Number INC8180068

State Closed
Configuration item E2E Planning FuturMaster
Short description [RC FM UKI/EU] ISD - No orders proposed to Primeline from IC14683IE
Client Cooper, Laura

Analysis FM Vendor provided Functional knowledge on calendar usage.

Number INC8104199
State Closed
Configuration E2E Planning FuturMaster
item
Short description [RC FM DAC/EU] ISD - Discrepancy between DP (archive) and SP (same as closed ticket INC7836280)
Client Giraudon, Elsa
Analysis FM Vendor explained to Elsa that if the SKU is inactive it will be excluded in the BOS building.
> the demand cannot be integrated from DP
> no demand and no BOS link : the node is cleaned.
Number INC8170107
State Closed
Configuration E2E Planning FuturMaster
item
Short [RC FM ESE/EU] ISD - After exporting the Status is SUBMITTED for some rows but still TO BE SUBMITTED
description for some others ?
Client Giraudon, Elsa
Analysis Functional explanation was provided to Elsa
Number INC8167306
State Closed
Configuration item E2E Planning FuturMaster
Short description [RC FM ITA/EU] ISD - Alert when split from Customer to Locations is not equal
Client Guinderi, Simone
Analysis FM vendor provided functional explanation for the alert when split from Customer to Locations

Number INC8145969
State Closed
Configuration E2E Planning FuturMaster
item
Short [RC FM ISRAEL/E&S] ISD - Instead of 5 orders, 12 orders were created for ISR
description
Client Kose, Naz
Analysis FM provided Functional explanation and weekly treatment was rerun as requested.
Number INC8177851
State Closed
Configuration E2E Planning FuturMaster
item
Short [RC FM JAPAN/APAC] ISD - TO volume is not considered in PO volume
description
Client Rusetckaia, Polina
Analysis FM team provided functional knowledge on Demand Calculation.
Number INC8176874
State Closed
Configuration E2E Planning FuturMaster
item
Short [RC FM JAPAN/APAC] ISD - Low Production plan
description
Client Rusetckaia, Polina
Analysis FM Vendor provided functional explanation for the calculation of TO.
Number INC8309584
State Closed
Configuration E2E Planning FuturMaster
item
Short [RC FM ANZ/APAC] ISD - Planned In-Transit report does not include nodes without scheduled reciepts
description
Client Rusetckaia, Polina
Analysis FM Vendor explained the design of the template to Polina

Number INC8160169
State Closed
Configuration E2E Planning FuturMaster
item
Short [RC FM US/Canada/NA] ISS - Infeasibility detected in V4 Weekly Treatment Optimization Calculation -
description Last week's prebuilds have also disappeared
Client Zielonko, Quinn
Analysis FM Vendor explained where prebuild should be enter and why there is infeasibility