WELDING INSPECTION

1. FULL PENETRATION 100%


5 2. VISUAL 100%
5 TYP.
XX
X
-X
X
-X 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
TYPICAL BASE
PLATE 10 THK NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
TRUSS
X STRUCTURA PENETRATION 100% 100% -
ALL (4)
TYPICAL BOTTOM L MEMBER T-JOINTS
CHORD OF TRUSS
5 EA 70x70x6 THK FILLET WELD 100% 10%
W01 5 5
W20 5 PARTIAL
A TYPICAL TRUSS TO BASE PLATE PENETRATION 100% 10%
5 - JOINTS
W02 5 WELD DETAILS
NON- LADDER, HANDRAIL,
A STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
B TR
NOTES
U 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
U

SS

UKA70*70*6
6
KA

2A
0*
TRUSS 1
5 2B 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
*7
70

W03

SS
5
5 W21 70
*7

U
5 IMPLEMENTED
0*

KA

TR
6

5 U
W19 3. THICKNESS MORE THAN 38 mm SHOULD BE UT
5
C
TR A 7

4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm


UK

5
US 0*

5 W18
TR KA7

S 70*

5
U

W04 REFERENCE DOCUMENTS


3E 6
US 0*

5
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
S 70*

TRUSS 4
3A 6

TRUSS 5 UKA70*70*6 2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL


UKA70*70*6
CALCULATION REPORT
5 5
W05 5 5 5 W17 3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS
5 W16

W15
5
5
SD-UJV
TRUSS 6
DOCUMENT STATUS SIGNED DATE
E UKA70*70*6
1 - ACCEPTED AS SUBMITTED (submit certified as final)
5
5 5 W13 5
W14 5 5 W12 REVISE AND RESUBMIT
TRUSS 5
2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT
5 UKA70*70*6
W06 5 REJECTED - Document unacceptable, revise and resubmit
3
*6

-
0* 3F
70

F TRUSS 7 (work can proceed where not impacted by this rejection)


A7 S
UKRUS

UKA70*70*6
*6
0* 3B

T
70
A7 S

4 - REVIEW NOT REQUIRED


UKRUS

5 5
W11
T

W10 5 5
5 5
5 5 W22 W38 5 W39
5 SCF - SUPPLIER CERTIFIED AS FINAL EGBE ONOME Digitally signed by EGBE ONOME
Date: 2024.05.08 15:35:16 +01'00'
W07 5 5
5 W37 5
ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
G TRUSS 8 RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
UKA70*70*6 5
W23 5
WELD SUMMARY

UKA70*70*6
UKA70*70*6

5
W08

TRUSS 4
TRUSS 8

5
UKA70*70*6
TRUSS 6A

TR 5
W09
WELD TOTAL
*6

*7 A
5

6
9

U
UKA70*70*6

70 S 2
70

0*
U

SS
SS

5
TRUSS 7A

0* W24
KA

W01 TO W49 W49

KA S
U

10 7 5

U RU
70

TR

H KA
*7

T
U
0*

5 NOTES
6

W35 5
5 W36 5 1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
5 5 5 2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
5 W26 W34 5 W49
W25 5 5 3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
5
TRUSS 1 BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
I UKA70*70*6 4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
11
TRUSS *70*6 W40
5
UKA70 5

5 5
W32 5 W48 5
5 W47 5
U
TR

T KA
UKRUS
U

5 70
SS

5 W27 5 A7 S
W31 5 W28 3G 6 3C 6 5 0* 3H
*7
2B

5 5 S 70* S 70* W43 0*6


*70*6

5 70
US 70* US 70* A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24
UKA70S 11

R R TR *6
T KA T KA UK US
U U A7 S O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
TRUS

5 0* 3D
W30 70 REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
UKA70*70*6

5 *6
TRUSS 5

UKA70*70*6

L REVISIONS
TRUSS 5

5
W29 5 W46
5
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
5
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
M All rights reserved.
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
5 5 5
5 W42 W44 W45 5
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
W41 5
5 5
1 2 3 5 6 7 8 9 10 11 12 DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
TYPE A ROOF TRUSS PLAN VIEW DATE:
APPD. LNG:
25/04/24
LOCATION
BONNY ISLAND, NIGERIA
DISCIPLINE
CIV
UNIT No
8500
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 1 OF 34 A
WELDING INSPECTION
4
F50 F51 LOC-1 1. FULL PENETRATION 100%
3
WE LOC-1 F9 2. VISUAL 100%
5 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
WD F50
5 F51 NDT METHOD
2 CATEGORIES WELDING TYPE
LOC-1 F1 VT MT (1) UT (2) RT (2)
FULL
F50 F51 PENETRATION 100% 100% -
100%
(3)
WC 1
5 LOC-1 P20 BUTT JOINTS

F50 F1 FULL
100%
STRUCTURA PENETRATION 100% 100% -
(4)

P2
ALL

P25
T-JOINTS
WB 0 P19 L MEMBER

6
5 F51 LOC-1 FILLET WELD 100% 10%
F50 F51 F1 F1 PARTIAL

P2
PENETRATION 100% 10%
9 P22 P21
LOC-0

7
JOINTS

WA P17 F1 P2 NON- LADDER, HANDRAIL,


5 P23 8 STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
P2 L PC PILE, FLOORING
LOC-08 9 F7
F8
P24 NOTES

P18 P3 F1 F1 F1 F1 F1 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL


0 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
F6 LOC-01 LOC-02 P16 LOC-03 LOC-04 LOC-05 LOC-06 LOC-07 4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
- TRUSS 1 (2 NOS. TYPICAL) 1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
- 2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
NTS CALCULATION REPORT
P19
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS
P25
WC SD-UJV
5
WB DOCUMENT STATUS SIGNED DATE
5
1 - ACCEPTED AS SUBMITTED (submit certified as final)
WC 5 P20 P21
WB 5 P22 P23 P24 REVISE AND RESUBMIT
P28 2 -
WB
P18

INCORPORATE COMMENTS, UP-REV AND RESUBMIT


5 5
P27 P26 5 WD F7 REJECTED - Document unacceptable, revise and resubmit
5 WC WD 3 -

WA F6 P29 P30 (work can proceed where not impacted by this rejection)
F1 5 WE
WA 5 WA 4 - REVIEW NOT REQUIRED
5

SCF - SUPPLIER CERTIFIED AS FINAL


5
WE
P16 ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
WD P16 5
5 WF P16 WELD SUMMARY
WH WG WF
F6- WELD DETAILS WELD TOTAL
(LOC-01) F1- WELD DETAILS F7- WELD DETAILS W01 TO W192 W192
(LOC-02, 03, 04, 05 & 06) (LOC-07) NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

5 WD
WC 5
WE 5
WD
5 WB P17 \\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

5 WB
P 17
5 WA 5 A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24
WC WA O ISSUE FOR REVIEW
5 OU 25/04/24 SI 25/04/24 DA 25/04/24
WE REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
WB 5
P17 REVISIONS
5 WC This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.

WA 5
WF
P29 Recipient must obtain the written authority of the said company before wholly or partially duplicating.
5 P3 5 F1 P25 P26
All rights reserved.

