MIDR CONSTRUCTION AND SUPPLIES

REVISED QUALITY CONTROL PROGRAM

Contract ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Naujan, Oriental
Contract Name:
Mindoro

LIMITS: LOCATION: Naujan, Oriental Mindoro


APPROPRIATION/CONTRACT COST P 4,836,135.31 SOURCE : Tigkan River
A. TEST TO BE PERFORMED: DATE : March 30, 2023
Pay Item
Description UNIT QUANTITY NO. OF TEST (MIN.)
No.

B.3 Permits and Clearances L.s. 1.00 Inspection Report


B.5 Project Billbard/Signboard ea 1.00 Inspection Report
B.7(2) Occupational Safety & Health Program L.s. 1.00 Inspection Report
801(1) Removal of Structures and Obstruction L.s. 1.00 Inspection Report
802(2) Structure Excavation Common Soil cu.m. 43.53 Engineer's Certification
804(1)a Embankment from Structure Excavation cu.m. 27.90 GPC-1, D-1
804(1)b Embankment from Common Borrow cu.m. 165.24 GPC-1, D-5
804(4) Gravel Fill cu.m. 52.07 G-1
Structural Concrete(Footing and Slab on Fill), A,
900(1)c2 cu.m. 58.88 #-1/pouring day Approx 2-sets
28 days
Structural Concrete(Footing Tie Beam), A, 28
900(1)c3 6.30 #-1/pouring day Approx 1-set
days cu.m.
900(1)c4 Structural Concrete(Columns), A, 28 days cu.m. 13.63 #-1/pouring day Approx 1-set

900(1)c5 2.70 #-1/pouring day Approx 1-set


Structural Concrete(Suspended Slab), A, 28 days cu.m.
Structural Concrete(Beams/Girders), A, 28 days
900(1)c6 4.32 #-1/pouring day Approx 1-set
cu.m.
a. Cement bags 815.39 Q-1
b. Sand cu.m. 42.92 Q-1; G-1
c. Gravel cu.m. 85.83 Q-1; G-2
d. Water ltr 1.00 Engineer's Certification
e. Design Mix with Trial Mix ltr 1.00 #-1
902(1)a Reinforcing Steel(Deformed) Grade 40 kgs. 5,837.09 Q-1/size
903(2) Formworks and Falseworks sq.m. 180.16 Inspection Report
CHB Non Load Bearing(including Reinforcing
109.35 Inspection Report
1046(2)a1 Steel) 100mm sq.m.
a. 100mm thk CHB pcs 1,421.55 Q-1
b. Cement bags 57.96 *Q-1
c. Sand cu.m. 4.37 **Q-1, G-1
d. Reinforcing Steel kgs. 354.29 ***Q-1
e. Tie Wire #16 kgs. 5.47 Inspection Report
1003(1)a1 Ceiling Fiber Cement Board, 4.5mm Metal Frame sq.m. 30.60 Inspection Report
1032(1)a1 Painting Works, Masonry/Concrete sq.m. 290.90 Inspection Report
411(2) Paint sq.m. 405.00 Inspection Report
1032(1)c Painting Works, Steel sq.m. 501.37 Inspection Report
1014(1)b2 Prepainted Metal, Sheets Long Span,Rib Type,
131.70 Inspection Report
above 0.427thk/above 0.427 thk) sq.m.
1013(2)a1 Fabricated Metal Roofing Accessory gauge 26,
30.00 Inspection Report
Ridge/Hip Rolls l.m.
1013(2)a2 Fabricated Metal Roofing Accessory gauge 26,
146.78 Inspection Report
Flashing l.m.
1013(2)b1 Fabricated Metal Roofing Accessory gauge 26, 96.20 Inspection Report
Gutters l.m.
1014(1)b1 Prepainted Metal Sheets Long Span, above
647.87 Inspection Report
0.427mm, Corrugated Type l.m.
1047(1) Structural Steel l.m. 2.77 Inspection Report
MIDR CONSTRUCTION AND SUPPLIES
REVISED QUALITY CONTROL PROGRAM

Contract ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Naujan, Oriental
Contract Name:
Mindoro

LIMITS: LOCATION: Naujan, Oriental Mindoro


APPROPRIATION/CONTRACT COST P 4,836,135.31 SOURCE : Tigkan River
A. TEST TO BE PERFORMED: DATE : March 30, 2023
Pay Item
Description UNIT QUANTITY NO. OF TEST (MIN.)
No.
1047(2)a Structural Steel Trusses kgs. 10,988.19 1-QT
1047(2)b Structural Steel Purlins kgs. 3,089.91 1-QT
1047(3)a Metal Structure Accessories(Bolts) pcs 96.00 Inspection Report
1047(3)b Metal Structure Accessories(Sagrods) pcs 156.00 Inspection Report
1047(3)c Metal Structure Accessories(Turn Buckle) pcs 24.00 Inspection Report
1047(5)c Metal Structure Accessories, Cross Bracing pcs 229.80 Inspection Report
1047(5d) Metal Structure Accessories, Steel Plates L.s. 351.02 Inspection Report
1001(9) Storm Drainage and Downspout L.s. 1.00 Inspection Report
Conduit Boxes and Fittings(Conduit Works/
1.00 Inspection Report
1100(10) Conduit Rough-in) L.s.
1101(33) Wires and Wiring Devices L.s. 1.00 Inspection Report
1102(1) Panelboard with Main and Branch Breakers L.s. 1.00 Inspection Report
1103(1) Lighting Fixtures and Lamps L.s. 1.00 Inspection Report

NOTE * Test included in 900(1)c - a


** Test included in 900(1)c - b
*** Test included in 902(1)a1 - a
Prepared By:

MARK IAN M. DELOS REYES


Materials Engineer
MIDR CONSTRUCTION AND SUPPLIES

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

Reviewed by: Approved :

ROCKY TOM S. ROMASANTA SALVADOR E. ABAD


Materials Engineer Disitrict Engineer
DPWH DPWH
March 30, 2023
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

STATUS O F TEST
As of MARCH 2023
Physical Accomplishment:
CONTRACT ID: 23ED0074
CONTRACT NAME: Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro

LOCATION:
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES
=

Pay Contract Min. # Total No. of Test


Description/Materials Unit
Item No. Quantity Required On File Balance

B.3 Permits and Clearances 1.00 L.s. Inspection Report IR


B.5 Project Billbard/Signboard 1.00 ea Inspection Report IR

1.00
B.7(2) Occupational Safety & Health Program L.s. Inspection Report IR IR

1.00
801(1) Removal of Structures and Obstruction L.s. Inspection Report IR

43.53
802(2) Structure Excavation Common Soil cu.m. Engineer's Certification EC EC

804(1)a Embankment from Structure Excavation 27.90 cu.m. GPC-1, D-1 GPC-1, D-1
165.24
804(1)b Embankment from Common Borrow cu.m. GPC-1, D-5 GPC-1, D-5
804(4) Gravel Fill 52.07 cu.m. G-1 G-1
Structural Concrete(Footing and Slab on Fill), A, #-1/pouring day #-1/pouring day
58.88 #-1/pouring day
900(1)c2 28 days cu.m. Approx 2-sets Approx 1-set Approx 1-set
Structural Concrete(Footing Tie Beam), A, 28 #-1/pouring day #-1/pouring day
6.30
900(1)c3 days cu.m. Approx 1-set Approx 1-set
#-1/pouring day #-1/pouring day
13.63
900(1)c4 Structural Concrete(Columns), A, 28 days cu.m. Approx 1-set Approx 1-set
#-1/pouring day
2.70 #-1/pouring day
900(1)c5 Structural Concrete(Suspended Slab), A, 28 days cu.m. Approx 1-set Approx 1-set
#-1/pouring day
4.32 #-1/pouring day
900(1)c6 Structural Concrete(Beams/Girders), A, 28 days cu.m. Approx 1-set Approx 1-set
a. Cement 815.39 bags Q-1 G-1, 1-QT
b. Sand 42.92 cu.m. Q-1; G-1 Q-1; G-1
c. Gravel 85.83 cu.m. Q-1; G-2 EC
d. Water 1.00 ltr Engineer's Certification EC
e. Design Mix with Trial Mix 1.00 ltr #-1 IR
902(1)a Reinforcing Steel(Deformed) Grade 40 5,837.09 kgs. Q-1/size IR
903(2) Formworks and Falseworks 180.16 sq.m. Inspection Report IR IR
CHB Non Load Bearing(including Reinforcing
109.35
1046(2)a1 Steel) 100mm sq.m. Inspection Report IR IR
a. 100mm thk CHB 1,421.55 pcs Q-1 Q-1
b. Cement 57.96 bags *Q-1 *Q-1
c. Sand 4.37 cu.m. **Q-1, G-1 IR
d. Reinforcing Steel 354.29 kgs. ***Q-1 IR
e. Tie Wire #16 5.47 kgs. Inspection Report IR IR
30.60
1003(1)a1 Ceiling Fiber Cement Board, 4.5mm Metal Frame sq.m. Inspection Report IR
1032(1)a1 Painting Works, Masonry/Concrete 290.90 sq.m. Inspection Report IR
411(2) Paint 405.00 sq.m. Inspection Report IR

501.37
1032(1)c Painting Works, Steel sq.m. Inspection Report IR
Prepainted Metal, Sheets Long Span,Rib Type,
131.70
1014(1)b2 above 0.427thk/above 0.427 thk) sq.m. Inspection Report IR
Fabricated Metal Roofing Accessory gauge 26,
30.00
1013(2)a1 Ridge/Hip Rolls l.m. Inspection Report IR
Fabricated Metal Roofing Accessory gauge 26,
146.78
1013(2)a2 Flashing l.m. Inspection Report IR
Fabricated Metal Roofing Accessory gauge 26,
96.20
1013(2)b1 Gutters l.m. Inspection Report IR
Prepainted Metal Sheets Long Span, above
647.87
1014(1)b1 0.427mm, Corrugated Type l.m. Inspection Report IR
1047(1) Structural Steel 2.77 l.m. Inspection Report IR
10,988.19
1047(2)a Structural Steel Trusses kgs. 1-QT 1-QT
1047(2)b Structural Steel Purlins 3,089.91 kgs. 1-QT 1-QT
96.00
1047(3)a Metal Structure Accessories(Bolts) pcs Inspection Report IR

1047(3)b Metal Structure Accessories(Sagrods) Inspection Report IR


24.00
1047(3)c Metal Structure Accessories(Turn Buckle) pcs Inspection Report IR
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

STATUS O F TEST
As of MARCH 2023
Physical Accomplishment:
CONTRACT ID: 23ED0074
CONTRACT NAME: Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro

LOCATION:
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES
=

Pay Contract Min. # Total No. of Test


Description/Materials Unit
Item No. Quantity Required On File Balance
229.80
1047(5)c Metal Structure Accessories, Cross Bracing pcs Inspection Report IR
1047(5d) Metal Structure Accessories, Steel Plates 351.02 L.s. Inspection Report IR IR
1.00
1001(9) Storm Drainage and Downspout L.s. Inspection Report IR
Conduit Boxes and Fittings(Conduit Works/
1.00
1100(10) Conduit Rough-in) L.s. Inspection Report IR
1101(33) Wires and Wiring Devices 1.00 L.s. Inspection Report IR
1102(1) Panelboard with Main and Branch Breakers 1.00 L.s. Inspection Report IR
1103(1) Lighting Fixtures and Lamps 1.00 L.s. Inspection Report IR

Prepared by Submitted By:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Materials Engineer Chief, Quality Assurance Section
Republic of the Philippines
OF PUBLIC WORKS AND HIGHWAYS
NTAL DISTRICT ENGINEERING OFFICE

TATUS O F TEST
As of MARCH 2023
45.19%

se Building, (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro

=
% of Work
Accomplished

100.00%

48.00%

100.00%

85.23%

100.00%

100.00%
100.00%

78.35%

100.00%

100.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
83.90%

15.36%
100.00%
100.00%
100.00%
100.00%
15.36%

100.00%
100.00%
Republic of the Philippines
OF PUBLIC WORKS AND HIGHWAYS
NTAL DISTRICT ENGINEERING OFFICE

TATUS O F TEST
As of MARCH 2023
45.19%

se Building, (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro

=
% of Work
Accomplished

47.86%
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

STATUS O F TEST
As of MAY 2023
Physical Accomplishment:
CONTRACT ID: 23ED0074
CONTRACT NAME: Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro

LOCATION:
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES
=

Pay Contract Min. # Total No. of Test


Description/Materials Unit
Item No. Quantity Required On File Balance

B.3 Permits and Clearances 1.00 L.s. Inspection Report IR


B.5 Project Billbard/Signboard 1.00 ea Inspection Report IR

B.7(2) Occupational Safety & Health Program 1.00 L.s. Inspection Report IR IR

801(1) Removal of Structures and Obstruction 1.00 L.s. Inspection Report IR

802(2) Structure Excavation Common Soil 43.53 cu.m. Engineer's Certification EC EC

