Providing and applying three layer external polyethylene coating of minimum 3000
micron composite coating according to the standards DIN 30670, CSA Z245.21 and ISO 21809-1
and internal Solventless Liquid Epoxy of minimum 400 micron confirming to IS 16676-2017 for
underground or above ground.
Rate shall include cost of all materials, coating and wrapping over the pipes, handling
charges, preparation of pipe surface, all labour, material, including scrapping the pipe surface
with sand or metal blasting, degracing, cleaning by compressed air and surface grinding and
finishing including cost of loading, unloading and handling of pipe at factory etc. complete as
directed by Engineer-in-Charge.
General:
Manufacturing, providing and supplying spirally welded/ ERW/ SAW fabricated MS
pipes(Fe415) with three layer external polyethylene coating (3LPE) to mild steel pipes externally
of minimum 3000 microns and internally Solventless Liquid Epoxy of minimum 400 micron. 100
mm space shall be left uncoated(Cut back) on both ends of the mild steel pipe for welding
purpose and the same shall be coated after completion of welding at site with 100% solid, cold
applied polymeric coating.
The process of three layer external polyethylene coating of minimum 3000 micron
composite coating according to the standards DIN 30670, CSA Z245.21 and ISO 21809-1 and
internal Solventless Liquid Epoxy minimum 400 micron confirming to IS 16676-2017 at the
factory shall be got approved by the concern Chief Engineer, MIP
Detailed Specification for coating and jointing at site:
Reasonable care shall be exercised with coated pipe to ensure the integrity of the
coating prior to installation. End hooks (aluminium), brass/ padded with non metallic slings or
padded clips shall be used while loading, unloading and handling the pipes. The storage area
shall be free from rocks, stones, sticks and other protrusions and shall be well drained. 3 layer
polythelene coated pipes may be stored outside for a period of maximum 6 months only.
The 3 PE coated and Solventless Liquid Epoxy coating lined mild steel pipes are meant
for above ground and underground.
The excavated trench shall be smooth and shall offer maximum uniform support with
the pipes. It shall be free from debris, stones and clods. The rock portion shall be padded for
adequate pipe protection and contact with ditch shall be avoided during installation to
minimize damage. The damaged coating shall be repaired immediately without claiming extra.
The bedding shall be of minimum 150 mm thick good quality sand approved by the Engineer-in-
Charge. Proper soil compaction also should be done to avoid any buckling and defection of mild
steel pipes. Mild steel pipes on either side on each pipe will be internally fully coated for non
man entry diameter. It shall be ensured that after welding of external joints at site the same
shall be coated and applied with co-polymer coating as per the instructions of Engineer-in-
Charge.
The measurement shall be measured and paid on square metre basis. For the purpose
of measurements, the diameter of coated pipe shall be the external diameter of base Mild steel
pipe. The rate shall include cost of all materials, labours and machineries.
SDE
OBLIGATORY LEVELS AND REQUIREMENTS (Parameters)