0 F9 P19
PO No: 1394524
F8 WF P27 P28 VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
5 NLNG-1394524-CIV-DWG-0025
WD NLNG - BONNY
P18

5 DRAWN: ONYEANYA U.
P20 P21 DATE: 25/04/24
PROJECT
NLNG TRAIN 7
5
WG P22 P23 P24 CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD
F1- WELD DETAILS F9- WELD DETAILS APPROVED: DAVID A.
LOCATION
VENDOR LOGO

DISCIPLINE UNIT No
F8- WELD DETAILS (LOC-14)
DATE:
APPD. LNG:
25/04/24
BONNY ISLAND, NIGERIA CIV 8500
(LOC-09, 10, 11, 12 & 13) TITLE
PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
(LOC-08) {QRCODE} DATE:
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 2 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W192 W192


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 3 OF 34 A
WF WELDING INSPECTION
5 F63 1. FULL PENETRATION 100%
F62 2. VISUAL 100%
F64 5 WE 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
F62
LOC-14
NDT METHOD
F63 CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
F64 5 WD LOC-13
F62 FULL
100%
F64 PENETRATION 100% 100% - (3)
F63 F4 BUTT JOINTS
5 WC LOC-12 F1
F64 FULL
F62 PENETRATION 100% 100%
100%
-
STRUCTURA (4)
F63 ALL T-JOINTS
L MEMBER

P15
WB

4
LOC-11

P1
5 F1 FILLET WELD 100% 10%
F64 F62 P2 PARTIAL
F63 PENETRATION 100% 10%
WA LOC-10

P4
F62 5 JOINTS
F64 F1

P5
3 NON- LADDER, HANDRAIL,
F63 P1 STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -

P6
2 L PC PILE, FLOORING
LOC-09 F1 P1

P7
NOTES
1
LOC-08 P1 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL

P8
0 F1 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
F3 P1
P9

IMPLEMENTED
F1 3. THICKNESS MORE THAN 38 mm SHOULD BE UT
P3 F1 F1 F1 F1 F5 4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm
P1
REFERENCE DOCUMENTS
F2 LOC-01 LOC-02 LOC-03 LOC-04 LOC-05 LOC-06 LOC-07 1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
- TRUSS 2 (4 NOS. TYPICAL) CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS
-
NTS
SD-UJV
P6 P7 DOCUMENT STATUS SIGNED DATE
P8 P9 5
WC 5 WB
5 WA 1 - ACCEPTED AS SUBMITTED (submit certified as final)
P3 WD WB 5 WD 5 P4
5 WE 5
REVISE AND RESUBMIT
WC 5 F1 F5 2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT
P10 5
WA 5 3
REJECTED - Document unacceptable, revise and resubmit
5 -
WB 5 F2 (work can proceed where not impacted by this rejection)

P11 P12 P1
P1 P1 P13 P14 4 - REVIEW NOT REQUIRED

WA
SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


5 WF RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
WG 5 WE WC
WG WF 5
WELD SUMMARY
F2- WELD DETAILS F1- WELD DETAILS
(LOC-01) F5- WELD DETAILS WELD TOTAL
(LOC-02, 03, 04, & 05 )
(LOC-07) W01 TO W392 W392
NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
5 BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
WB 5
5 4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
5 5 WC
WB 5
5 WD WA 5 WC
5
5 WD
WA P2
P2
WC
\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

WD A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


P2
O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
WB F4 WE
5 5 REVISIONS

P10 P11 P12 WG This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
F1 5 Recipient must obtain the written authority of the said company before wholly or partially duplicating.
P13 P14 All rights reserved.

F3 WE
PO No: 1394524
WA 5 WF VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
WE WG P4 NLNG-1394524-CIV-DWG-0025
5 5 NLNG - BONNY
DRAWN: ONYEANYA U.
P3 P5 P6 P7 WF DATE: 25/04/24
PROJECT
NLNG TRAIN 7
P8 P9 P15 CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No

F3- WELD DETAILS F1- WELD DETAILS F4- WELD DETAILS


DATE:
APPD. LNG:
25/04/24
BONNY ISLAND, NIGERIA
TITLE
CIV 8500

(LOC-08) (LOC-09, 10, 11, 12 & 13) (LOC-14) {QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 4 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
P15
P5 CATEGORIES WELDING TYPE
NDT METHOD
VT MT (1) UT (2) RT (2)
WC
FULL
100%
WB 5
PENETRATION 100% 100% - (3)
BUTT JOINTS
5 FULL
100%
WA 5 5 WD STRUCTURA PENETRATION 100% 100%
(4)
-
ALL T-JOINTS
L MEMBER
FILLET WELD 100% 10%
F1 PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
P1 NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
WG 5
5 WF 5 WE 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
F1- WELD DETAILS 4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

(LOC-06) REFERENCE DOCUMENTS


1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W196 W196


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 5 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W197 TO W392 W392


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 6 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
LOC-08 CATEGORIES WELDING TYPE
MT (1) UT (2) RT (2)
VT

P76 FULL
F23 PENETRATION 100% 100% -
100%
(3)
LOC-0 BUTT JOINTS
9
FULL
100%
LOC-1 STRUCTURA PENETRATION 100% 100%
(4)
-
F1
0 LOC-1 L MEMBER
ALL T-JOINTS
1 FILLET WELD 100% 10%
F1 PARTIAL
LOC-1
P78

PENETRATION 100% 10%

P8
P8 2

4
JOINTS
3 F1

P86
P8 NON- LADDER, HANDRAIL,
P79 P85 7 LOC-1 STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
F1 3 F22 L PC PILE, FLOORING
P80 P8
8 LOC-1
4 NOTES
P81 F1 P8 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
F1 9 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE

P77
F5 F21 F1 P82
F1 IMPLEMENTED
F1
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm
LOC-01 P61 LOC-02 LOC-03 LOC-04 LOC-05 LOC-06 LOC-07 F5
REFERENCE DOCUMENTS
F60 F59 1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS
- TRUSS 3A, 3B, 3E & 3F TYPICAL
- SD-UJV
DOCUMENT STATUS SIGNED DATE

P79 P80 1 - ACCEPTED AS SUBMITTED (submit certified as final)


P83 P84 P86 WB
P87 P88 P81 P82 P85
REVISE AND RESUBMIT
WC WA P77 5 WB 2 -
WA 5 5 INCORPORATE COMMENTS, UP-REV AND RESUBMIT
WC 5
P78 F5 3 -
REJECTED - Document unacceptable, revise and resubmit
F5 WD P89 (work can proceed where not impacted by this rejection)
WB WD
F1 5
5 5
WC 4 - REVIEW NOT REQUIRED

P61 P61
P61 SCF - SUPPLIER CERTIFIED AS FINAL
5
WA WG 5 WD
5
ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

5 WELD SUMMARY
WG WF 5 WE WF WE
5
WELD TOTAL

F5- WELD DETAILS W01 TO W388 W388


(LOC-01) F1- WELD DETAILS F5- WELD DETAILS NOTES
(LOC-02, 03, 04, 05 & 06) (LOC-07) 1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
5 4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
WB 5

5 WC
WD 5
WA 5 5
WE WD
5
WF WA 5
WC 5
P76 A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24
P76 WB O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
5 WE REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
WB REVISIONS
P76 WC This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
F1 Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
F23 F22 PO No: 1394524
WA 5 VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
P83 WH 5 WF NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
5 WD 5 DRAWN: ONYEANYA U. PROJECT
P78 P79 P80 P81 P77 DATE: 25/04/24 NLNG TRAIN 7
5 WG P82 P85 P84 P86 P87 CHECKED: SANUSI I.
VENDOR NAME
WG P88 P89 DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION
F22- WELD DETAILS DATE: 25/04/24
BONNY ISLAND, NIGERIA
DISCIPLINE
CIV
UNIT No
8500
F23- WELD DETAILS F1- WELD DETAILS (LOC-14)
APPD. LNG:
TITLE

(LOC-09, 10, 11, 12 & 13)


{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
(LOC-08) CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 7 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W194 W194


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 8 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W195 TO W388 W388


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 9 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
LOC-08 NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
P76
FULL
LOC-0 PENETRATION 100% 100% -
100%
9 BUTT JOINTS
(3)
F23 LOC-1 FULL
0 LOC-1 PENETRATION 100% 100%
100%
-
F1 1 STRUCTURA (4)
ALL T-JOINTS
L MEMBER
F1 100% 10%
FILLET WELD
LOC-1
P78

P8
P8 2 PARTIAL

4
3 F1 PENETRATION 100% 10%

P86
P8 JOINTS
P79 P85 7 LOC-1 NON- LADDER, HANDRAIL,
F1 3 LOC-1 STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
P80 P8
P81
8 4 F22 L PC PILE, FLOORING
F1
P8 NOTES
F1 F1 9 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
F5 F21 F1 P82
P77 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
F1
F5 IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
LOC-01 P61 LOC-02 LOC-03 LOC-04 LOC-05 LOC-06 LOC-07 4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm
F60 F59
REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
TRUSS 3C, 3D 3G & 3H TYPICAL 2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)


