ART 02 NEW SINK

BST 01
NON-CLUB ARTWORK (W540MM X H170MM X D370)
BST 01 BEDSIDE TABLE 01
PANEL AT BEDHEAD
TO MAKE GOOD & REUSE BEDSIDE TABLE 01 (DETAIL AS PER
BATHROOM VANITY COUNTER
SUITABLE EXISTING (DETAIL AS PER HOLLYWOOD CONSTRUCTION'S
(DETAIL AS PER CONSTRUCTION'S
WALL MIRROR CONSTRUCTION'S TWIN BED SET DETAIL DRAWINGS CDD-01)
DETAIL DRAWINGS CDD-09)
DETAIL DRAWINGS (DETAIL AS PER
SC 01 CONSTRUCTION'S WS 01
CDD-01)
STUDY CHAIR DETAIL DRAWINGS WALL SCONE @ NEW WALL MOUNTED
TL 01 CDD-08) BEDSIDE SWIVEL MIRROR
DL 01 EXISTING TABLE LAMP FA 05 NEW SHOWER SYSTEM SET
MINI FRIDGE @ BEDSIDE BEDHEAD
DESK LAMP

SH 02 01 OR SH 03
NON CLUB
GUESTROOM SHEERS
FL 01
SH 01 PORCELAIN TILE
GUESTROOMS NEW TOWEL RACK
BLACK OUT
DRAPERY
VN 01
SD 02
VINYL FLOORING IN
STUDY DESK 02-1600 TRAVERTINE LOOK FINISH NEW TOILET BOWL WITH
(DETAIL AS PER CONSTRUCTION'S (NON-MOTORIZED)
DETAIL DRAWINGS CDD-02) BIDET SEAT

FS 01
FOOT STOOL 01 NEW BATHROBE HOOK
PL 03
THROW PILLOW GREY

LC 01
LOUNGE CHAIR 01

PL 02
THROW PILLOW
MAGENTA_NON CLUB

STANDING 50" TV WARDROBE WITH DRINKING


SL 01 ST 01 WATER DISPENSER
SIDE TABLE 01 LS 01 (DETAIL AS PER
STANDING LAMP CS 01
(DETAIL AS PER LUGGAGE STAND TO MAKE GOOD & REUSE CONSTRUCTION'S DETAIL
TV CONSOLE 01 SUITABLE EXISTING
CONSTRUCTION'S DRAWINGS
DETAIL DRAWINGS FULL HEIGHT MIRROR CDD-12)
CDD-20)

GENERAL PLAN
1 SCALE 1 : 50

SUPERIOR HOLLYWOOD TWIN ROOM


(GUESTROOM 1301)

INTERIOR DESIGNER: PROJECT: OPERATOR: CLIENT: REMARKS: SCALE : 1:50 (A3 Paper) ISSUE STATUS :
*ALL CONTENTS FOUND IN THIS DOCUMENT ARE FULL RIGHTS RESERVED BY STATED CLIENT*

PROPOSED REFURBISHMENT WORKS TO GRAND


COPTHORNE
WATERFRONT
HOTEL GRAND
COPTHORNE
WATERFRONT
HOTEL
GUESTROOMS, CLUB LOUNGE, CORRIDORS & LIFT
DIMENSIONS:
CONTRACTORS ARE RESPONSIBLE FOR ALL VERIFICATIONS OF DIMENSIONS ONSITE, DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO
DRAWN BY : SITI NURHIDAYATI REVISION : 00 ü
BEFORE PROCEEDING OF ANY WORKS.
LOBBY FROM LEVELS 7 TO 30 AT GRAND COPTHORNE MATERIALS & FINISHES:
ACCEPTED BY : 01 ü
WATERFRONT HOTEL SINGAPORE CONTRACTORS ARE RESPONSIBLE TO CROSS REFERENCE WITH THE MASTER FFE & MATERIALS SPECIFICATIONS DOCUMENT FOR ACCURACY
AND REQUIREMENTS.

PLEASE CLARIFY ANY QUERIES WITH RELEVANT PERSONS-IN-CHARGE.


DATE : 02 ü
DUE DILIGENCE: DRAW
N
IG
NUMB
R
ER
/EF:
CONTRACTORS ARE TO EXERCISE DUE DILLIGENCE TO SURVEY SITE CONDITIONS BEFORE IMPLEMENTING ANY INSTALLATIONS OR FABRICATION
WORKS TO AVOID IMPLICATED ISSUES FROM ARISING, ANY ALTERATIONS OR ADDITIONS TO ORIGINAL PROPOSAL SHOULD BE CROSS CHECKED
WITH RELEVANT CONSULTANTS BEFORE PROCEEDING. CONTRACTORS ARE TO CROSS REFERENCE ALL DETAILS & DIMENSIONS WITH EXISTING
MOCK UP ROOM FOR ACCURACY.
01-GCW-GR-SHT-1001