804(1)a Embankment from Structure Excavation 27.90 cu.m. GPC-1, D-1 GPC-1, D-1

804(1)b Embankment from Common Borrow 165.24 cu.m. GPC-1, D-5 GPC-1, D-5
804(4) Gravel Fill 52.07 cu.m. G-1 G-1
Structural Concrete(Footing and Slab on Fill), A, #-1/pouring day #-1/pouring day #-1/pouring day
900(1)c2 28 days 58.88 cu.m. Approx 2-sets Approx 1-set Approx 1-set
Structural Concrete(Footing Tie Beam), A, 28 #-1/pouring day #-1/pouring day
900(1)c3 days 6.30 cu.m. Approx 1-set Approx 1-set
#-1/pouring day #-1/pouring day
900(1)c4 Structural Concrete(Columns), A, 28 days 13.63 cu.m. Approx 1-set Approx 1-set
#-1/pouring day #-1/pouring day
900(1)c5 Structural Concrete(Suspended Slab), A, 28 days 2.70 cu.m. Approx 1-set Approx 1-set
#-1/pouring day #-1/pouring day
900(1)c6 Structural Concrete(Beams/Girders), A, 28 days 4.32 cu.m. Approx 1-set Approx 1-set
a. Cement 815.39 bags Q-1 G-1, 1-QT
b. Sand 42.92 cu.m. Q-1; G-1 Q-1; G-1
c. Gravel 85.83 cu.m. Q-1; G-2 EC
d. Water 1.00 ltr Engineer's Certification EC
e. Design Mix with Trial Mix 1.00 ltr #-1 IR
902(1)a Reinforcing Steel(Deformed) Grade 40 5,837.09 kgs. Q-1/size IR
903(2) Formworks and Falseworks 180.16 sq.m. Inspection Report IR IR
CHB Non Load Bearing(including Reinforcing
1046(2)a1 Steel) 100mm 109.35 sq.m. Inspection Report IR IR
a. 100mm thk CHB 1,421.55 pcs Q-1 Q-1
b. Cement 57.96 bags *Q-1 *Q-1
c. Sand 4.37 cu.m. **Q-1, G-1 IR
d. Reinforcing Steel 354.29 kgs. ***Q-1 IR
e. Tie Wire #16 5.47 kgs. Inspection Report IR IR

1003(1)a1 Ceiling Fiber Cement Board, 4.5mm Metal Frame 30.60 sq.m. Inspection Report IR
1032(1)a1 Painting Works, Masonry/Concrete 290.90 sq.m. Inspection Report IR
411(2) Paint 405.00 sq.m. Inspection Report IR

1032(1)c Painting Works, Steel 501.37 sq.m. Inspection Report IR


Prepainted Metal, Sheets Long Span,Rib Type,
1014(1)b2 above 0.427thk/above 0.427 thk) 131.70 sq.m. Inspection Report IR
Fabricated Metal Roofing Accessory gauge 26,
1013(2)a1 Ridge/Hip Rolls 30.00 l.m. Inspection Report IR
Fabricated Metal Roofing Accessory gauge 26,
1013(2)a2 Flashing 146.78 l.m. Inspection Report IR
Fabricated Metal Roofing Accessory gauge 26,
1013(2)b1 Gutters 96.20 l.m. Inspection Report IR
Prepainted Metal Sheets Long Span, above
1014(1)b1 0.427mm, Corrugated Type 647.87 l.m. Inspection Report IR
1047(1) Structural Steel 2.77 l.m. Inspection Report IR

1047(2)a Structural Steel Trusses 10,988.19 kgs. 1-QT 1-QT


1047(2)b Structural Steel Purlins 3,089.91 kgs. 1-QT 1-QT

1047(3)a Metal Structure Accessories(Bolts) 96.00 pcs Inspection Report IR

1047(3)b Metal Structure Accessories(Sagrods) Inspection Report IR

1047(3)c Metal Structure Accessories(Turn Buckle) 24.00 pcs Inspection Report IR


Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

STATUS O F TEST
As of MAY 2023
Physical Accomplishment:
CONTRACT ID: 23ED0074
CONTRACT NAME: Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro

LOCATION:
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES
=

Pay Contract Min. # Total No. of Test


Description/Materials Unit
Item No. Quantity Required On File Balance

1047(5)c Metal Structure Accessories, Cross Bracing 229.80 pcs Inspection Report IR
1047(5d) Metal Structure Accessories, Steel Plates 351.02 L.s. Inspection Report IR IR

1001(9) Storm Drainage and Downspout 1.00 L.s. Inspection Report IR


Conduit Boxes and Fittings(Conduit Works/
1100(10) Conduit Rough-in) 1.00 L.s. Inspection Report IR
1101(33) Wires and Wiring Devices 1.00 L.s. Inspection Report IR
1102(1) Panelboard with Main and Branch Breakers 1.00 L.s. Inspection Report IR
1103(1) Lighting Fixtures and Lamps 1.00 L.s. Inspection Report IR

Prepared by Submitted By:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Materials Engineer Chief, Quality Assurance Section
Republic of the Philippines
OF PUBLIC WORKS AND HIGHWAYS
NTAL DISTRICT ENGINEERING OFFICE

TATUS O F TEST
As of MAY 2023
45.19%

se Building, (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro

=
% of Work
Accomplished

100.00%

48.00%

100.00%

85.23%

100.00%

100.00%
100.00%

78.35%

100.00%

100.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
83.90%

15.36%
100.00%
100.00%
100.00%
100.00%
15.36%

100.00%
100.00%
Republic of the Philippines
OF PUBLIC WORKS AND HIGHWAYS
NTAL DISTRICT ENGINEERING OFFICE

TATUS O F TEST
As of MAY 2023
45.19%

se Building, (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro

=
% of Work
Accomplished

47.86%
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

WEEKLY CERTIFICATE OF QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana,
CONTRACT NAME:
Naujan, Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned project
for the period of MAY 2023.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to
the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

WEEKLY QUALITY ACCOMPLISHMENT


PAY ITEM CONTRACT
PAY ITEM DESCRIPTION UNIT MAY 1-7 MAY 8-14 MAY 15-21 MAY 22-23
NO. QUANTITY

B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.05 0.05 0.05 0.05
Structural Concrete(Footing and Slab on
900(1)c2 58.88 cu.m. 23.065
Fill), A, 28 days
900(1)c4 Structural Concrete(Columns), A, 28 days 13.63 cu.m. 13.630
CHB Non Load Bearing(including
1046(2)a1 109.35 sq.m. 16.80
Reinforcing Steel) 100mm
1047(2)a Structural Steel Trusses 10,988.19 kgs. 7,679.57
1047(2)b Structural Steel Purlins 3,089.91 kgs. 1,079.60 1,079.60
1047(5d) Metal Structure Accessories, Steel Plates 351.02 L.s. 167.99

ROCKY TOM BERNARD S. ROMASANTA EDILBERTO C. GODOY


Materials Engineer Project Engineer
ublic of the Philippines
PUBLIC WORKS AND HIGHWAYS
TAL DISTRICT ENGINEERING OFFICE
alapan City, Oriental Mindoro

E OF QUALITY CONTROL ASSURANCE

nd verification on the work accomplishment on the above mentioned project

aterials and workmanship on the following items of work corresponding to


rd specifications and provisions of the Contract, viz:

WEEKLY QUALITY ACCOMPLISHMENT


TOTAL

0.200

23.065

13.630

16.80
7679.57
2159.20

167.99
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

WEEKLY CERTIFICATE OF QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana,
CONTRACT NAME:
Naujan, Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned project
for the period of APRIL 2023.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to
the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

WEEKLY QUALITY ACCOMPLISHMENT


PAY ITEM CONTRACT
PAY ITEM DESCRIPTION UNIT APRIL 1-7 APRIL 8-14 APRIL 15-21 APRIL 22-31
NO. QUANTITY TOTAL

B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.05 0.05 0.05 0.05 0.200
802(2) Structure Excavation Common Soil 43.53 cu.m. 18.55 18.55
804(1)a Embankment from Structure Excavation 27.90 cu.m. 27.90 27.90
804(1)b Embankment from Common Borrow 165.24 cu.m. 70.16 35.08 105.24
804(4) Gravel Fill 52.07 cu.m. 19.825 19.825 39.650
Structural Concrete(Footing and Slab on
900(1)c2 58.88 cu.m.
Fill), A, 28 days 23.065 23.065
Structural Concrete(Footing Tie Beam),
900(1)c3 6.30 cu.m. 6.30
A, 28 days 6.30
902(1)a Reinforcing Steel(Deformed) Grade 40 5,837.09 kgs. 2,506.66 2,506.66 5013.32
903(2) Formworks and Falseworks 180.16 sq.m. 75.58 75.58 151.16

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

WEEKLY CERTIFICATE OF QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana,
CONTRACT NAME:
Naujan, Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned project
for the period of MARCH 2023.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to
the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

WEEKLY QUALITY ACCOMPLISHMENT


PAY ITEM CONTRACT
PAY ITEM DESCRIPTION UNIT MARCH 30-31
NO. QUANTITY

B.5 Project Billbard/Signboard 1.00 ea 1.00


B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.080
801(1) Removal of Structures and Obstruction 1.00 L.s. 1.000
802(2) Structure Excavation Common Soil 43.53 cu.m. 18.55

ROCKY TOM BERNARD S. ROMASANTA EDILBERTO C. GODOY


Materials Engineer Project Engineer
ublic of the Philippines
PUBLIC WORKS AND HIGHWAYS
TAL DISTRICT ENGINEERING OFFICE
alapan City, Oriental Mindoro

E OF QUALITY CONTROL ASSURANCE

nd verification on the work accomplishment on the above mentioned project

aterials and workmanship on the following items of work corresponding to


rd specifications and provisions of the Contract, viz:

WEEKLY QUALITY ACCOMPLISHMENT


TOTAL

1.00

0.080

1.00

18.55
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

MONTHLY CERTIFICATE QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Naujan,
CONTRACT NAME:
Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned project
for the period of MARCH 2023.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to
the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

PAY ITEM CONTRACT QUANTITY


PAY ITEM DESCRIPTION QUANTITY UNIT
NO.
PREVIOUS THIS PERIOD TOTAL BALANCE

B.3 Permits and Clearances 1.00 L.s. - 1.00


B.5 Project Billbard/Signboard 1.00 ea 1.00 1.00 -
B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.08 0.08 0.92
801(1) Removal of Structures and Obstruction 1.00 L.s. 1.00 1.00 -
802(2) Structure Excavation Common Soil 43.53 cu.m. 18.55 18.55 24.98
804(1)a Embankment from Structure Excavation 27.90 cu.m. - 27.90
804(1)b Embankment from Common Borrow 165.24 cu.m. - 165.24
804(4) Gravel Fill 52.07 cu.m. - 52.07
Structural Concrete(Footing and Slab on
900(1)c2 58.88 cu.m. - 58.88
Fill), A, 28 days
Structural Concrete(Footing Tie Beam), A,
900(1)c3 6.30 cu.m. - 6.30
28 days

900(1)c4 Structural Concrete(Columns), A, 28 days 13.63 cu.m. - 13.63

Structural Concrete(Suspended Slab), A,


900(1)c5 2.70 cu.m. - 2.70
28 days
Structural Concrete(Beams/Girders), A, 28
900(1)c6 4.32 cu.m. - 4.32
days
902(1)a Reinforcing Steel(Deformed) Grade 40 5,837.09 kgs. - 5,837.09
903(2) Formworks and Falseworks 180.16 sq.m. - 180.16
1046(2)a1 CHB Non Load Bearing(including Reinforcin 109.35 sq.m. - 109.35
Ceiling Fiber Cement Board, 4.5mm Metal
1003(1)a1 30.60 sq.m. - 30.60
Frame
1032(1)a1 Painting Works, Masonry/Concrete 290.90 sq.m. - 290.90
411(2) Paint 405.00 sq.m. - 405.00
1032(1)c Painting Works, Steel 501.37 sq.m. - 501.37

Prepainted Metal, Sheets Long Span,Rib


1014(1)b2 131.70 sq.m. - 131.70
Type, above 0.427thk/above 0.427 thk)
Fabricated Metal Roofing Accessory gauge
1013(2)a1 30.00 l.m. - 30.00
26, Ridge/Hip Rolls
Fabricated Metal Roofing Accessory gauge
1013(2)a2 146.78 l.m. - 146.78
26, Flashing
Fabricated Metal Roofing Accessory gauge
1013(2)b1 96.20 l.m. - 96.20
26, Gutters
Prepainted Metal Sheets Long Span, above
1014(1)b1 647.87 l.m. - 647.87
0.427mm, Corrugated Type
1047(1) Structural Steel 2.77 l.m. - 2.77
1047(2)a Structural Steel Trusses 10,988.19 kgs. - 10,988.19
1047(2)b Structural Steel Purlins 3,089.91 kgs. - 3,089.91
1047(3)a Metal Structure Accessories(Bolts) 96.00 pcs - 96.00
1047(3)b Metal Structure Accessories(Sagrods) 156.00 pcs - 156.00
1047(3)c Metal Structure Accessories(Turn Buckle) 24.00 pcs - 24.00
1047(5)c Metal Structure Accessories, Cross Bracing 229.80 pcs - 229.80
1047(5d) Metal Structure Accessories, Steel Plates 351.02 L.s. - 351.02
1001(9) Storm Drainage and Downspout 1.00 L.s. - 1.00
Conduit Boxes and Fittings(Conduit Works/
1100(10) 1.00 L.s. - 1.00
Conduit Rough-in)
1101(33) Wires and Wiring Devices 1.00 L.s. - 1.00
1102(1) Panelboard with Main and Branch Breakers 1.00 L.s. - 1.00
1103(1) Lighting Fixtures and Lamps 1.00 L.s. - 1.00