P83 P84 P86 WB P79 P80
P87 P88 P81 P82 P85 REVISE AND RESUBMIT
WB 2 -
WC WA 5 P77 5 INCORPORATE COMMENTS, UP-REV AND RESUBMIT
WA 5 5
WC REJECTED - Document unacceptable, revise and resubmit
P78 F5 3 -
F5 WD P89 (work can proceed where not impacted by this rejection)

WB WD
F1 5
5 5
4 - REVIEW NOT REQUIRED
WC
P61 P61
P61 SCF - SUPPLIER CERTIFIED AS FINAL

5
WA WG 5 WD
5 ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

5 WELD SUMMARY
WG WF 5 WE WF WE
5
WELD TOTAL

F5- WELD DETAILS W01 TO W388 W388


(LOC-01) F1- WELD DETAILS F5- WELD DETAILS NOTES
(LOC-02, 03, 04, 05 & 06) (LOC-07) 1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
5 4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
WB 5

5 WC
WD 5
WA 5 5
WE WD
5
WF WA 5
WC 5
P76 A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24
P76 WB O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
5 WE REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
WB REVISIONS
P76 WC This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
F1 Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
F23 F22 PO No: 1394524
WA 5 VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
P83 WH 5 WF NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
5 WD 5 DRAWN: ONYEANYA U. PROJECT
P78 P79 P80 P81 P77 DATE: 25/04/24 NLNG TRAIN 7
5 WG P82 P85 P84 P86 P87 CHECKED: SANUSI I.
VENDOR NAME
WG P88 P89 DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION
F22- WELD DETAILS DATE: 25/04/24
BONNY ISLAND, NIGERIA
DISCIPLINE
CIV
UNIT No
8500
F23- WELD DETAILS F1- WELD DETAILS (LOC-14)
APPD. LNG:
TITLE

(LOC-09, 10, 11, 12 & 13)


{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
(LOC-08) CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 10 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W194 W194


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 11 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W195 TO W388 W388


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 12 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
14
LOC- F13 2. VISUAL 100%
WD 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
F51 5 P32
P138 NDT METHOD
F50 LOC CATEGORIES WELDING TYPE
13
LOC- -15 VT MT (1) UT (2) RT (2)
F51 5 WC
FULL
LOC 100%
F50 F1 F1 -16 PENETRATION 100% 100% - (3)
2
5 WB LOC-1 BUTT JOINTS
FULL
100%
F50 F1 F12 STRUCTURA PENETRATION 100% 100%
(4)
-
11
LOC-
ALL

P33

P34
WA T-JOINTS

P4
L MEMBER

P4
5

6
F51

3
P140

P4
F51 FILLET WELD 100% 10%
F1

P1
P39

7
F50

41
0 PARTIAL
LOC-1

P4
P41 P38 PENETRATION 100% 10%
P40 JOINTS
F15 F1
NON- LADDER, HANDRAIL,
LOC-09 P42 8 STAIRWAYS, JOIST, ALL WELD TYPES
P4
STRUCTURA 100% 5% - -
9 F1 F1 F1 F11 F11 L PC PILE, FLOORING
P18 P4 F1
F1 NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
F14 LOC-01 LOC-02 LOC-03 LOC-04 LOC-05 P31 LOC-06 P139 LOC-07 LOC-08 F2 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
F55 IMPLEMENTED
F55 3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm
TRUSS 4 TYPICAL REFERENCE DOCUMENTS
2 NOS. 1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

P39 P40 P141


SD-UJV
P41 P42 WB 5
DOCUMENT STATUS SIGNED DATE
5
WC 5 P38
P18 WD WB 5 WD F2 1 - ACCEPTED AS SUBMITTED (submit certified as final)
5 WE 5 WC
5
WC WA
5 F1 5 REVISE AND RESUBMIT
P49 5 5
2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT
WA 5 WD
5 5
WB 5 F14 P139 REJECTED - Document unacceptable, revise and resubmit
P45 P46 3 -
(work can proceed where not impacted by this rejection)
P31 P31 P47 P48
WA
4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL


5 WF
WG 5 WE WF WE
WG WF ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
5
RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
F14- WELD DETAILS F1- WELD DETAILS
(LOC-01) F2- WELD DETAILS WELD SUMMARY
(LOC-02, 03, 04, & 05 )
(LOC-08)
WELD TOTAL

W01 TO W232 W232


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

5
5 5 WC
WB 5 5
5 WD
5 WD
WA WA 5
P32
\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

WC A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


P32 WB O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
P138 REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
WB REVISIONS
5
5 WC This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
P46 P47 F1 Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
P48 P49
PO No: 1394524
F15 WE
WA 5 F12
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
WE WG 5 WD NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
5
P18 P39 P40 WF WE 5 DRAWN: ONYEANYA U. PROJECT
P41 P42 DATE: 25/04/24 NLNG TRAIN 7
P38 CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
F15 & F12- WELD DETAILS F1- WELD DETAILS F12- WELD DETAILS DATE: 25/04/24
LOCATION
BONNY ISLAND, NIGERIA
DISCIPLINE
CIV
UNIT No
8500
APPD. LNG:
(LOC-09 & 16) (LOC-10, 11, 12 & 13) (LOC-16) TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 13 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
P140 VT MT (1) UT (2) RT (2)
P34 P143
P33 FULL
WB 100%
WA 5 5 PENETRATION 100% 100% -
WB WC (3)
5 5 BUTT JOINTS

WA
5 F1 F1 F1 5 WC FULL
100%
5 STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
P139 FILLET WELD 100% 10%
P31 P139 PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
WE WD L PC PILE, FLOORING
5
WF WE 5 WD NOTES
5
F1- WELD DETAILS 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
(LOC-06) 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED

F1- WELD DETAILS 3. THICKNESS MORE THAN 38 mm SHOULD BE UT


4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm
(LOC-07)
REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


WD 5 5 WE RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
5
WB 5
5 5 WELD SUMMARY
WC 5 5 WF
WA WC 5
5 WD
WELD TOTAL
5 F13
WB WG
W01 TO W232 W232
P138 WA 5 5 WH NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
WE P32 P138 2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
5
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
F1

WH 5 WF WP WJ
5 5 5
P45 P43
P140 \\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

WN P33 WK
P141 A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24
WG WM
P34
5 O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
5 WL REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
F1- WELD DETAILS
(LOC-15) F13- WELD DETAILS This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
(LOC-14)
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 14 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W1 TO W232 W232
NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 15 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
F50
WB NDT METHOD
F51 5 CATEGORIES WELDING TYPE
WD 5 WA WC VT MT (1) UT (2) RT (2)
F50 5 F34 5
LOC-11 P128 LOC-12 FULL
100%
F51 PENETRATION 100% 100% -
0
F50
WC 5 LOC-1 BUTT JOINTS
(3)
F34 P128
F51 WD FULL
100%
WB 5 9 F1 F33 STRUCTURA PENETRATION 100% 100% -
F50 F51 LOC-0 ALL T-JOINTS
(4)
P126
L MEMBER
WE FILLET WELD 100% 10%

P129
F1

P127
WA 5 8 5
LOC-0 PARTIAL

P130

33
PENETRATION 100% 10%

P1
35
F1 JOINTS

P1

4
F35 WF

P131
36

P13
5 LADDER, HANDRAIL,
P18 LOC-0
7 P132 P1 F5 P129
NON-
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
P133
37 F1 F1 L PC PILE, FLOORING
P1 F1 F1
P125 NOTES
F2 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
LOC-01 LOC-02 LOC-03 LOC-04 LOC-05 LOC-06
F55
F34- WELD DETAILS 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
(LOC-12) IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
TRUSS 5 TYPICAL 4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
4 NOS.
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

P127 P130
WB
SD-UJV
P131 P132 5 WA 5
DOCUMENT STATUS SIGNED DATE
WC 5 P129
5
P18 WD WB 5 WD
5 WE 5 F5 1 - ACCEPTED AS SUBMITTED (submit certified as final)