DETAILS OF RCC MBRs AT VARIOUS LOCATIONS TABLE:‐ Annexure ‐ 2
VAIJPUR MBR
Sr. Location Capacity GL LSL FSL Inlet, Outlet Wash
No Overflow Out
& Bypass
In Liter Level In meter Diam in mm
1 VAIJ MBR‐1 1057000 534.00 545.00 550.00 350.00 300 250.00
2 VAIJ‐MBR‐2 493000 534.00 550.00 555.00 250.00 200 200.00
3 SIDDHAPURWADI 838000 523.00 547.00 552.00 300.00 250 200.00
MBR
4 MAKARATHPUR 828000 551.00 572.00 577.00 300.00 250 200.00
MBR
5 KHANDALA MBR ‐1 1573000 607.00 613.00 618.00 350.00 300 250.00
6 KHANDALA MBR ‐2 283000 607.00 631.00 636.00 250.00 300 200.00
7 NARALA MBR 842000 614.00 635.00 440.00 300.00 200 200.00
8 WAKALA MBR 599000 605.00 624.00 629.00 250.00 200 200.00
9 Safiyabadwadi MBR 1217000 581.00 603.00 608.00 350.00 250 250.00
Contractor No. of correction Executive Engineer
ANNEXTURE III
GANGAPUR FLOW DIAGRAM
DAIGAON MBR KHADAK NARALA MBR
EXISTING LASUR ST MBR CAP: 6.91 LL CAP: 5.40 LL
CAP: 2.15 LL GL: 527.30 M GL: 546.00 M
GL: 537.00 M STG.HT: 24.00 M STG.HT: 23.00 M
STG.HT: 20.00 M LSL: 551.30 M LSL: 569.00 M
LSL: 557.20 M FSL: 556.10 M FSL: 573.80 M
FSL: 561.00 M DI-K9
DI-K9 DI-K9 D: 250 MM
D: 300 MM D: 400 MM L: 100 M
L: 2,507 M L: 6,821 M KHADAK NARALA SUMP
DI-K9 GL: 546.00 M
D: 200 MM LSL: 542.00 M
BRANCH POINT
L: 16,541 M GL: 529.00 M SUMP &
GANGAPUR WTP PUMP HOUSE
CAP: 105 MLD DI-K9
GL: 494.00 M D: 250 MM DI-K9 DI-K9
LIP OF AERATION L: 31,640 M D: 450 MM
SUMP & PUMP HOUSE D: 250 MM
LIP: 499.00 M EXISTING PIPE LINE L: 29,327 M L: 10,719 M
LSL: 490.00 M DI-K9
D: 600 MM
L: 24,739 M LIMBE JALGAON SUMP
GL: 501.47 M
DI-K9 LSL: 497.47 M
D: 200 MM
L: 200 M
DI-K9 DI-K9
D: 350 MM GANGAPUR WTP MBR D: 450 MM
L: 14,766 M SUMP &
TO GANGAPUR WTP

L: 6,405 M CAP: 3.77 LL


GL: 494.64 M PUMP HOUSE
MS
OD: 1219 MM ( 10 MM Thick) STG.HT: 20.00 M
LSL: 514.64 M EXISTING DIWASHI MBR-1 DIWASHI MBR-2
L: 15,460 M
FSL: 519.44 M CAP: 0.7 LL CAP: 5.62 LL
GL: 585.27 M GL: 585.58 M
RANJANGAON NARHARI MBR 1 RANJANGAON NARHARI MBR 2 STG.HT: 25.00 M STG.HT: 25.00 M
MANJARI MBR CAP: 7.14 LL CAP: 5.94 LL DI-K9 LSL: 610.47 M LSL: 610.78 M
CAP: 10.84 LL GL: 525.19 M GL: 524.72 M D: 300 MM FSL: 615.27 M FSL: 615.58 M
STG.HT: 24.00 M STG.HT: 24.00 M DI-K9
GL: 497.66 M L: 200 M
LSL: 549.19 M LSL: 548.72 M D: 200 MM
STG.HT: 24.00 M
FSL: 553.99 M FSL: 553.52 M L: 17,550 M
LSL: 521.50 M
FSL: 526.30 M
DI-K9
D: 500 MM
L: 20,291 M
GAJGAON MBR
LIMBE JALGAON MBR 1 LIMBE JALGAON MBR 2 CAP: 3.33 LL FOR TENDER PURPOSE
CAP: 6.14 LL CAP: 3.15 LL GL: 509.06 M
GL: 501.47 M GL: 501.44 M STG.HT: 25.00 M
STG.HT: 19.00 M STG.HT: 19.00 M LSL: 534.26 M NAME OF THE CLIENT
LSL: 520.47 M LSL: 520.44 M FSL: 539.06 M
FSL: 525.27 M FSL: 525.24 M MAHARASHTRA JEEVAN PRADHIKARAN
(MJP)
GHANEGAON MBR
CAP: 30.29 LL
PROJECT NAME
GL: 534.51 M
STG.HT: 24.00 M
SL: 475.35 M 373 VILLAGES GANGAPUR - VAIJAPUR
LSL: 558.51 M
TOP L: 475.20 M GRID WATER SUPPLY SCHEME
APPROACH APPROACH FSL: 563.31 M
MFL: 468.20 M BRIDGE BUND
PFL: 465.10 M L: 150 M L: 400 M NAME OF DRAWING
MWL: 463.90 M
FRL: 463.16 M GANGAPUR SCHEMATIC
GL: 461.20 M FLOW DIAGRAM
MDDL: 454.72 M
CONSULTANT
RBL: 448.90 M
Tandon Urban Solutions Pvt. Ltd.
GR
OU
P
701, HARBHAJAN, CST RD,
N
BL: 441.60 M TA
N
D
O VIDYANAGARI MARG, KALINA ,
SANTACRUZ (E), MUMBAI - 400 098.
INTAKE DRAWN BY
MP
DESIGN BY
AK
CHECKED BY
PH
DRG NO DATE SCALE SHEET REV.NO.