Note : The aforementioned quantities may serve as reference for payment/billing purposes but may not be equal to the Statement of Work
Accomplished for billing depending on the intended/requested quantity to be billed by the Contractor evaluated as reasonable for payment

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

MONTHLY CERTIFICATE QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Naujan,
CONTRACT NAME:
Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned project
for the period of APRIL 2023.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to
the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

PAY ITEM CONTRACT QUANTITY


PAY ITEM DESCRIPTION QUANTITY UNIT
NO.
PREVIOUS THIS PERIOD TOTAL BALANCE

B.3 Permits and Clearances 1.00 L.s. - - 1.00


B.5 Project Billbard/Signboard 1.00 ea 1.00 1.00 -
B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.08 0.20 0.28 0.72
801(1) Removal of Structures and Obstruction 1.00 L.s. 1.00 - 1.00 -
802(2) Structure Excavation Common Soil 43.53 cu.m. 18.55 18.55 37.10 6.43
804(1)a Embankment from Structure Excavation 27.90 cu.m. - 27.90 27.90 -
804(1)b Embankment from Common Borrow 165.24 cu.m. - 105.24 105.24 60.00
804(4) Gravel Fill 52.07 cu.m. - 39.65 39.65 12.42
Structural Concrete(Footing and Slab on
900(1)c2 58.88 cu.m. - 23.065 23.065 35.82
Fill), A, 28 days
Structural Concrete(Footing Tie Beam), A,
900(1)c3 6.30 cu.m. - 6.30 6.30 -
28 days
900(1)c4 Structural Concrete(Columns), A, 28 days 13.63 cu.m. - - - 13.63
Structural Concrete(Suspended Slab), A,
900(1)c5 2.70 cu.m. - - - 2.70
28 days
Structural Concrete(Beams/Girders), A, 28
900(1)c6 4.32 cu.m. - - - 4.32
days
902(1)a Reinforcing Steel(Deformed) Grade 40 5,837.09 kgs. - 5,013.32 5,013.32 823.77
903(2) Formworks and Falseworks 180.16 sq.m. - 151.16 151.16 29.00
CHB Non Load Bearing(including
1046(2)a1 109.35 sq.m. - - - 109.35
Reinforcing
Ceiling FiberSteel)
Cement100mm
Board, 4.5mm Metal
1003(1)a1 30.60 sq.m. - - - 30.60
Frame
1032(1)a1 Painting Works, Masonry/Concrete 290.90 sq.m. - - - 290.90
411(2) Paint 405.00 sq.m. - - - 405.00
1032(1)c Painting Works, Steel 501.37 sq.m. - - - 501.37
Prepainted Metal, Sheets Long Span,Rib
1014(1)b2 131.70 sq.m. - - - 131.70
Type, above 0.427thk/above 0.427 thk)
Fabricated Metal Roofing Accessory gauge
1013(2)a1 30.00 l.m. - - - 30.00
26, Ridge/Hip Rolls
Fabricated Metal Roofing Accessory gauge
1013(2)a2 146.78 l.m. - - - 146.78
26, Flashing
Fabricated Metal Roofing Accessory gauge
1013(2)b1 96.20 l.m. - - - 96.20
26, Gutters
Prepainted Metal Sheets Long Span, above
1014(1)b1 647.87 l.m. - - - 647.87
0.427mm, Corrugated Type
1047(1) Structural Steel 2.77 l.m. - - - 2.77

1047(2)b Structural Steel Purlins 3,089.91 kgs. - - - 3,089.91

1047(3)a Metal Structure Accessories(Bolts) 96.00 pcs - - - 96.00

1047(3)b Metal Structure Accessories(Sagrods) 156.00 pcs - - - 156.00

1047(3)c Metal Structure Accessories(Turn Buckle) 24.00 pcs - - - 24.00

1047(5)c Metal Structure Accessories, Cross Bracing 229.80 pcs - - - 229.80

1047(5d) Metal Structure Accessories, Steel Plates 351.02 L.s. - - - 351.02

1001(9) Storm Drainage and Downspout 1.00 L.s. - - - 1.00


Conduit Boxes and Fittings(Conduit Works/
1100(10) 1.00 L.s. - - - 1.00
Conduit Rough-in)
1101(33) Wires and Wiring Devices 1.00 L.s. - - - 1.00
1102(1) Panelboard with Main and Branch Breakers 1.00 L.s. - - - 1.00
1103(1) Lighting Fixtures and Lamps 1.00 L.s. - - - 1.00

Note : The aforementioned quantities may serve as reference for payment/billing purposes but may not be equal to the Statement of Work
Accomplished for billing depending on the intended/requested quantity to be billed by the Contractor evaluated as reasonable for payment
ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO
Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

MONTHLY CERTIFICATE QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Naujan,
CONTRACT NAME:
Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned project
for the period of MAY 2023.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to
the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

PAY ITEM CONTRACT QUANTITY


PAY ITEM DESCRIPTION QUANTITY UNIT
NO.
PREVIOUS THIS PERIOD TOTAL BALANCE

B.3 Permits and Clearances 1.00 L.s. - - 1.00


B.5 Project Billbard/Signboard 1.00 ea 1.00 1.00 -
B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.28 0.20 0.48 0.52
801(1) Removal of Structures and Obstruction 1.00 L.s. 1.00 - 1.00 -
802(2) Structure Excavation Common Soil 43.53 cu.m. 37.10 - 37.10 6.43
804(1)a Embankment from Structure Excavation 27.90 cu.m. 27.90 - 27.90 -
804(1)b Embankment from Common Borrow 165.24 cu.m. 105.24 - 105.24
804(4) Gravel Fill 52.07 cu.m. 39.650 - 39.65 12.42
Structural Concrete(Footing and Slab on
900(1)c2 58.88 cu.m. 23.065 23.065 46.13 12.75
Fill), A, 28 days
Structural Concrete(Footing Tie Beam), A,
900(1)c3 6.30 cu.m. 6.30 - 6.30 -
28 days

900(1)c4 Structural Concrete(Columns), A, 28 days 13.63 cu.m. - 13.63 13.63 -

Structural Concrete(Suspended Slab), A,


900(1)c5 2.70 cu.m. - - - 2.70
28 days
Structural Concrete(Beams/Girders), A, 28
900(1)c6 4.32 cu.m. - - - 4.32
days
902(1)a Reinforcing Steel(Deformed) Grade 40 5,837.09 kgs. 5,013.32 - 5,013.32 823.77
903(2) Formworks and Falseworks 180.16 sq.m. 151.16 - 151.16 29.00
CHB Non Load Bearing(including
1046(2)a1 109.35 sq.m. - 16.80 16.80 92.55
Reinforcing Steel) 100mm
Ceiling Fiber Cement Board, 4.5mm Metal
1003(1)a1 30.60 sq.m. - - - 30.60
Frame
1032(1)a1 Painting Works, Masonry/Concrete 290.90 sq.m. - - - 290.90
411(2) Paint 405.00 sq.m. - - - 405.00
1032(1)c Painting Works, Steel 501.37 sq.m. - - - 501.37
Prepainted Metal, Sheets Long Span,Rib
1014(1)b2 131.70 sq.m. - - - 131.70
Type, above 0.427thk/above 0.427 thk)
Fabricated Metal Roofing Accessory gauge
1013(2)a1 30.00 l.m. - - - 30.00
26, Ridge/Hip Rolls
Fabricated Metal Roofing Accessory gauge
1013(2)a2 146.78 l.m. - - - 146.78
26, Flashing
Fabricated Metal Roofing Accessory gauge
1013(2)b1 96.20 l.m. - - - 96.20
26, Gutters
Prepainted Metal Sheets Long Span, above
1014(1)b1 647.87 l.m. - - - 647.87
0.427mm, Corrugated Type
1047(1) Structural Steel 2.77 l.m. - - - 2.77
1047(2)a Structural Steel Trusses 10,988.19 kgs. - 7,679.57 7,679.57 3,308.62
1047(2)b Structural Steel Purlins 3,089.91 kgs. - 2,159.20 2,159.20 930.71
1047(3)a Metal Structure Accessories(Bolts) 96.00 pcs - - - 96.00
1047(3)b Metal Structure Accessories(Sagrods) 156.00 pcs - - - 156.00
1047(3)c Metal Structure Accessories(Turn Buckle) 24.00 pcs - - - 24.00

1047(5)c Metal Structure Accessories, Cross Bracing 229.80 pcs - - - 229.80

1047(5d) Metal Structure Accessories, Steel Plates 351.02 L.s. - 167.99 167.99 183.03

1001(9) Storm Drainage and Downspout 1.00 L.s. - - - 1.00


Conduit Boxes and Fittings(Conduit Works/
1100(10) 1.00 L.s. - - - 1.00
Conduit Rough-in)
1101(33) Wires and Wiring Devices 1.00 L.s. - - - 1.00
1102(1) Panelboard with Main and Branch Breakers 1.00 L.s. - - - 1.00
1103(1) Lighting Fixtures and Lamps 1.00 L.s. - - - 1.00
Note : The aforementioned quantities may serve as reference for payment/billing purposes but may not be equal to the Statement of Work
Accomplished for billing depending on the intended/requested quantity to be billed by the Contractor evaluated as reasonable for payment

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: April 17, 2023

Pouring Permit Report


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Contractor : MIDR CONSTRUCTION AND SUPPLIES
Part of Structure Estimated Volume : 23.065 cu.m.
to be Poured : Footing
Station Limits/Section: -
Time of Pouring : 8:00am - 11:30am
Date of Pouring : April 17, 2023

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator Field Density Test
X Protective Covering Materials X Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI April 17, 2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

Project Inspector : Date


REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

CARLO C. MANALO
Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: April 24, 2023

Pouring Permit Report


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Contractor : MIDR CONSTRUCTION AND SUPPLIES
Part of Structure Estimated Volume : 6.30 cu.m.
to be Poured : Tie Beam
Station Limits/Section: -
Time of Pouring : 1:00pm - 4:30pm
Date of Pouring : April 24, 2023

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator Field Density Test
X Protective Covering Materials X Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI April 24, 2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

Project Inspector : Date


REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

CARLO C. MANALO
Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: May 1, 2023

Pouring Permit Report


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Contractor : MIDR CONSTRUCTION AND SUPPLIES
Part of Structure Estimated Volume : 13.63 cu.m.
to be Poured : Column
Station Limits/Section: -
Time of Pouring : 8:00am - 11:30am
Date of Pouring : May 1, 2023

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator Field Density Test
X Protective Covering Materials X Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI May 1, 2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

Project Inspector : Date


REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

CARLO C. MANALO
Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: May 8, 2023

Pouring Permit Report


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Contractor : MIDR CONSTRUCTION AND SUPPLIES
Part of Structure Estimated Volume : 23.07 cu.m.
to be Poured : SOF
Station Limits/Section: -
Time of Pouring : 8:00am - 4:30pm
Date of Pouring : May 8, 2023

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI May 8, 2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

Project Inspector : Date


REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

CARLO C. MANALO
Project Engineer
REPORT ON CONCRETE WORKS

Lab. Number: RCW-MASAGAN-900-01

Project:
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: Footing

Station/Station Limits:

==================================================================

Date & Time of Pouring: April 17, 2023 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 14.99 liters
Fine Aggregates: 97.04 cu.m. Coarse Aggregates: 113.05 cu.m.
Cement used(TOTAL): 220 Bags Vol. of Concrete Poured: 23.065 cu.m.
Admixture: None cc/ bag of cement

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - 9.54 9.50
Water, L/bag - - - - - - - - - - - - - - . 14.99 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 MM 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: Footing - 1 , 2, 3,4 & 5
Quantity Represented: 23.07 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES April 17, 2023
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-MASAGANA-900-02

Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: Tie Beam

Station/Station Limits:

==================================================================

Date & Time of Pouring: April 24, 2023 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 14.99 liters
Fine Aggregates: 97.04 cu.m. Coarse Aggregates: 113.05 cu.m.
Cement used(TOTAL): 60 Bags Vol. of Concrete Poured: 6.30 cu.m.
Admixture: None cc/ bag of cement

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - 9.52 9.50
Water, L/bag - - - - - - - - - - - - - - . 14.99 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 MM 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: TB - 1 , 2,3,4 & 5


Quantity Represented: 6.30 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES April 24, 2023
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-CALUBAYAN-900-03

Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: Column

Station/Station Limits:

==================================================================

Date & Time of Pouring: May 1, 2023 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 14.99 liters
Fine Aggregates: 97.04 cu.m. Coarse Aggregates: 113.05 cu.m.
Cement used(TOTAL): 130 Bags Vol. of Concrete Poured: 13.63 cu.m.
Admixture: None cc/ bag of cement

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - 9.54 9.50
Water, L/bag - - - - - - - - - - - - - - . 14.99 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 MM 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: Column - 1 ,2,3,4 & 5
Quantity Represented: 13.63 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES May 1, 2023
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-CALUBAYAN-900-05


23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project: Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: SOF

Station/Station Limits:

==================================================================

Date & Time of Pouring: May 8, 2023 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 14.99 liters
Fine Aggregates: 97.04 cu.m. Coarse Aggregates: 113.05 cu.m.
Cement used(TOTAL): 220 Bags Vol. of Concrete Poured: 23.07 cu.m.
Admixture: None cc/ bag of cement