WC 5 F1
P137 5 REVISE AND RESUBMIT
WA 2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT
5 5 P125
WB 5 F2
P133 P134 3 -
REJECTED - Document unacceptable, revise and resubmit

P125 P125 P135 P136 (work can proceed where not impacted by this rejection)
WA
4 - REVIEW NOT REQUIRED

WF WC SCF - SUPPLIER CERTIFIED AS FINAL


WG 5
WG 5 WE
WF 5 ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
F2- WELD DETAILS F1- WELD DETAILS F5- WELD DETAILS
(LOC-01) (LOC-02, 03, 04, & 05 ) (LOC-06) WELD SUMMARY

WELD TOTAL

W01 TO W332 W332


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
5 WE
5 5 5 WD
5 WC WC 5
WB 5
5 5
5 WD WD 5 WF
5
WB
WA
P126
\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

WC
A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24
P126 WA 5
O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
WB 5 P128
REVISIONS
F33
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
5 WG Recipient must obtain the written authority of the said company before wholly or partially duplicating.
F1 P126 All rights reserved.
F35 P135 P136 P137
WA PO No: 1394524

5 WE 5 WE WJ
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
WG 5 WH NLNG-1394524-CIV-DWG-0025
P18 5 NLNG - BONNY
DRAWN: ONYEANYA U.
WF P127
PROJECT
P131 P132 P130 P134 DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
F35- WELD DETAILS F1- WELD DETAILS F33- WELD DETAILS APPROVED:
DATE:
DAVID A.
25/04/24
LOCATION DISCIPLINE UNIT No

(LOC-07) (LOC-11) BONNY ISLAND, NIGERIA CIV 8500


APPD. LNG:
(LOC-8, 9, & 10) TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 16 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W166 W166


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 17 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W167 TO W332 W332


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 18 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
5 WF 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
F51 WA 5 5 NDT METHOD
F50 P51 WB CATEGORIES WELDING TYPE
5 WE 5 VT MT (1) UT (2) RT (2)
F51 LO C-15 F18 FULL
100%
F50 14
LOC-
16 P51 WC PENETRATION 100% 100% -
F51 5 WD LOC- BUTT JOINTS
(3)

F50 FULL
F1 100%
13 STRUCTURA PENETRATION 100% 100% -
5 WC LOC- F1
F16 ALL T-JOINTS
(4)
F51 L MEMBER

P55
WD

P56
FILLET WELD 100% 10%
F50
WB 12 P53
F51 5 LOC- PARTIAL
F1 F16 PENETRATION 100% 10%

P33
JOINTS
F50 F50

P5
WA 11
LOC-
5 WE NON- LADDER, HANDRAIL,
5

7
STAIRWAYS, JOIST, ALL WELD TYPES

P39
F1 STRUCTURA 100% 5% - -
F51 P50 L PC PILE, FLOORING
P32 P54
10

P40
LOC- NOTES

P5
F20 F1 WF
F1 P5

8
F19 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
P41 9
LOC-09 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
P6 P2 IMPLEMENTED
9
P42

0 F1 F1 F1
P18

F2 3. THICKNESS MORE THAN 38 mm SHOULD BE UT


F1 F1 4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
F14 LOC-01 LOC-02 P31 LOC-03 LOC-04 LOC-05 LOC-06 LOC-07 LOC-08 1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
F55 2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
P55 CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS
P53
TRUSS 6 TYPICAL SD-UJV
DOCUMENT STATUS SIGNED DATE
1 NOS. F16- WELD DETAILS
(LOC-16) 1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

P33 P50 4 - REVIEW NOT REQUIRED

P56
P18 P53

WC P39 P40 P55


5
WB SCF - SUPPLIER CERTIFIED AS FINAL
5 P41 P42 P54
WB P29 5
5
P57 P58 5 WD ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
F2 5 WC
WA P59 P60 RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
F14 F1 5 WE
WA 5
WELD SUMMARY

WELD TOTAL
P31 W01 TO W118 W118
WD P31 5
WF NOTES
WH 5
WG 1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
F2 & 14- WELD DETAILS WD 5 WE 2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
5
(LOC-01 & 08) F1- WELD DETAILS BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
(LOC-02, 03, 04, 05 & 06) 4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
WC 5 WF
5

F19
WB 5
5 WG \\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

WD A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


5
WC
WE 5 O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
5
WD
5 WB P32 WA WH REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
5
P32
5 WA 5 REVISIONS
WC
P31 This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
5 WE Recipient must obtain the written authority of the said company before wholly or partially duplicating.
WB
All rights reserved.
PO No: 1394524
WA 5
WF P29 VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
5 P6 5 F1 NLNG-1394524-CIV-DWG-0025
0 P57 P58 NLNG - BONNY
F20 WF P59 P60 DRAWN: ONYEANYA U. PROJECT
5
5 DATE: 25/04/24 NLNG TRAIN 7
P18

WL WK WJ
P39 P40 5 5 5 CHECKED: SANUSI I.
VENDOR NAME
WG 25/04/24
5 P41 P42 P54 DATE: FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No

F20- WELD DETAILS F1- WELD DETAILS DATE: 25/04/24


BONNY ISLAND, NIGERIA CIV 8500
(LOC-10, 11, 12,13 & 14) F19- WELD DETAILS {QRCODE}
APPD. LNG:
DATE:
TITLE
PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
(LOC-09) (LOC-07) CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 19 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W118 W118


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
WC 5 5 WD BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
F18
WB WE

WA 5 5 WF

P32 P51 \\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
WK WG PO No: 1394524
P33 VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
P50 NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
WJ 5 DRAWN: ONYEANYA U. PROJECT
5 WH DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
F18- WELD DETAILS APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
(LOC-15) APPD. LNG:
BONNY ISLAND, NIGERIA CIV 8500
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 20 OF 34 A
WELDING INSPECTION
WA 5 1. FULL PENETRATION 100%
F51 WF 5
5
5 WB 2. VISUAL 100%
F50 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
WE P51 P51 WC NDT METHOD
5 5 CATEGORIES WELDING TYPE
F50 LOC-1 F18 VT MT (1) UT (2) RT (2)
LOC-
4 16 FULL
F51 5 WD F51 LOC-1 100%
PENETRATION 100% 100% - (3)
F50 F17 BUTT JOINTS
F16 WD
WC 3 FULL
F51 5 LOC-1 F1 100%
STRUCTURA PENETRATION 100% 100% -
(4)

P55
F16 ALL

P56
F50 L MEMBER T-JOINTS
WB 2
5 LOC-1 P54
FILLET WELD 100% 10%
F51 F1 WE 5 PARTIAL
P53

P33
F50 PENETRATION 100% 10%

P5
WA 1
F50 5 LOC-1 F1 JOINTS

7
P39
F51 WF NON- LADDER, HANDRAIL,
P50 STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
0
LOC-1

P40
L PC PILE, FLOORING

P5
F1
F20 P3 2 F1 P5

8
9 NOTES

P41
LOC-09 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
P6 P2
9 F19
P42

0 F1 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE


F1 F1
P18

F2 IMPLEMENTED
F1 F1
P31 3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm
F14 LOC-01 LOC-02 LOC-03 LOC-04 LOC-05 LOC-06 LOC-07 LOC-08 P55
REFERENCE DOCUMENTS
F55 P53 1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
TRUSS 6A TYPICAL 3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

1 NOS.
F16- WELD DETAILS
(LOC-16) SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

P33 P50 4 - REVIEW NOT REQUIRED

P56
P18 P53

WC P39 P40 P55


5
WB P41 P42 P54 SCF - SUPPLIER CERTIFIED AS FINAL
5
WB P29 5
5
P57 P58 5 WD ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
F2 5 WC
WA P59 P60 RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
F14 F1 5 WE
WA 5
WELD SUMMARY

WELD TOTAL
P31 W01 TO W118 W118
WD P31 5
WF NOTES
WH 5
WG 1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
F2 & 14- WELD DETAILS WD 5 WE 2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
5
(LOC-01 & 08) F1- WELD DETAILS BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
(LOC-02, 03, 04, 05 & 06) 4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
WC 5 WF
5