GAN/SCMT 24-02-22 NTS 1OF1 00
Annexure No. IV
Gangapur Taluka
Sr. No. Villages Name Habitation Name
1 Agar Kanadgaon Agar Kanadgaon
2 Agar Wadgaon Agar Wadgaon
3 Akoli Wadgaon Akoli Wadgaon
4 Akoli Wadgaon Aminabad
5 Amalner Amalner
6 Ambegaon Ambegaon
7 Ambegaon Haibatpur
8 Ambegaon Khojewadi
9 Ambegaon Mustafabad
10 Ambelohal Ambelohal
11 Asegaon Asegaon
12 Asegaon Talesaman
13 Babargaon Babargaon
14 Babargaon Maujudabad
15 Babargaon Surewadi
16 Babhulgaon Babhulgaon
17 Babhulgaon Padalsa
18 Bagadi Bagadi
19 Bhagathan Agathan
20 Bhagathan Bhagathan
21 Bhagathan Chinchkheda
22 Bhalgaon Bhalgaon
23 Bhendala Antapur
24 Bhendala Bhendala
25 Bhivdhanora Bhivdhanora
26 Bhoigaon Bhoigaon
27 Bhoigaon Kobapur
28 Bhoigaon Narayanpur
29 Bolegaon Balapur
30 Bolegaon Bolegaon
31 Butte Wadgaon Butte Wadgaon
32 Dahegaon Dahegaon
33 Dahegaon Murmi
34 Dahegaon Sarangpur
35 Devli Devli
36 Devli Mahmadpur
37 Devli Manjarpur
38 Dhamori Bk. Dhamori Bk.
39 Dhamori Kh. Dhamori Kh.
40 Dhoregaon Dhoregaon
41 Dighi Dighi
Gangapur Taluka
Sr. No. Villages Name Habitation Name
42 Dighi Kalegaon
43 Dighi Nagapur
44 Dighi Narsapur
45 Dinwada Dinwada
46 Dinwada Sanav
47 Dinwada Vairagad
48 Domegaon Borgaon
49 Domegaon Domegaon
50 Dongaon Dongaon
51 Eklahera Eklahera
52 Eklahera Nandeda
53 Fatiyabad Fatiyabad
54 Fulshevra Fulshevra
55 Gajgaon Derda
56 Gajgaon Gajgaon
57 Gajgaon Khadgaon
58 Galnimb Galnimb
59 Ganeshwadi Ganeshwadi
60 Gavali Shivra Gavali Shivra
61 Gavli Dhanora Gavli Dhanora
62 Ghanegaon Ghanegaon
63 Ghanegaon Itawa
64 Ghanegaon Narayanpur Kh.
65 Ghodegaon Ghodegaon
66 Guru Dhanora Guru Dhanora
67 Guru Dhanora Murshidabad
68 Guru Dhanora Sultanpur
69 Haibatpur Haibatpur
70 Jambhala Jambhala
71 Jambhala Pekalwadi
72 Jambhala Potul
73 Jamgaon Jamgaon
74 Jikthan Jikthan
75 Jikthan Mirzapur
76 Jikthan Sultanpur
77 Jogeshwari Jogeshwari
78 Jogeshwari Kamlapur
79 Jogeshwari Naigaon
80 Jogeshwari Ramrai
81 Kaigaon Kaigaon
82 Kankori Kankori
83 Kankori Kolghar
84 Kankori Malunja Bk.
Gangapur Taluka
Sr. No. Villages Name Habitation Name
85 Kasoda Kasoda
86 Katepimpalgaon Katepimpalgaon
87 Khadak Narala Khadak Narala
88 Kinhal Derhal
89 Kinhal Kinhal
90 Kodapur Kodapur
91 Kodapur Zanzardi
92 Lakhmapur Lakhmapur
93 Lanzi Hirapur
94 Lanzi Lanzi
95 Limbe Jalgaon Abdulpur
96 Limbe Jalgaon Limbe Jalgaon
97 Limbe Jalgaon Rahimpur
98 Mahebubkheda Mahebubkheda
99 Maholi Maholi
100 Maholi Siddhapur
101 Maliwadgaon Maliwadgaon
102 Malkapur Malkapur
103 Malkapur Rajura
104 Malkapur Shirodi
105 Malunja Kh. Hadiyabad
106 Malunja Kh. Malunja Kh.
107 Malunja Kh. Sanjarpur
108 Mamadapur Mamdapur
109 Mandwa Mandwa
110 Mandwa Shivpur
111 Mandwa Tandulwadi
112 Mangegaon Deokarwadi
113 Mangegaon Mahalaxmikheda
114 Mangegaon Mangegaon
115 Mangegaon Wazar
116 Manjari Manjari
117 Mudhesh Wadgaon Alamgirpur
118 Mudhesh Wadgaon Hakikatpur
119 Mudhesh Wadgaon Mudhesh Wadgaon
120 Nandrabad Nandrabad
121 Nandrabad Shahapur Kadim
122 Narayanpur Bk. Narayanpur Bk.