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - 9.54 9.50
Water, L/bag - - - - - - - - - - - - - - . 14.99 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 MM 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: Sof -1,2,3,4 & 5
Quantity Represented: 23.07 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES May 8, 2023
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: April 17, 2023


LAB. NUMBER: MASAGANA-TM-01
PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES April 10, 2023
(Name and Designation) (Office) (Date)
TESTED BY: MQC PERSONNEL DPWH April 17, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC PERSONNEL DPWH April 17, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
TM-A TRIAL MIX 4/10/2023 7 2451 2400
TM-B TRIAL MIX 4/10/2023 7 2465 2400
TM-C TRIAL MIX 4/10/2023 7 2494 2400
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

MA. VIVIENE M. TOLENTINO MERCEDES G. ASPI


Laboratory Technician I Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: May 15, 2023


LAB. NUMBER: MASAGANA-CT-01
PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES April 17, 2023
(Name and Designation) (Office) (Date)
TESTED BY: MQC PERSONNEL DPWH May 15, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC PERSONNEL DPWH May 15, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
FOOTING-1 FOOTING 4/17/2023 28 3060 3000
FOOTING-2 FOOTING 4/17/2023 28 3091 3000
FOOTING-3 FOOTING 4/17/2023 28 3062 3000
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

MA. VIVIENE M. TOLENTINO MERCEDES G. ASPI


Laboratory Technician I Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: May 24, 2023


LAB. NUMBER: MASAGANA-CT-02
PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES April 24, 2023
(Name and Designation) (Office) (Date)
TESTED BY: MQC PERSONNEL DPWH May 22, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC PERSONNEL DPWH May 22, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
TB-1 TIE BEAM 4/24/2023 28 3074 3000
TB-2 TIE BEAM 4/24/2023 28 3103 3000
TB-3 TIE BEAM 4/24/2023 28 3089 3000

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

MA. VIVIENE M. TOLENTINO MERCEDES G. ASPI


Laboratory Technician I Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: May 29, 2023


LAB. NUMBER: MASAGANA-CT-03
PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES May 1, 2023
(Name and Designation) (Office) (Date)
TESTED BY: MQC PERSONNEL DPWH May 29, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC PERSONNEL DPWH May 29, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
COL-1 COLUMN 5/1/2023 28 3103 3000
COL-2 COLUMN 5/1/2023 28 3089 3000
COL-3 COLUMN 5/1/2023 28 3118 3000
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

MA. VIVIENE M. TOLENTINO MERCEDES G. ASPI


Laboratory Technician I Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: June 5, 2023


LAB. NUMBER: MASAGANA-CT-05
PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES May 8, 2023
(Name and Designation) (Office) (Date)
TESTED BY: MQC PERSONNEL DPWH June 5, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC PERSONNEL DPWH June 5, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
SOF-1 SOF 5/8/2023 28 3118 3000
SOF-2 SOF 5/8/2023 28 3093 3000
SOF-3 SOF 5/8/2023 28 3044 3000
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

MA. VIVIENE M. TOLENTINO MERCEDES G. ASPI


Laboratory Technician I Engineer III
V Date Poured Date Requested
TM Monday, April 10, 2023 Monday, April 10, 2023
Footing 23.065 Monday, April 17, 2023 Monday, April 17, 2023
Tie Beam 6.30 Monday, April 24, 2023 Monday, April 24, 2023
Column 13.63 Monday, May 1, 2023 Monday, May 1, 2023
Column Saturday, December 30, 1899
SOF 23.065 Monday, May 8, 2023 Monday, May 8, 2023
Beams Saturday, December 30, 1899
Saturday, December 30, 1899
Saturday, December 30, 1899
Saturday, December 30, 1899
Date Tested
Monday, April 17, 2023
Monday, May 15, 2023
Monday, May 22, 2023
Monday, May 29, 2023
Saturday, January 27, 1900
Monday, June 5, 2023
Saturday, January 27, 1900
Saturday, January 27, 1900
Saturday, January 27, 1900
Saturday, January 27, 1900
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

STATUS O F TEST
As of JUNE 2022
Physical Accomplishment: 34.00%
CONTRACT ID: 23ED0074
Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Naujan,
CONTRACT NAME:
Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

Pay Contract No. of Test % of Work


Description/Materials Unit Min. # Total Required
Item No. Quantity On File Balance Accomplished

B.3 Permits and Clearances 1.00 L.s. Inspection Report IR 100%


B.5 Project Billbard/Signboard 1.00 ea Inspection Report IR 100%
B.7(2) Program 1.00 L.s. Inspection Report IR IR 25%
801(1) Removal of Structures and Obstructi 614.00 L.s. Inspection Report IR 100%

802(2) Structure Excavation Common Soil 72.06 cu.m. Engineer's Certification EC 100%

804(1)a Embankment from Structure Excavation 43.95 cu.m. GPC-1,D-2 GPC-1,D-2 100%
804(1)b Embankment from Common Borrow 115.95 cu.m. GPC-1, D-5 GPC-1, D-5 100%
804(4) Gravel Fill 60.96 cu.m. G-1 G-1 100%
Structural Concrete(Footing and #1/pouring day Approx #1/pouring day #1/pouring day
900(1)c2 Slab on Fill), A, 28 days 65.23 cu.m. 2-sets Approx 2-sets Approx 2-sets 50%
Structural Concrete(Footing Tie #1/pouring day Approx #1/pouring day #1/pouring day
900(1)c3 Beam), A, 28 days 11.89 cu.m. 1-set Approx 1-set Approx 1-set 50%
Structural Concrete(Columns), A, #1/pouring day Approx #1/pouring day #1/pouring day
900(1)c4 28 days 15.48 cu.m. 1-set Approx 1-set Approx 1-set 50%
Structural Concrete(Beams/Girders), A, #1/pouring day Approx #1/pouring day #1/pouring day
900(1)c6 28 days 4.74 cu.m. 1-set Approx 1-set Approx 1-set 50%
a. Cement 925.00 bags 1-QT 1-QT 100%
b. Sand 48.67 cu.m. G-1; 1-QT G-1, 1-QT 100%
c. Gravel 97.34 cu.m. G-2; 1-QT G-2; 1-QT 100%
d. Water L.s. ltr Engineer's Certification EC 100%
e. Design Mix with Trial Mix 1.00 ltr #-1 #-1 100%
Reinforcing Steel(Deformed) Grade
902(1)a 40 7,186.66 kgs. Q-1/size Q-1/size 100%
903(2) Formworks and Falseworks 143.13 sq.m. Inspection Report IR 100%
CHB Non Load Bearing(including
1046(2)a1 Reinforcing Steel) 100mm 382.22 sq.m. Inspection Report IR IR 30%
a. 100mm thk CHB 4,968.86 pcs Q-1 Q-1 100%
b. Cement 202.58 bags *Q-1 *Q-1 100%
c. Sand 15.29 cu.m. **Q-1, G-1 **Q-1, G-1 100%
d. Reinforcing Steel 1,238.39 kgs. ***Q-1 ***Q-1 100%
e. Tie Wire #16 19.11 kgs. Inspection Report IR 30%
1010(4) Wooden Doors and Windows 1.00 L.s. Inspection Report IR 0%
1027(1) Cement Plaster Finish 858.88 sq.m. Inspection Report IR 0%
1051(6) Railing 1.00 L.s. Inspection Report IR 0%
1003(1)a1 Ceiling Fiber Cement Board, 4.5mm 66.01 sq.m. Inspection Report IR 0%
1018(5) Glazed Tiles 67.43 sq.m. Inspection Report IR 0%
1018(2) Unglazed Tiles 72.20 sq.m. Inspection Report IR 0%
1032(1)a Painting Works Masonry/Concrete 858.88 sq.m. Inspection Report IR 0%
1032(1)c Painting Works Steel 567.40 sq.m. Inspection Report IR 0%
Prepainted Metal Sheets, Long
1014(1)b1 Span, 0.427mm, Corrugated Type 706.30 sq.m. Inspection Report IR 0%
Fabricated Metal Roofing
1013(2)b1 Accessory, gauge 26, Gutters 103.20 L.m. Inspection Report IR 0%
Fabricated Metal Roofing
1013(2)a1 Accessory, gauge 26, Ridge/Rolls 27.00 L.m. Inspection Report IR 0%
Fabricated Metal Roofing
1013(2)a2 Accessory, gauge 26, Flashings 149.50 L.m. Inspection Report IR 0%
1047(2)a Structural Steel, Trusses 7,577.54 kgs. 1-QT 1-QT 100%
1047(2)b Structural Steel, Purlins 4,015.42 kgs. 1-QT 1-QT 100%
Metal Structure Accessories(Steel
1047(6) Plates) 772.40 kgs. Inspection Report IR 0%
1047(3)a Metal Structure Accessories, Bolts 98.00 pcs Inspection Report IR 0%
Metal Structure Accessories, Cross
1047(3)d Bracing 32.00 pcs Inspection Report IR 0%
Metal Structure Accessories, Turn
1047(3)c Buckle 64.00 pcs Inspection Report IR 0%
Metal Structure Accessories, Sag
1047(3)b Rods 104.00 pcs Inspection Report IR 0%
1002(27) Plumbing Works 1.00 L.s. Inspection Report IR 0%
1001(11) Septic Vault(Concrete/CHB) 1.00 L.s. Inspection Report IR 0%
Conduit, Boxes and Fittings(conduit
1100(10) Works/Conduit Rough-in) 1.00 L.s. Inspection Report IR 0%
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

STATUS O F TEST
As of JUNE 2022
Physical Accomplishment: 34.00%
CONTRACT ID: 23ED0074
Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Naujan,
CONTRACT NAME:
Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

Pay Contract No. of Test % of Work


Description/Materials Unit Min. # Total Required
Item No. Quantity On File Balance Accomplished
1101(33) Wires and Wiring Devices 1.00 L.s. Inspection Report IR 0%
Panelboard with Main and Branch
1102(1) Breakers 1.00 L.s. Inspection Report IR 0%

Prepared by Submitted By:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Materials Engineer Chief, Quality Assurance Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

MONTHLY CERTIFICATE QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana,
CONTRACT NAME:
Naujan, Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned
project for the period of APRIL 2022.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding
to the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

PAY
CONTRACT QUANTITY
ITEM PAY ITEM DESCRIPTION QUANTITY UNIT
NO. PREVIOUS THIS PERIOD TOTAL BALANCE

B.3 Permits and Clearances 1.00 L.s. 1.00 1.00 -


B.5 Project Billbard/Signboard 1.00 ea 1.00 1.00 -
B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.09 0.09 0.91
801(1) Removal of Structures and Obstruction 614.00 L.s. 614.00 614.00 -
803(1)a Structure Excavation(Common Soil) 72.06 cu.m. - 72.06
Embankment from Road/Structure
804(1)a 43.95 cu.m. - 43.95
Excavation
804(1)b Embankment from Borrow 115.95 cu.m. - 115.95
804(4) Gravel Fill 60.96 cu.m. - 60.96
Structural Concrete(Footings and Slab on
900(1)c2 65.23 cu.m. - 65.23
Fill), Class A, 28 days
Structural Concrete(Footing Tie Beam),
900(1)c3 11.89 cu.m. - 11.89
28 days, A
Structural Concrete(Columns), A, 28
900(1)c4 15.48 cu.m. - 15.48
days
Structural Concrete(Beams/Girders), A,
900(1)c6 4.74 cu.m. - 4.74
28 days
902(1)a1 Reinforcing Steel Deformed, Grade 40 7,186.66 kgs. - 7,186.66
903(2) Forms and Falseworks 143.13 sq.m. - 143.13
1046(2)a1 100mm CHB Non Load Bearing Wall 382.22 sq.m. - 382.22
1010(4) Wooden Doors and Windows 1.00 L.s. - 1.00
Err:509 Err:509 Err:509 Err:509 - Err:509
Ceiling Fiber Cement Board, 4.5mm
1003(1)a1 66.01 sq.m. - 66.01
Metal Frame
Err:509 Err:509 Err:509 Err:509 - Err:509
Err:509 Err:509 Err:509 Err:509 - Err:509
1032(1)a1 Painting Works, Masonry/Concrete 858.88 sq.m. - 858.88
1032(1)c Painting Works, Steel 567.40 sq.m. - 567.40
Prepainted Metal, Sheets Long Span,Rib
1014(1)b2 706.30 sq.m. - 706.30
Type, above 0.427thk/above 0.427 thk)
Fabricated Metal Roofing Accessory
1013(2)a1 103.20 l.m. - 103.20
gauge 26, Ridge/Hip Rolls
Fabricated Metal Roofing Accessory
1013(2)a2 27.00 l.m. - 27.00
gauge 26, Flashing
Fabricated Metal Roofing Accessory
1013(2)b1 26.00 l.m. - 26.00
gauge 26, Gutters
Prepainted Metal Sheets Long Span,
1014(1)b1 647.87 l.m. - 647.87
above 0.427mm, Corrugated Type
1047(2)a Structural Steel Trusses 10,988.19 kgs. - 10,988.19
1047(2)b Structural Steel Purlins 3,089.91 kgs. - 3,089.91
Err:509 Err:509 Err:509 Err:509 - Err:509
1047(3)a Metal Structure Accessories(Bolts) 96.00 pcs - 96.00
1047(3)b Metal Structure Accessories(Sagrods) 156.00 pcs - 156.00