F19
WB 5
5 WG \\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

WD A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


5
WC
WE 5 O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
5
WD
5 WB P32 WA WH REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
5
P32
5 WA 5 REVISIONS
WC
P31 This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
5 WE Recipient must obtain the written authority of the said company before wholly or partially duplicating.
WB
All rights reserved.
PO No: 1394524
WA 5
WF P29 VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
5 P6 5 F1 NLNG-1394524-CIV-DWG-0025
0 P57 P58 NLNG - BONNY
F20 WF P59 P60 DRAWN: ONYEANYA U. PROJECT
5
5 DATE: 25/04/24 NLNG TRAIN 7
P18

WL WK WJ
P39 P40 5 5 5 CHECKED: SANUSI I.
VENDOR NAME
WG 25/04/24
5 P41 P42 P54 DATE: FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No

F20- WELD DETAILS F1- WELD DETAILS DATE: 25/04/24


BONNY ISLAND, NIGERIA CIV 8500
(LOC-10, 11, 12,13 & 14) F19- WELD DETAILS {QRCODE}
APPD. LNG:
DATE:
TITLE
PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
(LOC-09) (LOC-07) CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 21 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W118 W118


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
WC 5 5 WD 4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

F18
WB WE

WA 5 5 WF
\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

P32 P51 A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
WK WG VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
P33 NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
P50 DRAWN: ONYEANYA U. PROJECT
WJ 5 DATE: 25/04/24 NLNG TRAIN 7

5 WH CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
F18- WELD DETAILS DATE: 25/04/24
LOCATION
BONNY ISLAND, NIGERIA
DISCIPLINE
CIV
UNIT No
8500
APPD. LNG:
(LOC-15) TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 22 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
5 WF 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
5 WE VT MT (1) UT (2) RT (2)
LOC-17 FULL
100%
LOC-1 PENETRATION 100% 100% -
16 8 (3)
5 WD F50 LOC- BUTT JOINTS
F51 P90
FULL

P34
F26 LOC-1 100%
F51 F50 15 9 STRUCTURA PENETRATION 100% 100%
(4)
-
5 WC LOC- F1 L MEMBER
ALL T-JOINTS
F50 P32 F1

P99
FILLET WELD 100% 10%

P54

P92
LOC-2
WB 14 0 PARTIAL
F51 5 LOC- F1 F1
F51 PENETRATION 100% 10%
F50 F25 JOINTS
F1

P33
WA 13

7
LADDER, HANDRAIL,
LOC-
NON-

P9
F50 5 F1

P5

P95
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -

P39

7
P5
F51 8 L PC PILE, FLOORING
P9

8
12

P96
LOC- NOTES

P40
P5

P94
F20

P41
9 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
P2
LOC-11 9 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
F1
P9 IMPLEMENTED
P42

3 F1 F1 F2
P18

F1 3. THICKNESS MORE THAN 38 mm SHOULD BE UT


F1 F24 F1
F5 F1 F1 4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm
P31 P91
REFERENCE DOCUMENTS
LOC-01 LOC-02 LOC-03 LOC-04 LOC-05 LOC-06 LOC-07 LOC-08 LOC-09 LOC-10 1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
F55 F55 2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS
TRUSS 7 TYPICAL
SD-UJV
1 NOS.
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED


P33 P34
P92
P18 P94

WC P39 P40 P99


5 SCF - SUPPLIER CERTIFIED AS FINAL
WB 5 P41 P42 P54
WB P29 5
5 ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
P57 P58 5 WD
F2 5 WC RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
WA P59 P60
F5 F1 5 WE
WA 5
WELD SUMMARY

WELD TOTAL
P31 P31 W01 TO W147 W147
WD P31 5
WF NOTES
WH 5
WG 1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
F2 & 5- WELD DETAILS WD 5 WE 2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
5
(LOC-01 & 10) F1- WELD DETAILS BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
(LOC-02, 03, 04, 05 & 06) 4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
WC 5 WF
5

F24
WB 5
5 WG \\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

WD A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


5
WC
WE 5 O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
5
WB P32
P90
5 WA WH REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
WD 5
P32
5 WA 5 REVISIONS
WC
P31 This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
5 WE Recipient must obtain the written authority of the said company before wholly or partially duplicating.
WB
All rights reserved.
PO No: 1394524
WA 5
WF P29 VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
5 P9 5 F1 NLNG-1394524-CIV-DWG-0025
3 P57 P58 NLNG - BONNY
F20 F25 P9 WF P59 P60 DRAWN: ONYEANYA U.
8 PROJECT
P18 P94

5
5 DATE: 25/04/24 NLNG TRAIN 7
WL WK WJ
P39 P40 5 5 5 CHECKED: SANUSI I.
VENDOR NAME
WG 25/04/24
5 P41 P42 P54 DATE: FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
F1- WELD DETAILS DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
F20 & 25- WELD DETAILS (LOC-12,13, 14, 15 & 16) F24- WELD DETAILS {QRCODE}
APPD. LNG:
DATE:
TITLE
PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
(LOC-11 & 20) (LOC-07) CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 23 OF 34 A
WELDING INSPECTION
WC 5 5 WD 1. FULL PENETRATION 100%
2. VISUAL 100%
F18 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
WB WE
NDT METHOD
CATEGORIES WELDING TYPE
WA 5 5 WF VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% -
P32 P90 BUTT JOINTS
(3)

FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
F26 PARTIAL
PENETRATION 100% 10%
WK WG JOINTS
P33 NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
WJ
P34
5 L PC PILE, FLOORING

5 WH NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
F26- WELD DETAILS 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
(LOC-17) 3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
WB P95 CALCULATION REPORT
5 P96 P97 3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS
P98

WA 5 WC SD-UJV
5
DOCUMENT STATUS SIGNED DATE
F1
1 - ACCEPTED AS SUBMITTED (submit certified as final)

P51 REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)
5 WD
WG WF WE 5
5
4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL


F1- WELD DETAILS
(LOC-08 & 09) ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W147 W147


WA 5 5
WB 5 WC
NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
WD 2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
5 WE 3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
P90

F1

P97
\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

5 WF A CERTIFIED FINAL
P99 OU 02/05/24 SI 02/05/24 DA 02/05/24
O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
WG P95
5 REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
P96
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
NIGERIA LIQUEFIED NATURAL GAS
F1- WELD DETAILS VENDOR DRAWING. No.
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
(LOC-18 & 19) DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 24 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
5 WF 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
5 WE VT MT (1) UT (2) RT (2)
F51
F50 LOC-17 FULL
100%
LOC-1 PENETRATION 100% 100% -
16 8 (3)
5 WD LOC- BUTT JOINTS
F51 P90
FULL

P34
F26 LOC-1 100%
F50 9 STRUCTURA PENETRATION 100% 100% -
15 (4)
F51 5 WC LOC- F1 F1 L MEMBER
ALL T-JOINTS
P32

P99
FILLET WELD 100% 10%

P54

P92
F50 LOC-2
WB 14 0 PARTIAL
F51 5 LOC- F1 F1 PENETRATION 100% 10%
F50 JOINTS

P33
WA 13

7
LADDER, HANDRAIL,
LOC- F25 NON-

P9
5 F1

P5
F51

P95
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -

P39

7
P5
F50 8 L PC PILE, FLOORING
P9

8
12

P96
LOC- NOTES

P40
F1 P5

P94
F20

P41
9 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
P2
LOC-11 F1 9 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
P9 IMPLEMENTED
P42

3 F1 F1 F2
P18

F24 F1 F1 3. THICKNESS MORE THAN 38 mm SHOULD BE UT


F1 F1 F1 4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm
P31 P91
REFERENCE DOCUMENTS
LOC-01 LOC-02 LOC-03 LOC-04 LOC-05 LOC-06 LOC-07 LOC-08 LOC-09 LOC-10
F5 1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
F55 2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
F55 CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

TRUSS 7A TYPICAL SD-UJV


DOCUMENT STATUS SIGNED DATE
1 NOS.
1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED


