R5.MEKA Process A To Z
R5.MEKA Process A To Z
R5.MEKA Process A To Z
BUILDING MODULAR
WITH SUPERIOR
QUALITY
T
.18003776070
F
.18003776070
E.i
nfo@mekamodul
ar.
com
PAGEI
NDEX
MEKA3-
STEPPROCESS
STEP1:A.
PROJECTVERI
FICATI
ON
STEP1:B.
PERMI
TSANDENGI
NEERI
NG
STEP2:FABRI
CATI
ON
STEP3:DELI
VER&I
NSTALL
PROJECTVERI
FICATI
ONSAMPLE
STEP1 STEP2 STEP3
PROJECTVERI
FICATI
ON,DESI
GN, FABRI
CATI
ON DELI
VER&I
NSTALL
PERMI
TS&ENGI NEERI
NG
STEP1:
PROJECTVERI
FICATI
ON
PROJECTVERI
FICATI
ON:ONETI
MEFEE,NO CONTACT
1PICKMODEL
3 WEDO PROJECTVERI
FORYOU
FICATI
ON
SI
TEPLAN
NAPA600 VOR640 CHECKSETBACKS,CODEANAL
YSI
S,LOOKFORSERVI
CES
FLOORPLAN
ADJUSTPLANFORYOURNEEDSI
FNEEDEDORDESI
GNA
NEW ONE.
ELEVATI
ON
CLADDI
NGANDWI
NDOW LOCATI
ONS.
ALLCOSTESTI
MATES
PRICEOUTTHEMODULESDELI
VEREDTO SI
TE
CRANECOST
SEEALLMODELS
SI
TEIMPROVEMENTSSUCHASFOUNDATI
ON
SEESAMPLEPV
ZI
ON1280
CUSTOM MODEL
STEP1:
B.PERMI
TSANDENGI
NEERI
NG
PERMI
TSANDENGI
NEERI
NG
● CONTRACTREQUI
RED
● FULLDESI
GNFORPERMI
TS
● FOUNDATI
ONDESI
GNANDENGI
NEERI
NG
● MEP
● MECHANI CAL
● ELECTRICAL
● PLUMBING
● THI
RDPARTYSTATE/
PLANTI
NSPECTI
ONDOCUMENTS
PERMI
TS&ENGI
NEERI
NG ● FI
LEFORPERMI
T
STEP2:
FABRI
CATI
ON
PERMI
TISSUEDBYGOVERNMENT
● FABRI
CATI
ONANDG/
CAGREEMENTREQUI
RED
● MODULARFABRI
CATI
ONSCHEDULE
50% DEPOSI
T
25% PROGRESS
25% UPONLEAVI
NG PLANT
WEDELI
VERTO SI
TE
FABRI
CATI
ON
• G/C COMES TO THE SITE WHILE THE BUILDING IS
FABRIC ATED AT THE PLANT
---�
�' • CR ANE INSTALL ATION: 1-2 DAYS
MEKA MODULAR
PROJECT VERIFICATION
3491 E. CURRY STREET., LONG BEACH CA
1280 SQFT
ZION 1280
JUNE28,2021
SAMPLE PV
SHEET CONTENT
PROJECT
3491E.CURRYST.,LONGBEACH,CALIFORNIA
PV NO. DATE
SHEET NO.
56'
7'-10" 8' 7'-6" 12'-8" 8'-4" 11'-8" SAMPLE PV
FRIDGE
6'-11"
LAUNDRY
BED1
BATH/WIC BATH/WIC
MASTERBED
16'
KITCHEN POWDERRM
5'-4"
MINIBAR
40'
DECK
8'
27'-9"
LIVING/DINING
16'
16' 8' 32'
56'
FINISH FLOOR
0'-0" AFF
EAST ELEVATION
TOP
9'-6" AFF
MIN. CEILING HEIGHT
8'-0" AFF
FINISH FLOOR
0'-0" AFF
WEST ELEVATION
TOP
9'-6" AFF
MIN. CEILING HEIGHT
8'-0" AFF
FINISH FLOOR
0'-0" AFF
NORTH ELEVATION
TOP
9'-6" AFF SHEET CONTENT
MIN. CEILING HEIGHT ELEVATIONS
8'-0" AFF
PROJECT
3491E.CURRYST.,LONGBEACH,CALIFORNIA
PV NO. DATE
FINISH FLOOR
0'-0" AFF
SHEET NO.
SOUTH ELEVATION
SAMPLE PV
SHEET CONTENT
PERSPECTIVES
PROJECT
3491E.CURRYST.,LONGBEACH,CALIFORNIA
PV NO. DATE
SHEET NO.
PROJECT BUDGET
PROJECT # PV23
CLIENT UNIT TYPE Zion 1280
ADDRESS NUMB. OF MODULES
CITY ST ZIP TOTAL S.F.
LENDER LEVELS
LOT TYPE MODEL COST
LOT SIZE (SqFt) PROJECT ESTIMATE
Notes
Site Prep and Foundation This includes all costs for creating stem wall foundation for Meka Model
Installation Cost to install Meka Model on top of the foundation and connect to utilities
Electrical Cost includes upgraded electrical panel and power distribution toMeka Model
Assumes 100 ft to connection point
Sewer Cost to trench and connect new sewer to sewer lateral for Meka Model
Assumes 100 ft to connection point
Water Cost to trench and connect water from main residence to Meka
Assumes 100 ft to connection point
Craning Cost to crane/set Meka model onto foundation
Add-ons
Solar
Landscaping
Carport
Decking
Not included Permits, Civil engineering, soils reports, survey, etc. or unforeseen site challenges
To Finalize Estimates Final construction numbers to be provided after approved Construction Drawings.