MAYOR METRADO Tunel
MAYOR METRADO Tunel
INICIO FINAL ROCA ROCA IV A ROCA IV B,V ROCA IV A ROCA IV B,V ROCA IV A ROCA IV B,V ROCA IV A ROCA IV B,V
19+940.00 19+948.00 V 281.70 324.23 5.02 42.53
19+948.00 20+068.00 IV-B 3,512.11 4,630.26 417.50 1,118.15
20+068.00 20+292.00 IV-A 7,620.70 9,697.10 0.00 2,076.40 0.00
20+292.00 20+382.00 IV-B 2,914.95 3,929.78 2,782.17 1,014.83
20+382.00 20+412.00 V 1,112.48 1,358.49 1,358.49 246.02
20+412.00 20+524.00 IV-B 3,420.42 4,730.98 4,730.98 1,310.56
20+524.00 20+552.00 V 962.00 1,213.91 1,213.91 251.91
20+552.00 20+578.00 IV-B 815.33 1,065.51 1,065.51 250.19
20+578.00 20+672.00 V 3,318.82 4,127.83 4,127.83 809.01
20+672.00 20+789.30 IV-B 3,737.77 4,866.97 4,866.97 1,129.20
20+789.30 20+794.00 V 194.75 248.07 248.07 53.32
20+794.00 20+842.00 IV-B 1,459.90 1,955.33 1,955.34 495.43
20+842.00 20+850.00 V 271.38 349.17 349.18 77.79
20+850.00 20+872.00 IV-B 662.96 972.75 780.65 309.79
20+872.00 20+908.00 V 1,374.91 1,583.23 109.71 208.32
7,620.70 24,039.48 9,697.10 31,356.51 0.00 24,011.31 2,076.40 7,317.03