P33 P34
P92
P18 P94

WC P39 P40 P99


5 SCF - SUPPLIER CERTIFIED AS FINAL
WB 5 P41 P42 P54
WB P29 5
5 ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
P57 P58 5 WD
F2 5 WC RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
WA P59 P93
F5 F1 5 WE
WA 5
WELD SUMMARY

WELD TOTAL
P31 P31 W01 TO W147 W147
WD P31 5
WF NOTES
WH 5
WG 1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
F2 & 5- WELD DETAILS WD 5 WE 2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
5
(LOC-01 & 10) F1- WELD DETAILS BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
(LOC-02, 03, 04, 05 & 06) 4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
WC 5 WF
5

F24
WB 5
5 WG \\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

WD A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


5
WC
WE 5 O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
5
WB P32
P90
5 WA WH REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
WD 5
P32
5 WA 5 REVISIONS
WC
P31 This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
5 WE Recipient must obtain the written authority of the said company before wholly or partially duplicating.
WB
All rights reserved.
PO No: 1394524
WA 5
WF P29 VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
5 P9 5 F1 NLNG-1394524-CIV-DWG-0025
3 P57 P58 NLNG - BONNY
F20 P9 WF P59 P60 DRAWN: ONYEANYA U.
8 PROJECT
P18 P94

5
5 DATE: 25/04/24 NLNG TRAIN 7
WL WK WJ
P39 P40 5 5 5 CHECKED: SANUSI I.
VENDOR NAME
WG 25/04/24
5 P41 P42 P54 DATE: FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
F1- WELD DETAILS DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
F20 & 25- WELD DETAILS (LOC-12,13, 14, 15 & 16) F24- WELD DETAILS {QRCODE}
APPD. LNG:
DATE:
TITLE
PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
(LOC-11 & 20) (LOC-07) CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 25 OF 34 A
WELDING INSPECTION
WC 5 5 WD 1. FULL PENETRATION 100%
2. VISUAL 100%
F18 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
WB WE
NDT METHOD
CATEGORIES WELDING TYPE
WA 5 5 WF VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% -
P32 P90 BUTT JOINTS
(3)

FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
F26 PARTIAL
PENETRATION 100% 10%
WK WG JOINTS
P33 NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
WJ
P34
5 L PC PILE, FLOORING

5 WH NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
F26- WELD DETAILS 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
(LOC-17) 3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
WB P95 CALCULATION REPORT
5 P96 P97 3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS
P98

WA 5 WC
SD-UJV
5
DOCUMENT STATUS SIGNED DATE
F1
1 - ACCEPTED AS SUBMITTED (submit certified as final)

P51 REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)
5 WD
WG WF WE 5
5
4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL


F1- WELD DETAILS
(LOC-08 & 09) ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W147 W147


WA 5 5
WB 5 WC
NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
WD 2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
5 WE 3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
P90

F1

P97
\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

5 WF A CERTIFIED FINAL
P99 OU 02/05/24 SI 02/05/24 DA 02/05/24
O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
WG P95
5 REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
P96
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
NIGERIA LIQUEFIED NATURAL GAS
F1- WELD DETAILS VENDOR DRAWING. No.
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
(LOC-18 & 19) DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 26 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
WE 2. VISUAL 100%
F51 5
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
F50 5 WF
WD LOC-19 NDT METHOD
5
F51 CATEGORIES WELDING TYPE
F51 VT MT (1) UT (2) RT (2)
8 LOC-2 F50
WC F50 LOC-1 0 FULL
5 F51 100%
F51 5 WG PENETRATION 100% 100% -
F32 (3)
F50 BUTT JOINTS

P100
7 LOC-2
5 WB LOC-1 F29 F1 1 F50
F51 F51 FULL
5 WH 100%
F50 STRUCTURA PENETRATION 100% 100% -
(4)

P111
F51 6 ALL

P120
WA LOC-1 P54 LOC-2 F65 T-JOINTS
5
F1 2 L MEMBER
F50 F29 F51
P11 5 WJ FILLET WELD 100% 10%
6

P114
5
P113 LOC-1 F65 PARTIAL
F29 LOC-2
F1 3 PENETRATION 100% 10%

P102

21
P56

P117
5 WK
F30 JOINTS

P1
P1
4
LOC-1

P103
22

P118
06
F29 NON- LADDER, HANDRAIL,
F29 P1

P1
P104
F1 LOC-2 STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -

07
P1 4

P119
LOC-13 08 F28 PC PILE, FLOORING
F1 L
P105

P1 4
P1 09 F1 F1
F1 F27
F1 F1 P12 P115 NOTES
P18 10 F1 F1 F1 P123 F2
P112 P101 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
F5 LOC-01 LOC-02 LOC-03 LOC-04 LOC-05 LOC-06 LOC-08 LOC-09 LOC-10 LOC-11 LOC-12 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
LOC-07
IMPLEMENTED
F60 3. THICKNESS MORE THAN 38 mm SHOULD BE UT
F55
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
TRUSS 8 TYPICAL 1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2 NOS. 2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT
P114 P100
P18 P115

P56 P120 3 -
REJECTED - Document unacceptable, revise and resubmit
WC 5 P54 P102 (work can proceed where not impacted by this rejection)

5 WB P103 P104 P105


WB P106
5 5 4 - REVIEW NOT REQUIRED
P107 P108 5 WD
F2 5 WC
WA P109 P110
F5 F1 5 WE SCF - SUPPLIER CERTIFIED AS FINAL
WA 5
ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

P112 P101
WELD SUMMARY
WD P112 5
5 WF
WH WG WELD TOTAL
F2 & 5- WELD DETAILS WD 5
WE
W01 TO W358 W358
5
(LOC-01 & 12) F1- WELD DETAILS
NOTES
(LOC-02, 03, 04, 05 & 06) 1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
WC 5 WF
5 2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
F27 4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
WB 5 WG
5
5 WD
WC 5
WE 5
WB P113
P 116
5 WA WH
WD 5
P 113
5 WA 5
WC
P112 A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24
5 WE O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
WB
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
5
P106 REVISIONS
WA P1 WF
5
10 5 F29 P107 P108 This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
F28 F30 P1 WF
P109 P56 Recipient must obtain the written authority of the said company before wholly or partially duplicating.
24
P18 P115

5 All rights reserved.


5 PO No: 1394524
P54 P102 WL 5 WK 5 WJ
WG P103 P104 P105
5 VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
5 NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U.
F29- WELD DETAILS DATE: 25/04/24
PROJECT
NLNG TRAIN 7

F28 & 30- WELD DETAILS (LOC-14,15, 16, 17 & 18) F27- WELD DETAILS CHECKED: SANUSI I.
VENDOR NAME
(LOC-07) DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
(LOC-13 & 24) APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 27 OF 34 A
WELDING INSPECTION
WC 5 5 WD 1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
WB WE
NDT METHOD
CATEGORIES WELDING TYPE
WA 5 5 WF VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% -
P113 P116 (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
F32 PARTIAL
PENETRATION 100% 10%
WK WG JOINTS
P114 NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
WJ P100
5 L PC PILE, FLOORING

5 WH NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
F32- WELD DETAILS 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
(LOC-19) 3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
WB P111 P117 CALCULATION REPORT
5 P118 P119 P121 P122 3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS
P123 P124

WA 5 WC
SD-UJV
5
DOCUMENT STATUS SIGNED DATE
F1
1 - ACCEPTED AS SUBMITTED (submit certified as final)

P101 REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)
5 WD
WG WF WE 5
5
4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL


F1- WELD DETAILS
(LOC-08, 09, 10 & 11) ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W358 W358


WA 5 5
WB 5 WC
NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
WD 2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
5 WE 3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
P116

F1

P120 P121
\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

5 WF A CERTIFIED FINAL
P122 P123 OU 02/05/24 SI 02/05/24 DA 02/05/24
O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
WG P111 P117
5 REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
P118 P119
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
NIGERIA LIQUEFIED NATURAL GAS
F1- WELD DETAILS VENDOR DRAWING. No.
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
(LOC-20, 21, 22 & 23) DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 28 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
F51 F50 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
F50
LOC-19 5 WA NDT METHOD
F51 CATEGORIES WELDING TYPE
LOC-18 F51 WB VT MT (1) UT (2) RT (2)
5
F50
LOC FULL
LOC-17 F37 -20 F51 100%
F1 P14
3 5 WC PENETRATION 100% 100% - (3)
LOC F50 BUTT JOINTS
-21 F51
LOC-16 F1 F1 WD FULL

