BESCOM for Line Clear proposal for the month of September -2023

Name of the Name of the Duration of LC request


Date on which last LC was Load Affected
Sl No BESCOM BESCOM Sub Division O&M Name of the station/Line Feeder Date Time Reason for availing LC Areas Affected
approved (MW)
Circle Division From To From To Duration

F18- Igoor , igoor


1 Davanagere DAVANAGERE RSD UNIT-2 AVARAGERE-66 9/23/2023 9/23/2023 10:00 16:00 6:00 Perdoical Maintenance work 29.09.2023 1.6MW
RAMPURA golarahatti ,lingadahalli,Oddinahalli

Kadajji, Nagarakatte, Rampura,


Pyarappana camp, Basavanal, Basavanal-
2 Davanagere DAVANAGERE RSD ELEBETHUR KADAJJI_66 F04-SRIRAM 9/23/2023 9/23/2023 10:00 16:00 6:00 Perdoical Maintenance work 29.09.2023 0.9MW
Gollarahatti, Bethur, Bethur Camp,
Putuganal, Putuganal Camp

F08 CHALLAKERE ROAD


CHITRADURG
3 Davanagere CSD O&M-1 CHITRADURGA_220 INDUSTRIAL 9/23/2023 9/23/2023 10:00 16:00 6:00 MAINTAINANCE WORK 29.09.2023 SURROUNDING, INDUSTRIAL AREA 0.8
A
AREA SURROUNGS

KAMANABAVI BADAVANE,
CHITRADURG
4 Davanagere CSD O&M-1 CHITRADURGA_220 F09 KOTE 9/23/2023 9/23/2023 10:00 16:00 6:00 MAINTAINANCE WORK 29.08.2023 JOGIMATTI ROAD, KOTE ROAD 1.2
A
SURROUNDINGS

ZP OFFICE SURROUNDING AREAS,


CHITRADURG
5 Davanagere CSD O&M-1 CHITRADURGA_220 F10 ZP 9/23/2023 9/23/2023 10:00 16:00 6:00 MAINTAINANCE WORK 29.08.2023 TEACHERS COLONY, IUDP 2.1
A
LAYOUT AREA

DS HALLI, KUNCHIGNAHALL,
CHITRADURG F01 COPPER INGALDHALL, INGALADHAL
6 Davanagere CSD O&M-3 CHITRADURGA_220 9/23/2023 9/23/2023 10:00 16:00 6:00 MAINTAINANCE WORK 29.08.2023 1.1
A MINES LAMBANI HATTI, KENNEDELAU &
SURROUNDING AREAS

F2- Vedavathi
CHITRADURG HOLALKER SHIVAGANG water supply, CHITRALLI MUSS TO B G HALLI, THODRANAL, T
1 Davanagere CHITRALLI F3-B G HALLI
F3- kappagere, 9/23/2023 9/25/2023 10:00 16:00 6:00 29.08.2023 3.0 MW
A E A GALIMARAMMA TEMPLE NULENUR
F12-
Rangavvanahall
i, F-15
Kobbaripete,
F18- Attigatta Hosadurga Town, Kellodu Panchayath,
NJY,F-11 Road Widening and undergound Hunavinodu Panchayath,Madure
2 Davanagere Chitradurga Hosadurga O& M-1 Hosadurga 66/11 KV 9/23/2023 9/23/2023 9:00 16:00 7:00 29.08.2023 6MW
KelloduF6- drainage plant electrification Panchayath, Kanguvalli Panchayath all
Koratigere, F7- villages
Madure, F10-
Kanguvalli,
F13-Peelapura,
F14-Devigere, Kuntegowdanahally, Yaladabagi,
BRAMHASA 66/11 KV F16-BF03-
V Nagara
3 Tumkur MADHUGIRI SIRA RSD 9/23/2023 9/30/2023 10:00 17:00 7:00 R&M Work - Havinahalu, Kataveeranahally, -
NDRA BRAMHASANDRA YALDABAGI
and F17- Navaneboranahlly.
Mavinakatte,

F07- Ajjaiahnapalya, LH palya, Borasandra,


BRAMHASA 66/11 KV
4 Tumkur MADHUGIRI SIRA RSD AMALAGOND 9/23/2023 9/30/2023 10:00 17:00 7:00 R&M Work - Thippanahally, -
NDRA BRAMHASANDRA
I Byadarahally.Navaneboranahally.
DASARAHALLI, VENKATAPURA,
SALUPARAHALLI,
SEEBIAGRAHARA, DODDASEEBI,
DURGADAHALLI,
F09- NAVANEBORANAHALLI,
BRAMHASA 66/11 KV
5 Tumkur MADHUGIRI SIRA RSD KALLASHETT 9/23/2023 9/30/2023 10:00 17:00 7:00 R&M Work - THIPPANAHALLI, BORASANDRA, -
NDRA BRAMHASANDRA
IHALLI KALLASHETTIHALLI,
YATHTHAPPANAHATTI,
KALAJJIROPPA,SIBAIANAPALYA,
BASARIHALLI, HUNJANAL,
BYADARAHALLI
F18-
RAJAJINAGAR OH to UG
6 West N2 5 NRS_220 VIJAYANAGR 9/23/2023 9/23/2023 10:30 17:30 7:00 - MC layout, Industrial area -
A (Releasing OH)
-TELE-EXCH.
Wheather
alteranate
Power Supply Remarks
Arranged or
not

- -

- -

- -

- -

- -

- -

NOT -

- -

- -

- -

- -

- -