123 Nawabpur Nawabpur
124 Nevargaon Nevargaon
125 Pachapirwadi Pachapirwadi
126 Pakhora Hanumantgaon
127 Pakhora Pakhora
Gangapur Taluka
Sr. No. Villages Name Habitation Name
128 Pandharohal Borodi
129 Pandharohal Pandharohal
130 Pandharohal Shankarpur
131 Pendapur Padampur
132 Pendapur Pendapur
133 Pimpalgaon Diwashi
134 Pimpalgaon Pimpalgaon
135 Pimpalwadi Pimpalwadi
136 Pimpalwadi Sayyadpur
137 Pimparkheda Mendhipur
138 Pimparkheda Pimparkheda
139 Pratappur Wadi Pratappur Wadi
140 Puri Puri
141 Raipur Raipur
142 Rajangaon Pol Apegaon
143 Rajangaon Pol Govindpur
144 Rajangaon Pol Pahadpur
145 Rajangaon Pol Rajangaon Pol
146 Rajangaon Pol Umarpur
147 Ranjangaon (s) Ranjangaon (s)
148 Ranjangaon Narhari Pimpri
149 Ranjangaon Narhari Ranjangaon Narhari
150 Sawangi Anantpur
151 Sawangi Daigaon
152 Sawangi Harsul
153 Sawangi Sawangi
154 Sawkheda Sawkheda
155 Shahapur Golegaon
156 Shahapur Palasgaon
157 Shahapur Shahapur
158 Shahapur Singpur
159 Shahapur Banjar Shahapur Banjar
160 Shankarpur Shankarpur
161 Shendurwada Shendurwada
162 Shingi Shingi
163 Shivrai Shivrai
164 Siddhanath Wadgaon Siddhanath Wadgaon
165 Sillegaon Sillegaon
166 Sindhi Sirasgaon Fatulabad
167 Sindhi Sirasgaon Sindhi Sirasgaon
168 Sirasgaon Sarifpur
169 Sirasgaon Sirasgaon
170 Siregaon Siregaon
Gangapur Taluka
Sr. No. Villages Name Habitation Name
171 Siresaigaon Gopalwadi
172 Siresaigaon Rotasthal
173 Siresaigaon Siresaigaon
174 Solegaon Solegaon
175 Sultanabad Sultanabad
176 Takli Takli
177 Takli Takliwadi
178 Talpimpri Aurangpur
179 Talpimpri Harsuli
180 Talpimpri Nagapur
181 Talpimpri Talpimpri
182 Tandulwadi Bolthan
183 Tandulwadi Tandulwadi
184 Tandulwadi Uttarwadi
185 Tembhapuri Antapur
186 Tembhapuri Chandikpur
187 Tembhapuri Tembhapuri
188 Turkabad Kharadi Turkabad Kharadi
189 Wadali Khopeshwar
190 Wadali Mendhi
191 Wadali Wadali
192 Wadgaon Bargipur
193 Wadgaon Ibrahimpur
194 Wadgaon Rampuri
195 Wadgaon Toki
196 Wadgaon Wadgaon
197 Wahegaon Wahegaon
198 Wajnapur Shekta
199 Wajnapur Wajnapur
200 Waluj Bk. Waluj Bk.
201 Waluj Bk. Waluj Kh.
202 Warkhed Warkhed
203 Warzadi Warzadi
204 Wasusaigaon Ekburji Waghalgaon
205 Wasusaigaon Shah Nawajpur
206 Wasusaigaon Wasusaigaon
207 Yesgaon Yesgaon
208 Zodegaon Khadak Waghalgaon
209 Zodegaon Zodegaon
Total
Sr. No. Panchayat Name Habitation Name
1 Agar Saigaon Agar Saigaon
2 Aghur Aghur
3 Alapurwadi Alapurwadi
4 Amanatpurwadi Amanatpurwadi
5 Anchalgaon Anchalgaon
6 Awwalgaon Awwalgaon
7 Awwalgaon Hamrapur
8 Babhulgaon Bk. Babhulgaon Bk.
9 Babhulgaon Kh. Babhulgaon Kh.
10 Babhulkheda Babhulkheda
11 Babhulkheda Khirdi Kannad
12 Babhultel Babhultel
13 Babtara Babtara
14 Bajathan Bajathan
15 Balhegaon Balhegaon
16 Ballali Sagaj Ballali Sagaj
17 Belgaon Belgaon
18 Bendawadi Bendawadi
19 Bhadali Bhadali
20 Bhaggaon Bhaggaon
21 Bhagur Bhagur
22 Bhaigaon Ganga Bhaigaon Ganga
23 Bhaigaon Vaijapur Bhaigaon Vaijapur
24 Bhalgaon Bhalgaon
25 Bhatana Bhatana
26 Bhaur Bhaur
27 Bhingi Bhingi