P147
5
F50
F51 100%
LOC STRUCTURA PENETRATION 100% 100% -
-22 (4)

P142
WE ALL
LOC-15 T-JOINTS

P157
F1 F1 5 F50 L MEMBER

P15

P152
4
P156
P146 LOC

6
P1 FILLET WELD 100% 10%

P1
-2 3 WF

P151
5
5

8
LOC-14 F1 5

P155

6
9 F1

P1
F1 F1 P1
LOC PARTIAL

P150
66
60
LOC-13

P154
F36 -24 PENETRATION 100% 10%

P1
P1 F28
67

P149
61
P1
P153

P16 F1 68 JOINTS
P3
2 F1 F1 F39 F1 F1 F1 P1
P16 F1 F1 P148 NON- LADDER, HANDRAIL,
3 P144 F1
P145 STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
STRUCTURA
F14 LOC-01 LOC-02 LOC-03 LOC-04 LOC-05 LOC-06 LOC-07 LOC-08 LOC-09 LOC-10 LOC-11 LOC-12 F40 PC PILE, FLOORING
L
F55 NOTES
F55
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
TRUSS 9 TYPICAL 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
1 NOS.
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
WC P147
5 WD 1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
5
WB P153 P154 P158 2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
P159 P160 P161 P148 5 WE CALCULATION REPORT
P162 P163 P155 P156 P157
WB F39 3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS
WC 5
WA 5 5 P164

P3 P148 F1 5 WD 5 WF SD-UJV
F14 F40 WA 5 DOCUMENT STATUS SIGNED DATE
WB 5 5 WC
P145
1 - ACCEPTED AS SUBMITTED (submit certified as final)

P144 P145
REVISE AND RESUBMIT
WA P145
2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


5 WG 3 -
WG WF 5 WE WK (work can proceed where not impacted by this rejection)
5

WD WJ 5 5 WH 4 - REVIEW NOT REQUIRED

F14 & F40- WELD DETAILS F1- WELD DETAILS F39- WELD DETAILS SCF - SUPPLIER CERTIFIED AS FINAL
(LOC-01 & 12) (LOC-02, 03, 04, 05 & 06)
(LOC-07)
ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W174 W174


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
WE 5 3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
5 BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
P149 P150 WD 5
WB 4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
5 P151 P152 P165 P166 P143 P146 5 5
WC WB 5 WC WD
P167 P168 5

WB 5
WA 5 WC WA 5
5
F1
WA 5
5 5 WF
P144 P146 5 WE A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24
F28 F36 O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
P158 P159 P160 REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
F1
5 WD P161 P162 REVISIONS
WG 5 WF WE 5 P3 P148 WG P163 P168
5 WF This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
WG 5 Recipient must obtain the written authority of the said company before wholly or partially duplicating.
P153 P154 All rights reserved.
P155 P156 P157
F1- WELD DETAILS PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
(LOC-08, 09, 10 & 11) F28 & F36 - WELD DETAILS NLNG-1394524-CIV-DWG-0025
F1 - WELD DETAILS NLNG - BONNY
(LOC-13 & 24) DRAWN: ONYEANYA U. PROJECT
(LOC-14, 15, 16, 17 & 18) DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 29 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W174 W174


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
WC WD WA 5 5
5 5 WB 5 WC

WB WE WF WD
5 WE
WA 5 5 \\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

P143
A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24
P146 P143 O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
F1 REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
P164 P165 WF
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
F37 P166 P167 5 All rights reserved.
PO No: 1394524

WK WG P149 P150 VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS


WG 5 P151 P152 NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
P147 DRAWN: ONYEANYA U. PROJECT
P142 DATE: 25/04/24 NLNG TRAIN 7
WJ 5 CHECKED: SANUSI I.
VENDOR NAME
5 WH DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
F1- WELD DETAILS DATE: 25/04/24
LOCATION DISCIPLINE UNIT No

F37- WELD DETAILS (LOC-20, 21, 22 & 23) APPD. LNG:


BONNY ISLAND, NIGERIA
TITLE
CIV 8500

(LOC-19) {QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -


CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 30 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
LOC-20 LOC-2 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
LOC-19 1
NDT METHOD
F44 LOC-22 CATEGORIES WELDING TYPE
LOC-18
F1
F1 VT MT (1) UT (2) RT (2)
P174 LOC-23 FULL

6
LOC-17

P18
100%

P175
F1 F1 P170 PENETRATION 100% 100% -
LOC-24 (3)

P169
BUTT JOINTS

P180
P185
LOC-16 F1
LOC-26

P19
87 F1

P179
F1

P184
P1 FULL
LOC-14 LOC-25
P181 P1
88 100%

2
9

P178
3

P183
P1 PENETRATION 100% 100% -
F41
LOC-15 F1
P1
94 18
9 F1
F45 STRUCTURA
ALL (4)

P177
P182
P197 P1
P
0 L MEMBER T-JOINTS

P176
9 5 F1 P19 91
F1
P19 F1
F1 F42
F1
F1 F1 F1 P1 P172 FILLET WELD 100% 10%
P3 F1 6 F1 F1
P173 P171
F5 PARTIAL
LOC-03 LOC-04 LOC-05 LOC-06 LOC-07 LOC-08 LOC-09 LOC-10 LOC-11 LOC-13F40 PENETRATION 100% 10%
LOC-01 F60
F55 LOC-12 JOINTS
LOC-02
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
TRUSS 10 TYPICAL L PC PILE, FLOORING
NOTES
1 NOS. 1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
P175 P169 3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS
P192 P186
P193 P194 P195
WB P181 P182
P183 P184 P185
SD-UJV
P196 P197
DOCUMENT STATUS SIGNED DATE
WA 5 WC
5
1 - ACCEPTED AS SUBMITTED (submit certified as final)
P3 P172
F1 5 WD
F5 F40
WB 5 5 WC 2 -
REVISE AND RESUBMIT
INCORPORATE COMMENTS, UP-REV AND RESUBMIT
P173
WD 5 WE 3 -
REJECTED - Document unacceptable, revise and resubmit
P171 P173 5 (work can proceed where not impacted by this rejection)
WA
WC 5 WF
5 4 - REVIEW NOT REQUIRED

5
WG 5
WF 5 WE F42
WB 5 WG
SCF - SUPPLIER CERTIFIED AS FINAL

WD 5
ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
F5 & F40- WELD DETAILS WA WH
F1- WELD DETAILS RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
(LOC-01 & 13) (LOC-02, 03, 04, 05 & 06)
P173 WELD SUMMARY

WELD TOTAL
5
WL 5 WJ W01 TO W183 W183
WK 5 5
NOTES
F24- WELD DETAILS 1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
(LOC-07)
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

WE 5
5 5 WC
5 5
WD 5 WB 5 WD
P176 P177 P178 P170 P174
WB 5
WC A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24
P179 P180 P187 P188 5
P189 P190 P191 WA 5 O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
WB REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
WA 5 WC
5 REVISIONS
WA 5 P174 WE This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
F1 5 5 WF 5 Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
P171 F42 F45 PO No: 1394524
F1 P192 P193 P194
P195 P196
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
WF
5 P3 P172 WG P191 P197 WG 5
DRAWN: ONYEANYA U. PROJECT
WG WF WE 5 WD 5 P181 P182 DATE: 25/04/24 NLNG TRAIN 7
5 P183 P184 P185 CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
F1- WELD DETAILS F42 & F45 - WELD DETAILS F1 - WELD DETAILS DATE: 25/04/24
LOCATION DISCIPLINE UNIT No
(LOC- 15, 16, 17, 18 & 19) BONNY ISLAND, NIGERIA CIV 8500
(LOC-08, 09, 10, 11 & 12) (LOC-14 & 26) APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 31 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W183 W183