1047(3)c Metal Structure Accessories(Turn Buckle) 24.00 pcs - 24.00


1047(5)c Metal Structure Accessories, Cross Bracin 229.80 pcs - 229.80
1047(5d) Metal Structure Accessories, Steel Plates 1.00 L.s. - 1.00
1001(9) Storm Drainage and Downspout 1.00 L.s. - 1.00
Conduit Boxes and Fittings(Conduit
1100(10) 1.00 L.s. - 1.00
Works/ Conduit Rough-in)
1101(33) Wires and Wiring Devices 1.00 L.s. - 1.00
Panelboard with Main and Branch
1102(1) 1.00 L.s. - 1.00
Breakers
1103(1) Lighting Fixtures and Lamps 1.00 L.s. - 1.00

Note : The aforementioned quantities may serve as reference for payment/billing purposes but may not be equal to the Statement of Work
Accomplished for billing depending on the intended/requested quantity to be billed by the Contractor evaluated as reasonable for payment

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

MONTHLY CERTIFICATE QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana,
CONTRACT NAME:
Naujan, Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned
project for the period of MAY 2022.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding
to the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

PAY
CONTRACT QUANTITY
ITEM PAY ITEM DESCRIPTION QUANTITY UNIT
NO. PREVIOUS THIS PERIOD TOTAL BALANCE

B.3 Permits and Clearances 1.00 L.s. 1.00 1.00 -


B.5 Project Billbard/Signboard 1.00 ea 1.00 1.00 -
B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.09 0.08 0.17 0.83
801(1) Removal of Structures and Obstruction 614.00 L.s. 614.00 614.00 -
803(1)a Structure Excavation(Common Soil) 72.06 cu.m. - 72.06 72.06 -
Embankment from Road/Structure
804(1)a 43.95 cu.m. - - 43.95
Excavation
804(1)b Embankment from Borrow 115.95 cu.m. - - 115.95
804(4) Gravel Fill 60.96 cu.m. - 2.40 2.40 58.56
Structural Concrete(Footings and Slab on
900(1)c2 65.23 cu.m. - 7.20 7.20 58.03
Fill), Class A, 28 days
Structural Concrete(Footing Tie Beam),
900(1)c3 11.89 cu.m. - - 11.89
28 days, A
Structural Concrete(Columns), A, 28
900(1)c4 15.48 cu.m. - - 15.48
days
Structural Concrete(Beams/Girders), A,
900(1)c6 4.74 cu.m. - - 4.74
28 days
902(1)a1 Reinforcing Steel Deformed, Grade 40 7,186.66 kgs. - 2,800.00 2,800.00 4,386.66
903(2) Forms and Falseworks 143.13 sq.m. - - 143.13
1046(2)a1 100mm CHB Non Load Bearing Wall 382.22 sq.m. - - 382.22
1010(4) Wooden Doors and Windows 1.00 L.s. - - 1.00
Err:509 Err:509 Err:509 Err:509 - - Err:509
Ceiling Fiber Cement Board, 4.5mm
1003(1)a1 66.01 sq.m. - - 66.01
Metal Frame
Err:509 Err:509 Err:509 Err:509 - - Err:509
Err:509 Err:509 Err:509 Err:509 - - Err:509
1032(1)a1 Painting Works, Masonry/Concrete 858.88 sq.m. - - 858.88
1032(1)c Painting Works, Steel 567.40 sq.m. - - 567.40
Prepainted Metal, Sheets Long Span,Rib
1014(1)b2 706.30 sq.m. - - 706.30
Type, above 0.427thk/above 0.427 thk)
Fabricated Metal Roofing Accessory
1013(2)a1 103.20 l.m. - - 103.20
gauge 26, Ridge/Hip Rolls
Fabricated Metal Roofing Accessory
1013(2)a2 27.00 l.m. - - 27.00
gauge 26, Flashing
Fabricated Metal Roofing Accessory
1013(2)b1 26.00 l.m. - - 26.00
gauge 26, Gutters
Prepainted Metal Sheets Long Span,
1014(1)b1 647.87 l.m. - - 647.87
above 0.427mm, Corrugated Type
1047(2)a Structural Steel Trusses 10,988.19 kgs. - - 10,988.19
1047(2)b Structural Steel Purlins 3,089.91 kgs. - - 3,089.91
Err:509 Err:509 Err:509 Err:509 - - Err:509
1047(3)a Metal Structure Accessories(Bolts) 96.00 pcs - - 96.00
1047(3)b Metal Structure Accessories(Sagrods) 156.00 pcs - - 156.00

1047(3)c Metal Structure Accessories(Turn Buckle) 24.00 pcs - - 24.00


1047(5)c Metal Structure Accessories, Cross Bracin 229.80 pcs - - 229.80
1047(5d) Metal Structure Accessories, Steel Plates 1.00 L.s. - - 1.00
1001(9) Storm Drainage and Downspout 1.00 L.s. - - 1.00
Conduit Boxes and Fittings(Conduit
1100(10) 1.00 L.s. - - 1.00
Works/ Conduit Rough-in)
1101(33) Wires and Wiring Devices 1.00 L.s. - - 1.00
Panelboard with Main and Branch
1102(1) 1.00 L.s. - - 1.00
Breakers
1103(1) Lighting Fixtures and Lamps 1.00 L.s. - - 1.00

Note : The aforementioned quantities may serve as reference for payment/billing purposes but may not be equal to the Statement of Work
Accomplished for billing depending on the intended/requested quantity to be billed by the Contractor evaluated as reasonable for payment

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

MONTHLY CERTIFICATE QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana,
CONTRACT NAME:
Naujan, Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned
project for the period of JUNE 2022.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding
to the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

PAY
CONTRACT QUANTITY
ITEM PAY ITEM DESCRIPTION QUANTITY UNIT
NO. PREVIOUS THIS PERIOD TOTAL BALANCE

B.3 Permits and Clearances 1.00 L.s. 1.00 1.00 -


B.5 Project Billbard/Signboard 1.00 ea 1.00 1.00 -
B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.17 0.08 0.25 0.75
801(1) Removal of Structures and Obstruction 614.00 L.s. 614.00 614.00 -
803(1)a Structure Excavation(Common Soil) 72.06 cu.m. 72.06 72.06 -
Embankment from Road/Structure
804(1)a 43.95 cu.m. - 43.95 43.95 -
Excavation
804(1)b Embankment from Borrow 115.95 cu.m. - 115.95 115.95
804(4) Gravel Fill 60.96 cu.m. 2.40 58.56 60.96 -
Structural Concrete(Footings and Slab on
900(1)c2 65.23 cu.m. 7.20 58.03 65.23 -
Fill), Class A, 28 days
Structural Concrete(Footing Tie Beam),
900(1)c3 11.89 cu.m. - 11.89 11.89 -
28 days, A
Structural Concrete(Columns), A, 28
900(1)c4 15.48 cu.m. - 15.48 15.48 -
days
Structural Concrete(Beams/Girders), A,
900(1)c6 4.74 cu.m. - 4.74 4.74 -
28 days
902(1)a1 Reinforcing Steel Deformed, Grade 40 7,186.66 kgs. 2,800.00 4,386.66 7,186.66 -
903(2) Forms and Falseworks 143.13 sq.m. - 143.13 143.13 -
1046(2)a1 100mm CHB Non Load Bearing Wall 382.22 sq.m. - 114.67 114.67 267.55
1010(4) Wooden Doors and Windows 1.00 L.s. - - 1.00
Err:509 Err:509 Err:509 Err:509 - - Err:509
Ceiling Fiber Cement Board, 4.5mm
1003(1)a1 66.01 sq.m. - - 66.01
Metal Frame
Err:509 Err:509 Err:509 Err:509 - - Err:509
Err:509 Err:509 Err:509 Err:509 - - Err:509
1032(1)a1 Painting Works, Masonry/Concrete 858.88 sq.m. - - 858.88
1032(1)c Painting Works, Steel 567.40 sq.m. - - 567.40
Prepainted Metal, Sheets Long Span,Rib
1014(1)b2 706.30 sq.m. - - 706.30
Type, above 0.427thk/above 0.427 thk)
Fabricated Metal Roofing Accessory
1013(2)a1 103.20 l.m. - - 103.20
gauge 26, Ridge/Hip Rolls
Fabricated Metal Roofing Accessory
1013(2)a2 27.00 l.m. - - 27.00
gauge 26, Flashing
Fabricated Metal Roofing Accessory
1013(2)b1 26.00 l.m. - - 26.00
gauge 26, Gutters
Prepainted Metal Sheets Long Span,
1014(1)b1 647.87 l.m. - - 647.87
above 0.427mm, Corrugated Type
1047(2)a Structural Steel Trusses 10,988.19 kgs. - - 10,988.19
1047(2)b Structural Steel Purlins 3,089.91 kgs. - - 3,089.91
Err:509 Err:509 Err:509 Err:509 - - Err:509
1047(3)a Metal Structure Accessories(Bolts) 96.00 pcs - - 96.00
1047(3)b Metal Structure Accessories(Sagrods) 156.00 pcs - - 156.00

1047(3)c Metal Structure Accessories(Turn Buckle) 24.00 pcs - - 24.00


1047(5)c Metal Structure Accessories, Cross Bracin 229.80 pcs - - 229.80
1047(5d) Metal Structure Accessories, Steel Plates 1.00 L.s. - - 1.00
1001(9) Storm Drainage and Downspout 1.00 L.s. - - 1.00
Conduit Boxes and Fittings(Conduit
1100(10) 1.00 L.s. - - 1.00
Works/ Conduit Rough-in)
1101(33) Wires and Wiring Devices 1.00 L.s. - - 1.00
Panelboard with Main and Branch
1102(1) 1.00 L.s. - - 1.00
Breakers
1103(1) Lighting Fixtures and Lamps 1.00 L.s. - - 1.00

Note : The aforementioned quantities may serve as reference for payment/billing purposes but may not be equal to the Statement of Work
Accomplished for billing depending on the intended/requested quantity to be billed by the Contractor evaluated as reasonable for payment

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

MONTHLY CERTIFICATE QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana,
CONTRACT NAME:
Naujan, Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned
project for the period of JUNE 2022.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding
to the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

PAY
CONTRACT QUANTITY
ITEM PAY ITEM DESCRIPTION QUANTITY UNIT
NO. PREVIOUS THIS PERIOD TOTAL BALANCE

B.3 Permits and Clearances 1.00 L.s. 1.00 1.00 -


B.5 Project Billbard/Signboard 1.00 ea 1.00 1.00 -
B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.25 0.25 0.75
801(1) Removal of Structures and Obstruction 614.00 L.s. 614.00 614.00 -
803(1)a Structure Excavation(Common Soil) 72.06 cu.m. 72.06 72.06 -
Embankment from Road/Structure
804(1)a 43.95 cu.m. 43.95 43.95 -
Excavation
804(1)b Embankment from Borrow 115.95 cu.m. 115.95 115.95 -
804(4) Gravel Fill 60.96 cu.m. 60.96 60.96 -
Structural Concrete(Footings and Slab on
900(1)c2 65.23 cu.m. 65.23 65.23 -
Fill), Class A, 28 days
Structural Concrete(Footing Tie Beam),
900(1)c3 11.89 cu.m. 11.89 11.89 -
28 days, A
Structural Concrete(Columns), A, 28
900(1)c4 15.48 cu.m. 15.48 15.48 -
days
Structural Concrete(Beams/Girders), A,
900(1)c6 4.74 cu.m. 4.74 4.74 -
28 days
902(1)a1 Reinforcing Steel Deformed, Grade 40 7,186.66 kgs. 7,186.66 7,186.66 -
903(2) Forms and Falseworks 143.13 sq.m. 143.13 143.13 -
1046(2)a1 100mm CHB Non Load Bearing Wall 382.22 sq.m. 114.67 114.67 267.55
1010(4) Wooden Doors and Windows 1.00 L.s. - - 1.00
Err:509 Err:509 Err:509 Err:509 - - Err:509
Ceiling Fiber Cement Board, 4.5mm
1003(1)a1 66.01 sq.m. - - 66.01
Metal Frame
Err:509 Err:509 Err:509 Err:509 - - Err:509
Err:509 Err:509 Err:509 Err:509 - - Err:509
1032(1)a1 Painting Works, Masonry/Concrete 858.88 sq.m. - - 858.88
1032(1)c Painting Works, Steel 567.40 sq.m. - - 567.40
Prepainted Metal, Sheets Long Span,Rib
1014(1)b2 706.30 sq.m. - - 706.30
Type, above 0.427thk/above 0.427 thk)
Fabricated Metal Roofing Accessory
1013(2)a1 103.20 l.m. - - 103.20
gauge 26, Ridge/Hip Rolls
Fabricated Metal Roofing Accessory
1013(2)a2 27.00 l.m. - - 27.00
gauge 26, Flashing
Fabricated Metal Roofing Accessory
1013(2)b1 26.00 l.m. - - 26.00
gauge 26, Gutters
Prepainted Metal Sheets Long Span,
1014(1)b1 647.87 l.m. - - 647.87
above 0.427mm, Corrugated Type
1047(2)a Structural Steel Trusses 10,988.19 kgs. - - 10,988.19
1047(2)b Structural Steel Purlins 3,089.91 kgs. - - 3,089.91
Err:509 Err:509 Err:509 Err:509 - - Err:509
1047(3)a Metal Structure Accessories(Bolts) 96.00 pcs - - 96.00
1047(3)b Metal Structure Accessories(Sagrods) 156.00 pcs - - 156.00