28 Bhivgaon Bhivgaon
29 Bhokargaon Baigaon
30 Bhokargaon Bhokargaon
31 Biloli Biloli
32 Borsar Borsar
33 Chandegaon Chandegaon
34 Chandgaon Chandgaon
35 Chenduphal Chenduphal
36 Chikatgaon Chikatgaon
37 Chinchadgaon Chinchadgaon
38 Chorwaghalgaon Chorwaghalgaon
39 Dagpimpalgaon Dagpimpalgaon
40 Dahegaon Dahegaon
41 Dahegaon Lakhmapurwadi
42 Dahegaon Rahegavhan
43 Dawala Dawala
44 Deogaon Shani Deogaon Shani
45 Dhondalgaon Dhondalgaon
46 Dongaon Dongaon
47 Ekodi Sagaj Ekodi Sagaj
48 Fakirabadwadi Fakirabadwadi
49 Gadhe Pimpalgaon Gadhe Pimpalgaon
50 Garaj Garaj
51 Ghaigaon Ghaigaon
52 Golwadi Golwadi
53 Golwadi Mirakhnagar
54 Goygaon Goygaon
55 Hadas Pimpalgaon Hadas Pimpalgaon
56 Hajipurwadi Hajipurwadi
57 Hajipurwadi Tartyachiwadi (n.v.)
58 Hanumantgaon Hanumantgaon
59 Hilalpur Hilalpur
60 Hilalpur Koradgaon
61 Hingane Kannad Hingane Kannad
62 Hingoni Hingoni
63 Jalgaon Jalgaon
64 Jambargaon Jambargaon
65 Janephal Janephal
66 Jarul Jarul
67 Jategaon Jategaon
68 Jiri Jiri
69 Jiri Manoli
70 Kanak Sagaj Kanak Sagaj
71 Kangoni Kangoni
72 Kangoni Narayanpur
73 Kapus Wadgaon Kapus Wadgaon
74 Karanjgaon Karanjgaon
75 Kavit Kheda Birola
76 Kavit Kheda Kavit Kheda
77 Khambala Khambala
78 Khambala Kiratpur
79 Khandala Khandala
80 Kharaj Kharaj
81 Kharaj Titarkheda
82 Khirdi Hargovindpur Khirdi Hargovindpur
83 Kolhi Kolhi
84 Ladgaon Ladgaon
85 Lakh Khandala Lakh Khandala
86 Lakhani Jambarkheda
87 Lakhani Lakhani
88 Lakhganga Lakhganga
89 Lasurgaon Lasurgaon
90 Loni Bk. Loni Bk.
91 Loni Kh. Loni Kh.
92 Mahalgaon Mahalgaon
93 Malegaon Kannad Malegaon Kannad
94 Malegaon Kannad Salegaon
95 Mali Ghogargaon Mali Ghogargaon
96 Mali Sagaj Mali Sagaj
97 Mandki Mandki
98 Manegaon Manegaon
99 Manoor Manoor
100 Mhaski Mhaski
101 Mhaski Siddhapurwadi
102 Nadi Nadi
103 Nagamthan Nagamthan
104 Nagina Pimpalgaon Nagina Pimpalgaon
105 Naigavhan Naigavhan
106 Naigavhan Walan
107 Nalegaon Nalegaon
108 Nandgaon Nandgaon
109 Nandur Dhok Babhulgaon Ganga
110 Nandur Dhok Nandur Dhok
111 Narala Narala
112 Nimgaon Gondgaon
113 Nimgaon Nimgaon
114 Palkhed Palkhed
115 Panghavan Panghavan
116 Panvi Bk. Panvi Bk.
117 Panvi Bk. Wakti
118 Panvi Kh. Panvi Kh.
119 Panvi Khandala Panvi Khandala
120 Parala Parala
121 Parsoda Parsoda
122 Pendephal Pendephal
123 Pimpalgaon Khandala Pimpalgaon Khandala
124 Pokhari Pokhari
125 Purangaon Purangaon
126 Raghunathpurwadi Raghunathpurwadi
127 Rahegaon Pashapur
128 Rahegaon Rahegaon
129 Rahegaon Rajura
130 Rahegaon Sonwadi
131 Rahegaon Undirwadi
132 Rotegaon Rotegaon
133 Safiyabadwadi Safiyabadwadi
134 Sakegaon Sakegaon
135 Sanjarpurwadi Sanjarpurwadi
136 Satana Satana
137 Sawandgaon Sawandgaon
138 Sawkhed Ganga Sawkhed Ganga
139 Sawkhed Khandala Sawkhed Khandala
140 Shahjatpur Shahjatpur
141 Shioor Shioor
142 Shivgaon Pathri
143 Shivgaon Shivgaon
144 Shivrai Shivrai
145 Sirasgaon Sirasgaon
146 Sudamwadi Sudamwadi
147 Surala Surala
148 Takli Sagaj Takli Sagaj
149 Talwada Talwada
150 Tembhi Kautgaon