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.
WC WD WA 5 5
5 5 WB 5 WC

WB WE WD
5 WE
WA 5 5
WF
P170
A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24
P174 P170 O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
F1 REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
P186 P187 WF
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
F44 P188 P189 P190 5 All rights reserved.
PO No: 1394524

WK WG P176 P177 VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS


WG 5 P178 P179 P180 NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
P175 DRAWN: ONYEANYA U. PROJECT
P169 DATE: 25/04/24 NLNG TRAIN 7
WJ 5 CHECKED: SANUSI I.
VENDOR NAME
5 WH DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
F1- WELD DETAILS DATE: 25/04/24
LOCATION DISCIPLINE UNIT No

F44- WELD DETAILS (LOC- 21, 22, 23, 24 & 25) APPD. LNG:
BONNY ISLAND, NIGERIA
TITLE
CIV 8500

(LOC-20) {QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -


CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 32 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
LOC-0 2. VISUAL 100%
8
LOC-0 3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
9
F47 NDT METHOD
LOC-1 CATEGORIES WELDING TYPE
0 VT MT (1) UT (2) RT (2)

P206
F1 FULL
100%
LOC-1 PENETRATION 100% 100% - (3)
1 BUTT JOINTS
P198
P199 FULL
F1 100%
LOC-1 STRUCTURA PENETRATION 100% 100% -
2 ALL (4)
P202 L MEMBER T-JOINTS
F1
FILLET WELD 100% 10%

07

P203
LOC-1
P2 3 PARTIAL

08
F48

P204
F1

P2
PENETRATION 100% 10%
09 LOC-1
4 JOINTS
P2

P210
F46 11 F1 LADDER, HANDRAIL,
P2 NON-

P205
2 STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -

P201
F1 F1 P 21 L PC PILE, FLOORING
F1 F1 F40 NOTES
P200 F1
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
LOC-01 LOC-02 LOC-03 LOC-04 LOC-05 LOC-06 LOC-07 2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
F59 3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

TRUSS 11 TYPICAL REFERENCE DOCUMENTS


1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2 NOS. 2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE
WB P202 P203 P204
P198 5 P205 P210 P207 P208 1 - ACCEPTED AS SUBMITTED (submit certified as final)
P206 P209 P211 P212
5 WB REVISE AND RESUBMIT
WA 2
WC 5 P201 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT
5 WC
WB WA 5 5
5 F40 REJECTED - Document unacceptable, revise and resubmit
3 -
(work can proceed where not impacted by this rejection)
F1
P200 4 - REVIEW NOT REQUIRED

F46 P200
WD SCF - SUPPLIER CERTIFIED AS FINAL

5
WA
ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF
5 WD RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
5 WG 5 WF WE 5
WE 5
WC
WELD SUMMARY

F1- WELD DETAILS F40- WELD DETAILS WELD TOTAL


WF P200
(LOC-02, 03, 04, 05 & 06) (LOC-07) W01 TO W180 W180
NOTES
F46- WELD DETAILS 1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
(LOC-01) 3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

WA 5
WB
5 5
WB 5 WC 5
5 WC
WD P199
WC 5 WD WD
WE
\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

5 A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


WE O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
P199
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
WB REVISIONS
P199 5 WF
F1 WA 5 5 This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
P206 P207 F48
WA F47 PO No: 1394524
5 P208 P209 P211
5 WF VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
P202 P203 P204 P212 WG P201 DRAWN: ONYEANYA U. PROJECT
P198 WG 5 5 DATE: 25/04/24 NLNG TRAIN 7
P205 P210
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA 8500
F47- WELD DETAILS F1- WELD DETAILS F48- WELD DETAILS APPD. LNG:
TITLE
CIV

(LOC-08) (LOC- 09, 10, 11, 12, & 13) (LOC-14)


{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 33 OF 34 A
WELDING INSPECTION
1. FULL PENETRATION 100%
2. VISUAL 100%
3. FILLET WELD PENETRATING LIQUID OR OTHER 10%
NDT METHOD
CATEGORIES WELDING TYPE
VT MT (1) UT (2) RT (2)
FULL
100%
PENETRATION 100% 100% - (3)
BUTT JOINTS
FULL
100%
STRUCTURA PENETRATION 100% 100% -
ALL (4)
L MEMBER T-JOINTS
FILLET WELD 100% 10%
PARTIAL
PENETRATION 100% 10%
JOINTS
NON- LADDER, HANDRAIL,
STRUCTURA STAIRWAYS, JOIST, ALL WELD TYPES 100% 5% - -
L PC PILE, FLOORING
NOTES
1. PENETRANT TESTING (PT) IS TO BE ADOPTED WHENEVER MT IS IMPRACTICAL
2. ANY JOINT WHERE UT OR RT IS NOT POSSIBLE TO BE MADE, MT OR PT SHALL BE
IMPLEMENTED
3. THICKNESS MORE THAN 38 mm SHOULD BE UT
4. MINIMUM THICKNESS FOR UT SHOULD BE ABOVE 12 mm

REFERENCE DOCUMENTS
1. T-14.419.251-PO 1394524-ASSET PERMANENT HOUSING-STEEL GENERAL NOTES
2. T-14.419.270-PO 1394524-ASSET PERMANENT HOUSING TYPE A-STRUCTURAL
CALCULATION REPORT
3. T-14.419.339-PO 1394524-ASSET PERMANENT HOUSING TYPE A-ROOF TRUSS DETAILS

SD-UJV
DOCUMENT STATUS SIGNED DATE

1 - ACCEPTED AS SUBMITTED (submit certified as final)

REVISE AND RESUBMIT


2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT

REJECTED - Document unacceptable, revise and resubmit


3 -
(work can proceed where not impacted by this rejection)

4 - REVIEW NOT REQUIRED

SCF - SUPPLIER CERTIFIED AS FINAL

ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIEVES SUPPLIER OF


RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER

WELD SUMMARY

WELD TOTAL

W01 TO W180 W180


NOTES
1. REFER TO THE FABRICATION SHOP DRAWINGS FOR ALL STRUCTURAL DIMENSIONS.
2. ALL WELD SHALL BE 5mm FILLET UNLESS NOTED OTHERWISE.
3. PROPER END PREPARATION OF MEMBERS ARE NECESSARY FOR JOINTS WHERE
BEVEL WELDS ARE INDICATED TO ACHIEVE FULL PENETRATION.
4. ALL FILLET WELDS ARE CONTINUOUS BETWEEN THE ADJOINING MEMBERS.

\\saipemnet.saipem.intranet\P_NLNG_T7\Groups\NLNGT7\32-FIELD-ENGINEERING\11-Exchange\Field Engineering Signatures\Signature_Dada Irheren.png

A CERTIFIED FINAL OU 02/05/24 SI 02/05/24 DA 02/05/24


O ISSUE FOR REVIEW OU 25/04/24 SI 25/04/24 DA 25/04/24
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
REVISIONS
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
All rights reserved.
PO No: 1394524
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
NLNG-1394524-CIV-DWG-0025 NLNG - BONNY
DRAWN: ONYEANYA U. PROJECT
DATE: 25/04/24 NLNG TRAIN 7
CHECKED: SANUSI I.
VENDOR NAME
DATE: 25/04/24 FIRST MARINE AND ENGINEERING SERVICES LTD VENDOR LOGO
APPROVED: DAVID A.
LOCATION DISCIPLINE UNIT No
DATE: 25/04/24
BONNY ISLAND, NIGERIA CIV 8500
APPD. LNG:
TITLE
{QRCODE} DATE: PO 1394524 - ASSET PERMANENT HOUSING - TYPE A -
CONTRACTOR DRAWING. No.
L085-CD.B.18955 STRUCTURAL STEEL ROOF TRUSSES FABRICATION WELD MAP IDENTIFICATION DRAWINGS
SCALE COMPANY PROJECT No. COMPANY DRAWING No. SHEET REV
CAD REF: T-14.419.338 ORIGINAL SIZE: A2 CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED B190170NTP
NTS CONTRACTOR PROJECT No.
N88480 T-14.418.956 34 OF 34 A