1047(3)c Metal Structure Accessories(Turn Buckle) 24.00 pcs - - 24.00


1047(5)c Metal Structure Accessories, Cross Bracin 229.80 pcs - - 229.80
1047(5d) Metal Structure Accessories, Steel Plates 1.00 L.s. - - 1.00
1001(9) Storm Drainage and Downspout 1.00 L.s. - - 1.00
Conduit Boxes and Fittings(Conduit
1100(10) 1.00 L.s. - - 1.00
Works/ Conduit Rough-in)
1101(33) Wires and Wiring Devices 1.00 L.s. - - 1.00
Panelboard with Main and Branch
1102(1) 1.00 L.s. - - 1.00
Breakers
1103(1) Lighting Fixtures and Lamps 1.00 L.s. - - 1.00

Note : The aforementioned quantities may serve as reference for payment/billing purposes but may not be equal to the Statement of Work
Accomplished for billing depending on the intended/requested quantity to be billed by the Contractor evaluated as reasonable for payment

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

WEEKLY CERTIFICATE OF QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana,
CONTRACT NAME:
Naujan, Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned
project for the period of April 2022.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to
the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

WEEKLY QUALITY ACCOMPLISHMENT


PAY CONTRACT
PAY ITEM DESCRIPTION UNIT April 6-15 April 16-22 April 23-30
ITEM NO. QUANTITY TOTAL

B.3 Permits and Clearances 1.00 L.s. 1.00 1.00


B.5 Project Billbard/Signboard 1.00 ea 1.00 1.00
B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.03 0.03 0.03 0.09
Removal of Structures and
801(1) 614.00 L.s. 205.00 205.00 204.00 614.00
Obstruction

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

WEEKLY CERTIFICATE OF QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana,
CONTRACT NAME:
Naujan, Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned
project for the period of May 2022.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to
the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

WEEKLY QUALITY ACCOMPLISHMENT


PAY CONTRACT
PAY ITEM DESCRIPTION UNIT May 1-7 May 8-15 May 16-22 May 23-31
ITEM NO. QUANTITY TOTAL

B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.02 0.02 0.02 0.02 0.08
803(1)a Structure Excavation(Common Soil) 72.06 cu.m. 36.03 36.03 72.06
804(4) Gravel Fill 60.96 cu.m. 2.40 2.40
Structural Concrete(Footing and Slab
900(1)c2 65.23 cu.m. 7.20
on Fill), A, 28 days 7.20
902(1)a Reinforcing Steel(Deformed) Grade 40 7186.66 kgs. 1,400.00 1,400.00
2800.00

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

WEEKLY CERTIFICATE OF QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana,
CONTRACT NAME:
Naujan, Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned
project for the period of June 2022.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to
the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

WEEKLY QUALITY ACCOMPLISHMENT


PAY CONTRACT
PAY ITEM DESCRIPTION UNIT June 1-7 June 8-15 June 16-22 June 23-30
ITEM NO. QUANTITY TOTAL

B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.02 0.02 0.02 0.02 0.08
Embankment from Road/Structure
804(1)a 43.95 cu.m. 20.00 23.95 43.95
Excavation
804(1)b Embankment from Borrow 115.95 cu.m. 50.00 65.95 115.95
804(4) Gravel Fill 60.96 cu.m. 58.56 58.56
Structural Concrete(Footing and Slab
900(1)c2 65.23 cu.m. 58.03 58.03
on Fill), A, 28 days
Structural Concrete(Footing Tie
900(1)c3 11.89 cu.m. 11.89 11.89
Beam), A, 28 days
Structural Concrete(Columns), A, 28
900(1)c4 15.48 cu.m. 15.48 15.48
days
Structural Concrete(Beams/Girders),
900(1)c6 4.74 cu.m. 4.74 4.74
A, 28 days
902(1)a Reinforcing Steel(Deformed) Grade 40 7186.66 kgs. 1,400.00 1,400.00 1,586.66 4386.66
903(2) Formworks and Falseworks 143.13 sq.m. 45.00 45.00 53.13 143.13
CHB Non Load Bearing(including
1046(2)a1 382.22 sq.m. 25.00 25.00 30.00 34.67 114.67
Reinforcing Steel) 100mm

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

WEEKLY CERTIFICATE OF QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana,
CONTRACT NAME:
Naujan, Oriental Mindoro
LOCATION: Naujan, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned
project for the period of June 2022.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to
the quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

WEEKLY QUALITY ACCOMPLISHMENT


PAY CONTRACT
PAY ITEM DESCRIPTION UNIT June 1-7 June 8-15 June 16-22 June 22-30
ITEM NO. QUANTITY TOTAL

B.7(2) Occupational Safety & Health Program 1.00 L.s. 0.02 0.02 0.01 0.01 0.06
804(4) Gravel Fill 48.47 cu.m. 11.45 11.45
Structural Concrete(Footings and Slab
900(1)c2 86.95 cu.m. 16.93 18.51 18.51 53.95
on Fill), Class A, 28 days
902(1)a1 Reinforcing Steel Deformed, Grade 40 56520.15 kgs. 3,000.00 2,909.56
5909.56
1000(1) Soil Poisoning 318.00 L 318.0000

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Project Data Report

NAME OF PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered


Court) at Barangay Masagana, Naujan, Oriental Mindoro

FUND: GAA 2023

LOCATION / PROVINCE: Naujan, Oriental Mindoro

CONTRACT AMOUNT: P 4,836,135.31

CONTRACTOR: MIDR CONSTRUCTION & SUPPLIES

EFF. OF CONTRACT: March 30, 2023

CONTRACT TIME: 105 Calendar Days

PREPARED BY: CHECKED BY:

ROCKY TOM S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer III

NOTED BY:

SALVADOR E. ABAD
District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

MATERIALS INSPECTION REPORT

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at
CONTRACT NAME:
Barangay Masagana, Naujan, Oriental Mindoro

LOCATION : Naujan, Oriental Mindoro


KIND OF MATERIALS: Structural Steel Purlins

ITEM NO. INSPECTED: 1047(2)b DATE: 11/16/2022

PROPOSED USED:

REMARKS/RECOMMENDATION:

Inspected by:

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

MATERIALS INSPECTION REPORT

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at
CONTRACT NAME:
Barangay Masagana, Naujan, Oriental Mindoro

LOCATION : Naujan, Oriental Mindoro


KIND OF MATERIALS: Structural Concrete Class A, 20.68 Mpa
lumber, marine plywood and assorted CWN

ITEM NO. INSPECTED: 311(1)b1 DATE: 4/8/2022

PROPOSED USED: for concreting works

REMARKS/RECOMMENDATION:

Inspected by:

CARLO C. MANALO ROY TRISTAN A. BUHAT


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

MATERIALS INSPECTION REPORT

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at
CONTRACT NAME:
Barangay Masagana, Naujan, Oriental Mindoro

LOCATION : Clearing and Grubbing


KIND OF MATERIALS:

ITEM NO. INSPECTED: 800(1) DATE: 3/2/2022

PROPOSED USED: for Field Office of the Engineer

REMARKS/RECOMMENDATION:

Inspected by:

CARLO C. MANALO ROY TRISTAN A. BUHAT


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CERTIFICATION

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at
CONTRACT NAME:
Barangay Masagana, Naujan, Oriental Mindoro

LOCATION : Naujan, Oriental Mindoro


KIND OF MATERIALS: Structure Excavation(Common Soil)

This is to certify that the 72.06 cu.m. waste materials for the Item of the afforementioned
project, was disposed properly, hence no test is required.
This certification/inspection report is being used upon for the absence of Quality Test
as per Quality Control Program for the said project

Certified by:

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

MATERIALS INSPECTION REPORT

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at
CONTRACT NAME:
Barangay Masagana, Naujan, Oriental Mindoro

LOCATION : Naujan, Oriental Mindoro


KIND OF MATERIALS: Water Pumping System

ITEM NO. INSPECTED: 1001(5)b DATE: 4/8/2022

PROPOSED USED: for use in the project

REMARKS/RECOMMENDATION:

Inspected by:

CARLO C. MANALO JOHN ERIC C. ROMASANTA


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CERTIFICATION

CONTRACT ID: 23ED0074


Construction (Completion) of Multi-Purpose Building, (Covered Court) at
CONTRACT NAME:
Barangay Masagana, Naujan, Oriental Mindoro

LOCATION : Naujan, Oriental Mindoro


KIND OF MATERIALS: Structural Concrete(Footing and Slab on Fill), A, 28 days

This is to certify that the water used in mixing concrete in the above mentioned project

were taken from Deep well and has found to be clean, odorless and tasteless

Inspected by:

ROCKY TOM BERNARD S. ROMASANTA CARLO C. MANALO


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

MATERIALS INSPECTION REPORT

CONTRACT ID: 23ED0074


CONTRACT NAME: Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Nau

LOCATION : Naujan, Oriental Mindoro


KIND OF MATERIALS: Err:509

ITEM NO. INSPECTED: Err:509 DATE: 44881

PROPOSED USED: mobilization of equipment for works

REMARKS/RECOMMENDATION:

Inspected by:

LEALUO E. DELA CHICA EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

MATERIALS INSPECTION REPORT

CONTRACT ID: 23ED0074


CONTRACT NAME: Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Nau

LOCATION : Naujan, Oriental Mindoro


KIND OF MATERIALS: Err:509

ITEM NO. INSPECTED: Err:509 DATE: 44881

PROPOSED USED: for protection works

REMARKS/RECOMMENDATION:

Inspected by:

LEALUO E. DELA CHICA EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

MATERIALS INSPECTION REPORT

CONTRACT ID: 23ED0074


CONTRACT NAME: Construction (Completion) of Multi-Purpose Building, (Covered Court) at Barangay Masagana, Nau

LOCATION : Naujan, Oriental Mindoro


KIND OF MATERIALS:

ITEM NO. INSPECTED: DATE:

PROPOSED USED:

REMARKS/RECOMMENDATION:

Inspected by:

LEALUO E. DELA CHICA EDILBERTO C. GODOY


Materials Engineer Project Engineer
STATUS OF TEST
As of MARCH 2022
REGION IV-B
Disctrict/City:
NAME OF PROJECT23ED0074
: Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro
CONTRACTOR MIDR CONSTRUCTION AND SUPPLIES
LOCATION : Socorro, Oriental Mindoro
Percent of
Revised Test
Iterm No. Description Unit Minimum test required Number of Test on File Balance
Qunatity Accomplis
hed