151 Tembhi Tembhi
152 Tidhi Makarmatpur
153 Tidhi Tidhi
154 Tunki Daskul
155 Tunki Tunki
Vaijapur Rural 1 Fulewasti
Vaijapur Rural 1 Gaikwad Wasti (vaijapur Rural 1)
156 &
Vaijapur Rural 2 Galande Wasti (vaijapur Rural 2)
157
Vaijapur Rural 2 Shelke Wasti
Vaijapur Rural 2 Shete Wasti
158 Virgaon Murshadpur
159 Virgaon Virgaon
160 Wadji Wadji
161 Waghla Waghla
162 Wakla Wakla
163 Wanjargaon Wanjargaon
164 Zolegaon Zolegaon
Total
ANNEXTURE V
ITEM CODE ATS_STARTER :The scope of work includes, designing, providing and giving test
and trial of locallymanufactured fully automatic auto transformer starter with approved
make power contactorFully automatic auto transformer starter shall be housed in totally
enclosed sheet metal clad, vermin and dust proof cubical box, suitable for floor / plinth
mounted for indoor operation. The panel shall be fabricated from MS sheet SWG 14, with
hinged door at front. Limit switch shall be provided to trip the motor in the event of opening
of door. The panel framework shall have ICMC- 100 base channels.
The size of the cubical box shall be sufficient for ease in maintenance work and proper
ventilation. However the size of the cubical should not be less than 1.5 Mtr height X 0.9 Mtr
width X 0.5 Mtr deep. At least two number of ventilatinglouvers shall be provided on side
walls, at top to exit the hot air, and one numberlouver at bottom to allow fresh air inlet.
The terminal box shall be of waterproof construction suitable for outdoor service.Gaskets
shall be provided at the cover joints and between box and themotor frame.
The terminal box shall be suitable for termination of 240 Sq.mm aluminiumarmoured three
core PVC cable . The Contractor should make this arrangementspecially, the cost for which
in included in the rate of item.
Terminal box shall be complete with stud type terminals, plain washers,spring washers,
check nuts, cable glands and lugs.
The panel shall be painted with one coat of primer and two coats of enamel paint of
approved shade.
Bus bar, copper strips, copper leads shall be designed for twice the full load current. The
potential wiring shall be carried out in 1.5 Sq.mm copper cable,and CT. circuit wiring shall be
carried in 2.5 Sq.mm copper cable.The Auto transformer starter shall incorporate following
equipment.
Triple pole AC3 rating as per following 2 Nos
chart. Power contactor With required
number of NO& NC.
MAIN CONTACTOR
AUXILLARY CONTACTOR, 400Amp. 1 Nos.
Oil immersed, copper wound Auto 1 Nos.
transformer With tapings, 50%, 65%, 80%
with first fill of Best quality transformer oil.
CT operated bimetallic over load relay. 1 Nos.
ON & OFF Pneumatic timer (0.05 to 30 Sec) 1 Nos.
ON delay pneumatic timer (0.05 to 30 Sec) 1 Nos.
Master timer 1 Nos.
ON OFF Push buttons. 2 Nos.
HRC control fuses. 2 Nos.
Suitable rating Ammeter with metering CTS 1 Nos.
& Selector switch.
Thermostat with 1No.+ 1 NC. for oil 1 Nos.
temperature
Door limit switch. (1 NO +1 NC) 1 Nos.
