SWZ - OPEN PLOT NEARBY MONTESSA ON DUMAS ROAD

COBBLE SQUARE SHOT


BLASTED PAVER BLOCK M-35,
ELECTRICAL STREET LIGHT 60 mm THK OF VYARA MAKE
POLE 5 M HEIGHT OR AS OR EQUIVALENT MAKE WITH
PER SITE CONDITION PROPER BASE PREPARATION

RAISED PLATFORM FOR HT/LT


PANEL & TRANSFORMER AS PER
REQUIREMENT OF ELECTRICAL
CHARGING AGENCY

PRECAST U-SHAPE TRENCH AS


PER SIZE & SECTION 4.50
REQUIREMENT OF ELECTRICAL
CHARGING AGENCY
2.50

5.00

FOOTING BASE FOR METAL


COLUMNS FOR CANTILEVER
CANOPY

THERMOPLAST PAINT
FOR GROUND
MARKING

RUBBER WHEEL STOPPER

CANTILEVER CANOPY AS
PER DESIGN BY ELECTRICAL
CHARGING AGENCY AND
APPROVED BY SMC

EV CHARGING STATION
ON PAVED PLATFORM

CHARGING
SHRUBS

ELECTRIC

PARKING
VEHICLE

ONLY
AND
GROUND COVER

VACCUM WET PRESSED KERB OF WATER DRAIN DISHED


M-25 OF VYARA MAKE OR OUTLET CHANNEL
EQUIVALENT MAKE WITH PROPER
BASE PREPARATION

LATITUDE : 21.135376°
LONGITUDE : 72.750097°
EXISTING SITE IMAGE PROPOSED LAYOUT PLAN
NOTE
ALL ELECTRIFICATION ,WIRING, CONDUITS, FIXTURES, MCBS, ETC. ALL REVISED LAYOUTS OF FIRST 25 LOCATIONS FOR EV
REQUIRED TO BE INSTALLED BY ELECTRICAL CHARGING AGENCY CHARGING INFRASTRUCTURE - PHASE 1
NOTES:
1. ALL THE DIMENSIONS ARE IN MM UNLESS NOTED
OTHERWISE
2. FOLLOW WRITTEN DIMENSIONS ONLY, DO NOT
SCALE THE DRG. SR NO- 19
3. ANY DISCERPENCY FOUND IN THE DRG.SHALL BE
BROUGHT TO THE NOTICE OF ARCHITECT IMMEDIATELY.
PARKING HAS BEEN PROPOSED CONSIDERING CHARGING AT THE
4. READ THIS DRG WITH ALL RELVANT STR/ ELEC/.
PLUMB.DRG AND SPECIFICATIONS OF THE CONTRACT. REAR SIDE OF CAR.