PART II OTHER GENERAL REQUIREMENTS


B.3 Permits and Clearances L.s. 1.00 Inspection Report Inspection Report 100%
B.5 Project Billboard/Signboard ea 1.00 Inspection Report Inspection Report 100%
B.7 Occupational Safety and Health Officer L.s. 1.00 Inspection Report Inspection Report Inspection Report 30%
PART A EARTHWORKS
101(1) Clearing and Grubbing sq.m. 1.00 Inspection Report Inspection Report 100%
803(1)a Structure Excavation(Common Soil) cu.m. 72.06 Engineer's Certification Engineer's Certification 100%
804(1)a Embankment from Road/Structure Excavation cu.m. 43.95 GPC-1,D-2 GPC-1,D-2 100%
804(1)b Embankment from Borrow cu.m. 53.20 GPC-1,D-2 GPC-1, D-2 100%
804(4) Gravel Fill cu.m. 60.96 G-1 G-1 100%
PART B PLAIN AND REINFORCED CONCRETE WORKS
900(1)c2 Structural Concrete(Footings and Slab on Fill), Class A, 28 days cu.m. 65.23 #1/pouring day Approx 2-sets #1/pouring day Approx 2-sets #1/pouring day Approx 2-sets 50%
900(1)c3 Structural Concrete(Footing Tie Beam), 28 days, A cu.m. 11.89 #1/pouring day Approx 1-set #1/pouring day Approx 1-set #1/pouring day Approx 1-set 50%
900(1)c4 Structural Concrete(Columns), A, 28 days cu.m. 15.48 #1/pouring day Approx 1-set #1/pouring day Approx 1-set #1/pouring day Approx 1-set 50%
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 50%
a) Cement bags 925.00 1-QT 1-QT 100%
b) Sand cu.m. 48.67 G-1; 1-QT G-1; 1-QT 100%
c) Gravel cu.m. 97.34 G-2; 1-QT G-2; 1-QT 100%
g) Water Lit L.s. PE Certification PE Certification 100%
h) Design Mix with Trial Mix set 1 #-1 #-1 100%
902(1)a1 Reinforcing Steel Deformed, Grade 40 kgs. 7,186.66 1-QT 1-QT 100%
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? 34%
903(2) Forms and Falseworks sq.m. 143.13 Inspection Report Inspection Report Inspection Report 84%
#NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? 100%
PART C FINISHING
1046(2)a1 100mm CHB Non Load Bearing Wall sq.m. 382.22 Inspection Report Inspection Report Inspection Report 10%
a) 100mm thk CHB pcs 4968.86 1-QT 1-QT 100%
b) Cement bags 202.58 1-QT* 1-QT* 100%
c) Sand cu.m. 15.29 G-1; 1-QT** G-1; 1-QT** 100%
d) Reinforcing Steel kgs. 1238.39 1-QT*** 1-QT*** 100%
e) Tie Wire #16 kgs. 19.11 Inspection Report Inspection Report 10%
#NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? 100%
### #NAME? #NAME? #NAME? #NAME? #NAME? 100%
### #NAME? #NAME? #NAME? #NAME? #NAME? 100%
### #NAME? #NAME? #NAME? #NAME? #NAME? 100%
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
1010(4) Wooden Doors and Windows L.s. 1.00 #NAME? #NAME? 0%
#NAME? ### #NAME? #NAME? Inspection Report Inspection Report 0%
#NAME? ### #NAME? #NAME? #NAME? #NAME? 0%
#NAME? ### #NAME? #NAME? #NAME? #NAME? 0%
#NAME? ### #NAME? #NAME? #NAME? #NAME? 0%
#NAME? ### #NAME? #NAME? #NAME? #NAME? 0%
#NAME? ### #NAME? #NAME? #NAME? #NAME? 0%
#NAME? ### #NAME? #NAME? #NAME? #NAME? 100%
#NAME? ### #NAME? #NAME? #NAME? #NAME? 0%
1014(1)b1 Prepainted Metal Sheets, Long Span, 0.427mm, Corrugated Type sq.m. 706.30 #NAME? #NAME? 0%
#NAME? ### #NAME? #NAME? Inspection Report Inspection Report 0%
1013(2)b1 Fabricated Metal Roofing Accessory, gauge 26, Gutters L.m. 103.20 #NAME? #NAME? 0%
1047(2)a Structural Steel, Trusses kgs. 7,577.54 1-QT 1-QT 100%
1047(2)b Structural Steel, Purlins kgs. 4,015.42 1-QT 1-QT 100%
#NAME? ### #NAME? #NAME? #NAME? #NAME? 0%
1047(6) Metal Structure Accessories(Steel Plates) kgs. 772.40 Inspection Report Inspection Report 0%
1002(27) Plumbing Works L.s. 1.00 Inspection Report Inspection Report 0%
#NAME? ### #NAME? #NAME? #NAME? #NAME? 0%
#NAME? ### #NAME? #NAME? #NAME? #NAME? 0%
#NAME? ### #NAME? #NAME? #NAME? #NAME? 0%
1001(11) Septic Vault(Concrete/CHB) L.s. 1.00 Inspection Report Inspection Report 100%
#NAME? ### #NAME? #NAME? #NAME? #NAME? 0%
1100(10) Conduit, Boxes and Fittings(conduit Works/Conduit Rough-in) L.s. 1.00 Inspection Report Inspection Report 0%
1101(33) Wires and Wiring Devices L.s. 1.00 Inspection Report Inspection Report 0%
1102(1) Panelboard with Main and Branch Breakers L.s. 1.00 Inspection Report Inspection Report 0%
1103(1) Lighting Fixtures and Lamps L.s. 1.00 Inspection Report Inspection Report 0%
x-x-x-x
#NAME?
The number of test indicated is based on the minimum testing requirements for one source, each material should be tested separately and the
number of tests should be the same as with the minimum testing requirements.
PREPARED BY: CERTIFIED BY:

MARK IAN M. DELOS REYES MERCEDES G. ASPI


Materials Engineer (Contractor) Chief, QUALITY Assurance Section
CHECKED BY: SUBMITTED BY:

ROCKY TOM BERNARD S. ROMASANTA MARK LESTER B. CABRAL


Materials Engineer - DPWH Project Engineer
FRAMECON BUILDERS
WORKSHEET FOR DESIGN OF CONCRETE

PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Naujan, Oriental Mindoro
(Number) (Name) (City/Province)

PREPARED BY: MARK IAN M. DELOS REYES ME MIDR CONSTRUCTION AND SUPPLIES
(Name) (Designation) (Office)
LAB. NUMBER: CALUBAYAN-DM-01
DATA FROM PRELIMINARY TESTS:
Fine Aggregates, QT-FA Coarse Aggregates, QT-CA
Manufactured/Natural : /X/ Natural Rounded /X/ Angular/ / Rounded
Finess Modulus 2.91 Maximum size, mm 19.00
Specific Gravity (SSD)_ 2.68 Abrasion Loss (%) 25.10
Moisture Content, % 4.70 Specific Gravity(SSD) 2.67
Absorption, % 0.20 Moisture Content, % 2.50
Unit, Wt. Kg./m3 (loose) __ 1572.77 Absorption, % 1.014
Type & Brand of Cement : Fortune Unit Wt., kg./m3 (loose) 1750.99
Admixture Brand _____ NONE___________________ Water Source Deepwell
=====================================================================
DESIGN SPECIFICATION REQUIREMENTS:
Class of Concrete "A" Cement Factor, bags/m3 ____9.00______ 9.50
Compressive Strength, Psi 3000 Slump, mm ____76.20_______________
100
Proportion of Cement Total Aggregates Parts by Weight:
Cement: 40.0 Total Agg. : _ 210.09
=====================================================================
DESIGN MIX PER BAG OF CEMENT:
Absolute Volume of Concrete, m3, cement factor ________ _ 0.105263
Absolute Volume of 40 kg./bag of cement, m3 0.012698
Absolute Volume of Water, m3 ________________________ 0.019949
Absolute Volume of Water and Cement, m3__________________ 0.032647
Absolute Volume of Fine & Coarse Aggregates, m3 ________________ 0.072616
Absolute Volume of Fine Aggregates, % of Total Aggregates by absolute Volume:
Fine Aggregates: ______ 46.00 (From TABLE V)
Total Correction (%) ______ -0.63 (From table e of Adjustments)
Corrected Fine Aggregates_______________ 45.37
Absolute Volume of Fine Aggregates, m3 ___________ 0.03295
Absolute Volume of Coarse Aggregates, m3____ _____0.03967

Materials Absolute Specific Unit wt. of Uncorrected Corrected Corrected


Volume m3 Gravity water kg/m3 Weights kg. Weight (Kg.) Volume (cu.ft.)
Cement 0.01270 3.15 1000 40.0 40 1
Fine Agg. 0.03295 2.68 1000 88.31 97.04 2.18
Coarse Agg. 0.03967 2.67 1000 105.92 113.05 2.28
Water 0.01995 1 1000 19.95 14.99 0.53
=====================================================================
PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS

9.45692883895

================= 9.03614457831
9.44444444444
9.47775628627

=================

1cu.m./ C.F.=9.00 = 0.11111 0.105263


40 kg./ 3.15 * 1000 = 0.01270 0.012698
167.42-4.7 / 9 .5x 1000 = 0.017118 0.017118
0.01270 + 0.017 = 0.03014 0.029816
0.1111 - 0.03014 = 0.08097 0.075447

162.72
water content F.A.
0.49873684211 2.91
STANDARD 0.570000 2.75
-0.071263 0.16
-1.425260 0.8 0.9
TOTAL CORR -0.625260 45.375
BY VOLUME:
1 bag 0.044903
2.18 35.319837041
2.28 35.319837041
0.53 35.319837041
=================
#REF! 0.0892351274788 0.01673159
#REF!
#REF!
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro
WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Fine Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. MIDR CONSTRUCTION AND SUPPLIES April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: QAS PERSONNEL DPWH April 7, 2022
(Name and Designation) (Office) (Date)
Computed by: QAS PERSONNEL DPWH April 7, 2022
(Name and Designation) (Office) (Date)
==========================================================================================================
LAB. NUMBER: CALUBAYAN-G-FA-900-01
Original Weight: 3651
Moistue Content: 4.70 Oven Dried: 3487
Fineness Modulus: 2.91 Washed Oven Dried: 3471

Sieve Designation Weight CUMULATIVE


Governing
% Spec's
Alternate Standard Retained Gram % Weight Passing
Retained Passing Gram %

3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm
3/4 " 19.0 mm
1/2 " 12.5 mm F.M.
3/8 " 9.5 mm 0 0 3487 100 100
No. 4 " 4.75 mm 139 4 3348 96 95-100
No. 8 " 2.36 mm 70 6 3278 94 -
No. 10 " 2.00 mm 523 - 2755 79 -
No. 16 " 1.18 mm 488 35 2267 65 45-80
No. 30 " 0.600 mm 1151 68 1116 32 -
No. 40 " 0.425 mm 384 - 732 21 -
No. 50 " 0.300 mm 279 87 453 13 5-30
No. 100 0.150 mm 139 91 314 9 0-10
No. 200 0.075 mm 279 2.91 35 1
PAN 19
Wash Passing 200 16
T O T A L 3487
REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

KEVIN E. GARCIA CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro
WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. MIDR CONSTRUCTION AND SUPPLIES April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: QAS PERSONNEL DPWH April 7, 2022
(Name and Designation) (Office) (Date)
Computed by: QAS PERSONNEL DPWH April 7, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: CALUBAYAN-G-CA-900-01
Original Weight: 3237
Moistue Content: 2.50 Oven Dried: 3158
Fineness Modulus: 0.00 Washed Oven Dried: 3145

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm 100
1" 25.0 mm 0 3158 100 95-100
3/4 " 19.0 mm 853 27 2305 73 -
1/2 " 12.5 mm 1042 60 1263 40 25-60
3/8 " 9.5 mm 568 78 695 22 -
No. 4 " 4.75 mm 569 96 126 4 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 94 32 1
PAN 19
Wash Passing 200 13
T O T A L 3158
REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

KEVIN E. GARCIA CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer II Engineer III
WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Fine Aggregates Spec's Item, No. 1027
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: QAS PERSONNEL Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Computed by: QAS PERSONNEL Contractor April 7, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: MPB-CITYHALL-G-FA-1027-01
Original Weight: 4283
Moistue Content: 2.61 Oven Dried: 4174
Fineness Modulus: 2.46 Washed Oven Dried: 4001

Sieve Designation Weight CUMULATIVE


Governing
% Spec's
Alternate Standard Retained Gram % Weight Passing
Retained Passing Gram %

3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm
3/4 " 19.0 mm
1/2 " 12.5 mm F.M.
3/8 " 9.5 mm 0 0 4158 100 100
No. 4 " 4.75 mm 125 3 4033 97 95-100
No. 8 " 2.36 mm 374 12 3659 88 -
No. 10 " 2.00 mm 208 - 3451 83 -
No. 16 " 1.18 mm 374 26 3077 74 45-80
No. 30 " 0.600 mm 541 39 2536 61 -
No. 40 " 0.425 mm 374 - 2162 52 -
No. 50 " 0.300 mm 1081 74 1081 26 5-30
No. 100 0.150 mm 748 92 333 8 0-10
No. 200 0.075 mm 125 2.46 208 5
PAN 35
Wash Passing 200 173
T O T A L 4158
REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

KEVIN E. GARCIA CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental
(Name) (Town /City/ Province)
Kind of Materials: Gravel Bedding Spec's Item, No. 804(4)
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: QAS PERSONNEL Contractor April 8, 2022
(Name and Designation) (Office) (Date)
Computed by: QAS PERSONNEL Contractor April 8, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: MPB-CITYHALL-G-804(4)-01
Original Weight: 3427
Moistue Content: 2.60 Oven Dried: 3340
Fineness Modulus: Washed Oven Dried: 3258

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm 100
1" 25.0 mm 0 3326 100 95-100
3/4 " 19.0 mm 1021 2305 69 -
1/2 " 12.5 mm 1203 1102 33 25-60
3/8 " 9.5 mm 434 668 20 -
No. 4 " 4.75 mm 534 134 4 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 34 100 3
PAN 18
Wash Passing 200 82
T O T A L 3326
REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

QAS PERSONNEL CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Backfill Materials Spec's Item, No. 804(1)a
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: QAS PERSONNEL Contractor April 9, 2022
(Name and Designation) (Office) (Date)
Computed by: QAS PERSONNEL Contractor April 9, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: MPB-CITYHALL-G-804(1)a-01
Original Weight: 3625
Moistue Content: 2.72 Oven Dried: 3529
Fineness Modulus: Washed Oven Dried: 3380

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm 3512 100
3/4 " 19.0 mm 830 2682 76
1/2 " 12.5 mm 423 2259 64
3/8 " 9.5 mm 424 1835 52
No. 4 " 4.75 mm 247 1588 45
No. 8 " 2.36 mm 176 1412 40
No. 10 " 2.00 mm 459 953 27
No. 16 " 1.18 mm 71 882 25
No. 30 " 0.600 mm 70 812 23
No. 40 " 0.425 mm 141 671 19
No. 50 " 0.300 mm 248 423 12
No. 100 0.150 mm 70 353 10
No. 200 0.075 mm 177 176 5
PAN 27
Wash Passing 200 149
T O T A L 3512
REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

QAS PERSONNEL CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Embankment Materials Spec's Item, No. 804(1)b
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: QAS PERSONNEL Contractor April 9, 2022
(Name and Designation) (Office) (Date)
Computed by: QAS PERSONNEL Contractor April 9, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: MPB-CITYHALL-G-804(1)b-01
Original Weight: 3585
Moistue Content: 2.49 Oven Dried: 3498
Fineness Modulus: Washed Oven Dried: 3415

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm 3481 100
3/4 " 19.0 mm 1207 2274 65
1/2 " 12.5 mm 350 1924 55
3/8 " 9.5 mm 245 1679 48
No. 4 " 4.75 mm 210 1469 42
No. 8 " 2.36 mm 210 1259 36
No. 10 " 2.00 mm 384 875 25
No. 16 " 1.18 mm 140 735 21
No. 30 " 0.600 mm 105 630 18
No. 40 " 0.425 mm 175 455 13
No. 50 " 0.300 mm 140 315 9
No. 100 0.150 mm 70 245 7
No. 200 0.075 mm 140 105 3
PAN 22
Wash Passing 200 83
T O T A L 3481
REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