Current sensing Single phasing presenter 1 Nos.
with CTS
No volt release 1 Nos.
Motor Protection Relay,solid state with 1 Nos.
protection CT’s
Indicating lamps, Motor ON, OFF, TRIP 3 3 Nos.
(Protection CTs 10P3 / 10 VA)
Cubical Panel Size (Main Contactor/Auxiliary Contactor/ Auxiliary Contactor)
1.25 m height X 0.75 m width X 0.45 m deep.
40 HP (110 / 40 / 40)
60 HP (200 / 70 / 70)
80 HP (200 / 110 / 110)
100 HP (200 / 110 / 110)
120 HP (300 / 150 / 150)
1.5 m height X 0.9 m width X 0.5 m deep.
150 HP (300/150/150)
180 HP (400/170/170)
220 HP (400/200/200)
250 HP ( 400/300/300)
270 HP (630/300/300)
300 HP (630/300/300)
ITEM CODE UPS :Supplying, erecting, testing & commissioning of Online UPS with necessary
safeties,etc.
Material:
Equipment manufactured as per standard manufacturer’s specification and as tabulated
in Table No. 3.7/2. The unit housed in powder coated CRCA sheet enclosure with following
fault protection on mains / UPS mode:
• Under voltage on mains mode
• Over voltage on mains mode
• Charger protection on mains mode
• Overload on UPS mode
• Short circuit on UPS mode
• Low battery on UPS mode
• Battery reverse on UPS mode
• Under voltage on UPS mode
• Over voltage on UPS mode
• LED & LCD display for above fault protection
• Alarm for above fault protection
• Batteries shall be of Sealed Maintenance Free type (Tubular). The selection
ofnumber of batteries required shall be as per Table No 3.7/1.
ITEM CODE (FRNTR) : FURNITURE
The contractor has to supply following meters / instruments / Tools / safety equipment
/Spares/Water Cooler and Furniture of standard specification and approved make as directed by
the Engineer-in-charge
Sr.No. Item Qty Unit
1 Godrej steel cub board (6*4*1) 1 No
2 Steel revolving chair 1 No
3 Plastic chair 6 No
4 Steel table 1 No
5 Wall mounted fan 2 No
6 Computer/Laptop 1 No
7 Printer ( All in one) 1 No
ANNEXTURE VI
ANNEXTURE VII
Name of Scheme :-373 VILLAGE GANGAPUR - VAIJAPUR TALUKA GRID WATER SUPPLY SCHEME, Dist.:- Aurangabad (Under Jal Jeevan Mission)
Sr No Sub Work Period Monsoon (NWP) Monsoon (NWP)
Month July Aug Sep Oct Nov Dec Jan-23 Feb Mar Apr May June July Aug Sep Oct Nov Dec Jan-24 Feb Mar Apr May June Trial Run
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 12 Months
Head Works
Approach Channel (50M) and
1 20
Connecting Main (200m)
Jackwell (25 m x 20 m X 19.6 M) and
2 20
Pump House (25 m x 20 m)
3 Approach Bridge (150M ) 20
4 Approach Bund ( L= 400m) 20
Approach Road (Length =
5 20
1600+200+200)
Raw Water Rising Main
Raw Water Rising Main ( 1199 mm
6 15
OD 15460 )
7 RWRM Bridge 12
Water Treatment Plant
Water Treatment Plant (Conventional -
8 21
105 MLD)
8 .A 21
Recirculation Sump and Pump House
Inlet for Recirculation Sump (600 mm
8B 21
dia DI K-7)
Wash Water Rising Main to Aeration
8C Fountain (300mm dia DI K-9, ) 21
8D Compound Wall For WTP 10 1
8E Staff Quarters 10
8F Godown at WTP 10
PWRM WTP to VAIJPUR
9 14
Chorwaghalgaon SUMP
PWRM WTP to varouus MBR in
10 14
GANGAPUR
PWRM from Chorwagalgaon
11 Sump to Various MBR 14
VAIJAPUR
12 Pure WaterSump @ Various Locationc 10
O /H PUMP HOUSE
Month July Aug Sep Oct Nov Dec Jan-23 Feb Mar Apr May June July Aug Sep Oct Nov Dec Jan-24 Feb Mar Apr May June Trial Run
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 12 Months
12.A LIMBE JALGAON 4
