
Kathmandu, Nepal
Contractor Employer:
Sharma-Longjian JV Department of Roads
R K Complex, Sitapaila Development Cooperation Implementation
Phone: 977-1-4673001, 4673002 Division, Strategic Road Connectivity and Trade
Improvement Project
Construction Stage
Local Preservation of topsoil and
communities rehabilitation after construction;
Land use change
Biodiversity re-plantation, selected
and
(threat of invasive Along BGC construction time to avoid severe
loss of productive
plant impact on agriculture.
topsoil
species Improvement of land use and top
exposure) soil
Instructions and orientation to
workers;
Enforcement and control of Anti-
Wildlife Local Around camp-
Disturbance and poaching regulations;
communities sites
poaching wildlife Awareness campaigns; Planning of
rural development
Proper camp waste (Solid and
Effluent) management
Small vertebrates Established speed limitation signs
(snakes, lizards, in appropriate locations;
Forest areas
Impact on wildlife amphibians) awareness to the drivers. Boards
(large forest
Movement Monkeys and information with including animals
patches)
other road- sign will be placed.
attracted animals
Require compliance with WBG
guidance on Worker
Accommodations for contracted
workers.
Compliance with national and
international Labor regulations and
WB guidance on Worker.
Construction and
Accommodations for contracted
Labor campsites
workers.
Local and outside Construction
Labor Management Procedure
Working conditions employees sites
(LMP).
Work force
Established complaint mechanisms
Local
(GRM)
communities
Provide workers transportation to
and from the project sites.
Implement -Zero harm policy at
the project sites.
Adopt safety measures for workers
like shinning jackets (aprons), boots,
gloves, helmets etc.
Impact on tangible Local Assessment of ESS-8 during field
and communities studies confirmed that no tangible/
Generic risks and Sensitive Location Mitigation measures for generic
Impacts receptors (Chainage) risks and impacts
intangible archeologically
important heritage will be
Indigenous
intangible heritage impacted. In case of chance
communities
finding, the procedure will be
followed.
Vigilance from law
enforcement authorities and
compliance with the Labor
laws.
Construction and Display of hoarding boards
Campsites
Labor campsites about anti-trafficking
and
Local and outside Communities orientation
construction
employees focusing young women and
Human Trafficking sites
Labor force, girls.
Settlements of
mostly female Establish Worker Camp
local
workers Local Operations Guidelines
communities
communities Worker Code of Conduct to
avoid issues of GBV Action
Plan
Establish compliant
mechanisms.
Develop a Hazardous Materials
Flora and Fauna
Management Plan to manage
Potential hazards Local
Along BGC hazardous material use, storage,
caused by bitumen communities
Construction transport, and disposal.
and Workers and
sites and Handling chemicals properly.
other toxic campsites
camps Storage of chemicals 100 meters
chemicals Travelling
away from any water sources.
passengers
Communities Local Labor camps Communities awareness and
Exposure communities, Construction sensitization with emphasis
to Health Issues especially sites on women and young girls.
and women Major market Promote health-seeking
Labor Influx: Labor force places Major behaviors.
settlements Identify areas along the
access road prone to
landslides and provide
appropriate engineering
controls.
Adopt a Worker Code of
Conduct that establishes how
workers should interact with
local communities.
Adopt a Grievance
Mechanism to allow local
Generic risks and Sensitive Location Mitigation measures for generic
Impacts receptors (Chainage) risks and impacts
residents to file complaints.
Strengthening and
collaboration with the local
health facility and onsite
primary health care facility or
surveillances
Waste management plan.
Local
communities and Fuel-efficient machinery
Greenhouse
biodiversity Carbon offset by planting trees
Gas(GHG) Along BGC
Passengers and Prevent activities that increase
Emission
other road users GHG emissions
Road officials
Local Develop chemical management
communities Construction plan prior to construction including
Hazardous
Biological sites, storage handling and disposal of
Materials
environment yards hazardous chemical and waste
Operation Stage
Instructions for workers, control by
Wildlife
mangers, awareness and
Local
distributed printed materials about
communities
Disturbance and rules and regulations.
Animals, Around BGC
poaching wildlife Enforcement and control; Anti-
attracted to roads
poaching regulations; Awareness
(monkeys, Cats,
campaigns; Planning of rural
mongoose, etc.)
development
Greenhouse Gas Local Along NM Recommendations for fuel
(GHG) Emission communities and efficient machinery
Generic risks and Sensitive Location Mitigation measures for generic
Impacts receptors (Chainage) risks and impacts
biodiversity
Carbon offset by planting trees
Passengers and
Prevent activities that enhance
other road users
GHG emissions
Road officials
DoR,
Develo
pment
Cooper
ation
Implem
entatio
n Resettlem
Loss of
Divisio ent
vegetatio
Compensat ns Action
Land and n Once in
ion Physical (DCID), Plan;
1 vegetation and Site visit every 6
- Plant of Environment Constr Forest
clearance physical month
nurseries uction clearance
structure
Supervi certificate.
s
sion
Consult
ant
(CSC),
GESU-
DoR
Plan of
access to
existing
Constru
Plan for link
ction
Likely providing DoR, roads and Every
Survey
Review of affected access to Pre- DCID, adjacent month
and
2 access during locals and construction CSC,G settlement after
review
Roads constructi IBGCediat Phase ESU- s award of
of ESIA
on e impact DoR mentioned contract
and
receptors. in
RAP.
bidding
Document
.
- Selection
-Health
of sites DoR,
issue Grievance
Waste -Instruction DCID,
-Pollution Construction Field s from the
3 Manageme of CSC, Monthly
- Contractor visit local
nt Labors GESU-
Aesthetic people.
-Managers DoR
s
training
Health and
sanitation Visit
facilities, propose Review
drinking DoR, d ESMP
Establishm Generati
water DCID, camp and camp
ent of on of Construction Every
4 facilities, CSC,G sites, managem
camps Solid contractor month
availability ESU- observat ent
Waste
of first aid DoR ion and plan of
kit, Fire photogra contractor
Contract
or‘s
Direct constructi
Dispo Erosion on
sal, DoR
affect shall be methodol
,
Identified , loss stabilized Con ogy for
of life DCI
vulnerable by applying struc the Plan for
Erosion and D, Every
5 areas and engineering tion excavatio erosion
control prope CSC month
new rty, as well as contr n control
,GE
adjac bioengineer actor for
ent SU-
ing opening
farmla DoR
nd as techniques new
well proposed
as alignmen
cloggi
ng ts
drain
and
cross-
draina
ge
Manag
ement
of
traffic
along
the
existin
g
highwa
y will
be
most
challen Traffic
Review
ging DoR manag
of
task , ement
Traffic
during Con DCI plan
Along the manage
Traffic the struc D, prepare
existing ment Every
6 Manage time of tion CSC d by
roads and plan of month
ment wideni contr , constru
highway constructi
ng of actor GES ction
on
road U- contract
contracto
width DoR or in
r
and place
excava
tion.
Traffic
manag
ement
plan
prepar
ed
prior to
the
constru