We have executed different asphalt mix design due to material property changed.
Sieve Upper Lower %Pass Mid. Upper Lower Lower. Upper Power
Size Limit Limit Point tolerance tolerance Band Band curve
26.50 100.0 100.0 100.0 100.0 -5.00 5.00 100.00 100.00 100.00
19.00 85.0 100.0 100.0 92.5 -5.00 5.00 100.00 95.00 86.10
13.20 71.0 84.0 82.0 77.5 -4.00 4.00 84.00 78.00 73.08
9.50 62.0 76.0 71.9 69.0 -4.00 4.00 75.90 67.90 63.03
4.75 42.0 60.0 59.0 51.0 -4.00 4.00 60.00 55.00 46.14
2.36 30.0 48.0 41.5 39.0 -4.00 4.00 45.50 37.50 33.68
1.18 22.0 38.0 29.1 30.0 -3.00 3.00 32.10 26.10 24.65
0.60 16.0 28.0 19.6 22.0 -2.00 2.00 21.60 17.60 18.18
0.30 12.0 20.0 12.7 16.0 -1.00 1.00 13.70 11.70 13.31
4.0
4.8
5.2
5.6
4.4
Range
VFA 4.8--5.2
VMA
Flow
Stability
Acceptable Range
**Therefore Acceptable Asphalt Limit can be Min. 4.7 and Max. 5.3**
**Selected optimum bitumen content is 5.0 %**
Legend
6- 10- 14-
0-6mm 10mm 14mm 20mm
1 Bulk Specific 2.890 2.859 2.847 2.868 2.866 AASHTO T
Gravity (SSD) 84/85
(g/cc)
2 Water 1.80 1.57 1.48 1.38 1.558 AASHTO T <1%
Absorption (%) 84/85
3 Apparent 2.940 2.946 2.927 2.944 2.939 AASHTO T
Specific Gravity 84/85
(g/cc)
4 Bulk Specific 2.784 2.815 2.805 2.829 2.808 AASHTO T
Gravity (Oven 84/85
Dry) (g/cc)
26.50 100.0 100.0 100.0 100.0 -5.00 5.00 100.00 100.00 100.00
19.00 85.0 100.0 99.9 92.5 -5.00 5.00 100.00 94.87 86.10
13.20 71.0 84.0 82.0 77.5 -5.00 5.00 84.00 76.97 73.08
9.50 62.0 76.0 72.5 69.0 -5.00 5.00 77.48 67.48 63.03
4.75 42.0 60.0 53.7 51.0 -4.00 4.00 60.00 49.68 46.14
2.36 30.0 48.0 40.5 39.0 -4.00 4.00 44.49 36.49 33.68
1.18 22.0 38.0 31.0 30.0 -4.00 4.00 35.00 27.00 24.65
0.60 16.0 28.0 20.6 22.0 -4.00 4.00 24.61 16.61 18.18
0.30 12.0 20.0 13.5 16.0 -3.00 3.00 16.48 12.00 13.31
0.15 8.0 15.0 9.6 11.5 -2.00 2.00 11.58 8.00 9.74
0.075 4.0 10.0 6.2 7.0 -1.00 1.00 7.24 5.24 7.13
4.6
4.8
5.0
5.2
4.0
4.4
Range
VFA 4.2-4.4
VM A
Flow
Stability
Acceptable Range
**Therefore Acceptable Asphalt Limit can be Min. 4.3 and Max. 4.9**
**Selected optimum bitumen content is 4.6 %**
Legend
26.50 100.0 100.0 100.0 100.0 -5.00 5.00 100.00 100.00 100.00
19.00 85.0 100.0 99.9 92.5 -5.00 5.00 100.00 94.86 86.10
13.20 71.0 84.0 82.0 77.5 -5.00 5.00 84.00 77.01 73.08
9.50 62.0 76.0 72.3 69.0 -5.00 5.00 76.00 67.29 63.03
4.75 42.0 60.0 54.0 51.0 -4.00 4.00 58.00 50.02 46.14
2.36 30.0 48.0 40.9 39.0 -4.00 4.00 44.92 36.92 33.68
1.18 22.0 38.0 31.5 30.0 -4.00 4.00 35.55 27.55 24.65
0.60 16.0 28.0 21.2 22.0 -4.00 4.00 25.19 17.19 18.18
0.30 12.0 20.0 14.2 16.0 -3.00 3.00 17.16 12.00 13.31
0.15 8.0 15.0 10.5 11.5 -2.00 2.00 12.54 8.00 9.74
0.075 4.0 10.0 8.1 7.0 -1.00 1.00 9.09 7.09 7.13
4.6
4.9
5.2
Range
VFA
VMA
Flow
Air Voids
Stability
Acceptable Range
**Therefore Acceptable Asphalt Limit can be Min. 4.4 and Max. 5.0**
**Selected optimum bitumen content is 4.7 %**
Legend
26.50 100.0 100.0 100.0 100.0 -5.00 5.00 100.00 100.00 100.00
19.00 85.0 100.0 99.9 92.5 -5.00 5.00 100.00 94.86 86.10
13.20 71.0 84.0 82.0 77.5 -5.00 5.00 84.00 77.01 73.08
9.50 62.0 76.0 72.3 69.0 -5.00 5.00 76.00 67.29 63.03
4.75 42.0 60.0 54.0 51.0 -4.00 4.00 58.00 50.02 46.14
2.36 30.0 48.0 40.9 39.0 -4.00 4.00 44.92 36.92 33.68
1.18 22.0 38.0 31.5 30.0 -4.00 4.00 35.55 27.55 24.65
0.60 16.0 28.0 21.2 22.0 -4.00 4.00 25.19 17.19 18.18
0.30 12.0 20.0 14.2 16.0 -3.00 3.00 17.16 12.00 13.31
0.15 8.0 15.0 10.5 11.5 -2.00 2.00 12.54 8.00 9.74
0.075 4.0 10.0 8.1 7.0 -1.00 1.00 9.09 7.09 7.13
4.6
4.9
5.2
Range
VFA
VMA
Flow
Air Voids
Stability
Acceptable Range
**Therefore Acceptable Asphalt Limit can be Min. 4.4 and Max. 5.0**
**Selected optimum bitumen content is 4.7 %**
Legend
Sieve Upper Lower %Pass Mid. Upper Lower Lower. Upper Power
Size Limit Limit Point tolerance tolerance Band Band curve
% Asphalt Unit Weight T/m3 Air Void Stablity Flow VMA VFA
4.8
5.0
5.2
4.6
5.4
5.6
VFA
VMA
Flow
Air Voids
Stability
Acceptable Range
**Therefore Acceptable Asphalt Limit can be Min. 4.7 and Max. 5.3**
Legend
Table 4.6; Optimum asphalt content selection process for Mix Design