12 B Khadak Narla 4
12 C Chorwaghlgaon 4
12 D Khandala 4
12E Jambhala 4
12 F Warzadi
12 G Godown at Vaijapur 6 1 2 3 4 5 6
13 MBR AT GNAGAPUR 18
113 A MBR AT GNAGAPUR 18
13 B WIRE FENCING TO MBR 4
Elevated Service Reserviors
14 18
(Total 203 Nos)
Elevated Service Reserviors
14 A 18
(Total 114 Nos)
Pure Water LM Gangapur
15 20
(HDPE & DI = 615.17 Km)
Pure Water LM Vaijapur
15A 20
(HDPE & DI = 559.94 Km)
Utility Room For MBR, ESR &
16 6
Solar
17 Trial and Run for 1 year Trial Run 12
Months
18 Working Survey 2
Gangapur Taluka Grid Rural (E
& M Estimates)
Raw water Pumping Machinery at
Intake at Kaigaon Toka to WTP at
19 8
Gangapur + VAIJAPUR 650 HP(
3 W + 2S )
Pure water Pumping Machinery at
20 Sump Gangapur to Vaijapur 6
Sump 300 HP( 3 W + 2S )
Pure water Pumping Machinery at
21 Gangapur WTP to Manjari MBR 4
75 HP( 1 W + 1S )
Month July Aug Sep Oct Nov Dec Jan-23 Feb Mar Apr May June July Aug Sep Oct Nov Dec Jan-24 Feb Mar Apr May June Trial Run
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 12 Months
Pure water Pumping Machinery at
22 Gangapur WTP to MBR in 4
campas 20 HP( 1 W + 1S )
Pure water Pumping Machinery at
23 Gangapur WTP to MBR @ Limbe 4
Jalgaon 150 HP( 2 W + 1S )
Pure water Pumping Machinery at
Gangapur WTP to MBR 1 & 2 @
24 4
RANJANGAON 150 HP( 1 W +
1S )
Pure water Pumping Machinery at
25 Gangapur WTP to Diagaon MBR 4
75 HP( 1 W + 1S )
Pure water Pumping Machinery at
26 Gangapur WTP to Lasur Station 4
MBR 75 HP( 1 W + 1S )
Pure water Pumping Machinery at
Limbe Jalgaon Sump to
27 4
Ghanegaon MBR 250 HP( 2 W +
1S )
Pure water Pumping Machinery at
28 Limbejalgaon sump to Local MBR 4
1& 2- 40 HP( 1 W + 1S )
Pure water Pumping Machinery at
29 Limbejalgaon sump for Gajagaon 4
MBR 20 HP( 1 W + 1S )
Pure water Pumping Machinery at
30 Khadaknarla Sump to Local 4
MBR 40 HP( 1 W + 1S )
Pure water Pumping Machinery at
31 Khakaknarla sump for Diwshi 4
MBR 100 HP( 1 W + 1S )
Pure water Pumping Machinery at
32 Vaijapur Sump to Khadaknarla 4
sump 250 HP( 3 W + 2 S )
Pure water Pumping Machinery at
33 Vaijapur sump to Makrmatpur 4
MBR 100 HP( 1 W + 1S )
Month July Aug Sep Oct Nov Dec Jan-23 Feb Mar Apr May June July Aug Sep Oct Nov Dec Jan-24 Feb Mar Apr May June Trial Run
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 12 Months
Pure water Pumping Machinery at
34 Vaijapur sump to Siddapurwadi 4
MBR 75 HP( 1 W + 1S )
Pure water Pumping Machinery at
35 Vaijapur Sump to Local MBR 1- 4
30 HP( 1 W + 1S )
Pure water Pumping Machinery at
36 Vaijapur Sump to Local MBR 2- 4
25 HP( 1 W + 1S )
Pure water Pumping Machinery at
37 Khandala sump to Wakala MBR 4
100 HP( 1 W + 1S )
Pure water Pumping Machinery at
38 Khandala sump to Narala MBR 4
75 HP( 1 W + 1S )
Pure water Pumping Machinery at
Khandala sump to Shioor
4
Bangala MBR- 50 HP( 1 W + 1S
)
Pure water Pumping Machinery at
Khandala sump to Local MBR 1- 4
40 HP( 1 W + 1S )
Pure water Pumping Machinery at
Khandala sump to Local MBR 20 4
HP( 1 W + 1S )
Pumping Machinery for setteled
water lifting from Recycling Sump
4
to Aeration fountaon at WTP
GANGAPUR
Automation 6
Solar 6
Water Hammer Control Devices 4
Chlorination at other sump 4
Note:- A) From above calculation the maximum project duration required for a scheme is 24 months
B) Add 12 Months for Trail Run.
C) Total 36 Months i.e. 3 Yrs