QAS PERSONNEL CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Fine Aggregates Spec's Item, No. 1046(2)a
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: QAS PERSONNEL Contractor April 9, 2022
(Name and Designation) (Office) (Date)
Computed by: QAS PERSONNEL Contractor April 9, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: MPB-CITYHALL-1046(2)a
Original Weight: 4053
Moistue Content: 2.40 Oven Dried: 3958
Fineness Modulus: 2.58 Washed Oven Dried: 3780

Sieve Designation Weight CUMULATIVE


Governing
% Spec's
Alternate Standard Retained Gram % Weight Passing
Retained Passing Gram %

3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm
3/4 " 19.0 mm
1/2 " 12.5 mm F.M.
3/8 " 9.5 mm 0 0 3948 100 100
No. 4 " 4.75 mm 158 4 3790 96 95-100
No. 8 " 2.36 mm 474 16 3316 84 -
No. 10 " 2.00 mm 237 - 3079 78 -
No. 16 " 1.18 mm 276 29 2803 71 45-80
No. 30 " 0.600 mm 553 43 2250 57 -
No. 40 " 0.425 mm 355 - 1895 48 -
No. 50 " 0.300 mm 869 74 1026 26 5-30
No. 100 0.150 mm 710 92 316 8 0-10
No. 200 0.075 mm 119 2.58 197 5
PAN 19
Wash Passing 200 178
T O T A L 3948
REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

QAS PERSONNEL CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental
(Name) (Town /City/ Province)
Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor September 22, 2015
(Name and Designation) (Office) (Date)
Tested by: QAS PERSONNEL Contractor September 23, 2015
(Name and Designation) (Office) (Date)
Computed by: QAS PERSONNEL Contractor September 23, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-CA-02
Original Weight: 4048
Moistue Content: 1.81 Oven Dried: 3976
Fineness Modulus: 2.91 Washed Oven Dried: 3863

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm F.M. 100
1" 25.0 mm 0 0 3960 100 95-100
3/4 " 19.0 mm 1584 40 2376 60 -
1/2 " 12.5 mm 1267 72 1109 28 25-60
3/8 " 9.5 mm 475 84 634 16 -
No. 4 " 4.75 mm 436 95 198 5 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 79 2.91 119 3
PAN 6
Wash Passing 200 113
T O T A L 3960

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

QAS PERSONNEL CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental
(Name) (Town /City/ Province)
Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor September 22, 2015
(Name and Designation) (Office) (Date)
Tested by: QAS PERSONNEL Contractor September 23, 2015
(Name and Designation) (Office) (Date)
Computed by: QAS PERSONNEL Contractor September 23, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-CA-03
Original Weight: 4124
Moistue Content: 1.90 Oven Dried: 4047
Fineness Modulus: 2.90 Washed Oven Dried: 3932

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm F.M. 100
1" 25.0 mm 0 0 4030 100 95-100
3/4 " 19.0 mm 2015 50 2015 50 -
1/2 " 12.5 mm 604 65 1411 35 25-60
3/8 " 9.5 mm 565 79 846 21 -
No. 4 " 4.75 mm 685 96 161 4 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 40 2.9 121 3
PAN 6
Wash Passing 200 115
T O T A L 4030

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

QAS PERSONNEL CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III

WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental
(Name) (Town /City/ Province)
Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor November 4, 2015
(Name and Designation) (Office) (Date)
Tested by: RUBEN D. VALEZA JR. / ME Contractor November 5, 2015
(Name and Designation) (Office) (Date)
Computed by: RUBEN D. VALEZA JR. / ME Contractor November 5, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-CA-04
Original Weight: 4079
Moistue Content: 1.39 Oven Dried: 4023
Fineness Modulus: 2.97 Washed Oven Dried: 3869

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm F.M. 100
1" 25.0 mm 0 0 4008 100 95-100
3/4 " 19.0 mm 1964 49 2044 51 -
1/2 " 12.5 mm 922 72 1122 28 25-60
3/8 " 9.5 mm 320 80 802 20 -
No. 4 " 4.75 mm 642 96 160 4 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 0 2.97 160 4
PAN 6
Wash Passing 200 154
T O T A L 4008

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

QAS PERSONNEL CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III

WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental
(Name) (Town /City/ Province)
Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor November 4, 2015
(Name and Designation) (Office) (Date)
Tested by: RUBEN D. VALEZA JR. / ME Contractor November 5, 2015
(Name and Designation) (Office) (Date)
Computed by: RUBEN D. VALEZA JR. / ME Contractor November 5, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-CA-05
Original Weight: 4050
Moistue Content: 1.30 Oven Dried: 3998
Fineness Modulus: 3.05 Washed Oven Dried: 3805

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm F.M. 100
1" 25.0 mm 0 0 3984 100 95-100
3/4 " 19.0 mm 2072 52 1912 48 -
1/2 " 12.5 mm 796 72 1116 28 25-60
3/8 " 9.5 mm 678 89 438 11 -
No. 4 " 4.75 mm 119 92 319 8 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 120 3.05 199 5
PAN 6
Wash Passing 200 193
T O T A L 3984

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

QAS PERSONNEL CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III

WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental
(Name) (Town /City/ Province)
Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor November 10, 2015
(Name and Designation) (Office) (Date)
Tested by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
Computed by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-CA-06
Original Weight: 4014
Moistue Content: 1.59 Oven Dried: 3951
Fineness Modulus: 3.05 Washed Oven Dried: 3839

Sieve Designation Weight CUMULATIVE


Governing
% Spec's
Passing %
Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm F.M. 100
1" 25.0 mm 0 0 3934 100 95-100
3/4 " 19.0 mm 2360 60 1574 40 -
1/2 " 12.5 mm 512 73 1062 27 25-60
3/8 " 9.5 mm 236 79 826 21 -
No. 4 " 4.75 mm 551 93 275 7 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 157 3.05 118 3
PAN 6
Wash Passing 200 112
T O T A L 3934

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

QAS PERSONNEL CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III

WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental
(Name) (Town /City/ Province)
Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor November 10, 2015
(Name and Designation) (Office) (Date)
Tested by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
Computed by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-CA-07
Original Weight: 4005
Moistue Content: 1.60 Oven Dried: 3942
Fineness Modulus: 3.00 Washed Oven Dried: 3791

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm F.M. 100
1" 25.0 mm 0 0 3925 100 95-100
3/4 " 19.0 mm 2316 59 1609 41 -
1/2 " 12.5 mm 431 70 1178 30 25-60
3/8 " 9.5 mm 354 79 824 21 -
No. 4 " 4.75 mm 510 92 314 8 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 157 3 157 4
PAN 6
Wash Passing 200 151
T O T A L 3925

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

QAS PERSONNEL CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III

WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental
(Name) (Town /City/ Province)
Kind of Materials: Fine Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor November 10, 2015
(Name and Designation) (Office) (Date)
Tested by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
Computed by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-FA-03
Original Weight: 4051
Moistue Content: 1.71 Oven Dried: 3983
Fineness Modulus: 2.72 Washed Oven Dried: 3790

Sieve Designation Weight CUMULATIVE


Governing
% Spec's
Alternate Standard Retained Gram % Weight Passing
Retained Passing Gram %

3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm
3/4 " 19.0 mm
1/2 " 12.5 mm F.M.
3/8 " 9.5 mm 0 0 3968 100 100
No. 4 " 4.75 mm 198 5 3770 95 95-100
No. 8 " 2.36 mm 516 18 3254 82 -
No. 10 " 2.00 mm 199 - 3055 77 -
No. 16 " 1.18 mm 357 32 2698 68 45-80
No. 30 " 0.600 mm 516 45 2182 55 -
No. 40 " 0.425 mm 277 - 1905 48 -
No. 50 " 0.300 mm 1111 80 794 20 5-30
No. 100 0.150 mm 477 92 317 8 0-10
No. 200 0.075 mm 119 2.72 198 5
PAN 5
Wash Passing 200 193
T O T A L 3968
REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

QAS PERSONNEL CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental
(Name) (Town /City/ Province)
Kind of Materials: Fine Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor November 10, 2015
(Name and Designation) (Office) (Date)
Tested by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
Computed by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-FA-04
Original Weight: 3999
Moistue Content: 1.39 Oven Dried: 3944
Fineness Modulus: 2.74 Washed Oven Dried: 3752

Sieve Designation Weight CUMULATIVE


Governing
% Spec's
Alternate Standard Retained Gram % Weight Passing
Retained Passing Gram %

3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm
3/4 " 19.0 mm
1/2 " 12.5 mm F.M.
3/8 " 9.5 mm 0 0 3930 100 100
No. 4 " 4.75 mm 196 5 3734 95 95-100
No. 8 " 2.36 mm 590 20 3144 80 -
No. 10 " 2.00 mm 196 - 2948 75 -
No. 16 " 1.18 mm 276 32 2672 68 45-80
No. 30 " 0.600 mm 510 45 2162 55 -
No. 40 " 0.425 mm 276 - 1886 48 -
No. 50 " 0.300 mm 1061 79 825 21 5-30
No. 100 0.150 mm 550 93 275 7 0-10
No. 200 0.075 mm 78 2.74 197 5
PAN 5
Wash Passing 200 192
T O T A L 3930
REMARKS:
Grading Satisfactory
PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

QAS PERSONNEL CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
15

30
6
12.75
12.75
6
12.75
6
12.75 `
6
12.75
6
12.75
6
12.75
6
12.75
6
12.75
6
12.75
12.75
12.75
12.75
12.75
12.75
12.75
16.5

37.5

12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
15

===========
`

===========

12

21
gana, Naujan, Oriental Mindoro

===========
===========
===========
===========

12

21
gana, Naujan, Oriental Mindoro

===========
gana, Naujan, Oriental Mindoro

===========

gana, Naujan, Oriental Mindoro


===========

gana, Naujan, Oriental Mindoro


===========

gana, Naujan, Oriental Mindoro

===========
gana, Naujan, Oriental Mindoro

===========
gana, Naujan, Oriental Mindoro

===========

12

21
gana, Naujan, Oriental Mindoro

===========

12

21
QUALITY CONTROL PROGRAM
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
NAME OF PROJECT: Naujan, Oriental Mindoro
CONTRACT ID NO. : 22ED0084 EFFECTIVITY DATE : April 6, 2022
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES CONTRACT TIME : 165 CD
LOCATION : Socorro, Oriental Mindoro EXPIRY DATE : September 17, 2022
CONTRACT COST : Php4,871,686.09 DESCRIPTION : Construction of Multi-Purpose
A. TEST TO BE PERFORMED: Building

Original
Item No. Description Unit Quantity Minimum test required

PART II OTHER GENERAL REQUIREMENTS


B.3 Permits and Clearances L.s. 1.00 Inspection Report
B.5 Project Billboard/Signboard ea 1.00 Inspection Report
B.7 Occupational Safety and Health Officer L.s. 1.00 Inspection Report
PART A EARTHWORKS
101(1) Clearing and Grubbing sq.m. 1.00 Inspection Report
803(1)a Structure Excavation(Common Soil) cu.m. 72.06 Engineer's Certification
804(1)a Embankment from Road/Structure Excavation cu.m. 43.95 GPC-1,D-2
804(1)b Embankment from Borrow cu.m. 53.20 GPC-1,D-2
804(4) Gravel Fill cu.m. 60.96 G-1
PART B PLAIN AND REINFORCED CONCRETE WORKS
900(1)c2 Structural Concrete(Footings and Slab on Fill), Class A, 28 days cu.m. 65.23 #1/pouring day Approx 2-sets
a) Cement bags
b) Sand cu.m.
c) Gravel cu.m.
g) Water Lit
h) Design Mix with Trial Mix set
900(1)c3 Structural Concrete(Footing Tie Beam), 28 days, A cu.m. 11.89 #1/pouring day Approx 1-set
a) Cement bags
b) Sand cu.m.
c) Gravel cu.m.
g) Water Lit
h) Design Mix with Trial Mix set
900(1)c4 Structural Concrete(Columns), A, 28 days cu.m. 15.48 #1/pouring day Approx 1-set
a) Cement bags
b) Sand cu.m.
c) Gravel cu.m.
g) Water Lit
h) Design Mix with Trial Mix set
900(1)c6 Structural Concrete(Beams/Girders), A, 28 days cu.m. 4.74 #1/pouring day Approx 1-set
a) Cement bags 925.00 1-QT
b) Sand cu.m. 48.67 G-1; 1-QT
c) Gravel cu.m. 97.34 G-2; 1-QT
g) Water Lit L.s. PE Certification
h) Design Mix with Trial Mix set 1.00 #-1
902(1)a1 Reinforcing Steel Deformed, Grade 40 kgs. 7,186.66 1-QT
903(2) Forms and Falseworks sq.m. 143.13 Inspection Report
PART C FINISHING
1046(2)a1 100mm CHB Non Load Bearing Wall sq.m. 382.22 Inspection Report
a) 100mm thk CHB pcs 4,968.86 1-QT
b) Cement bags 202.58 1-QT*
c) Sand cu.m. 15.29 G-1; 1-QT**
d) Reinforcing Steel kgs. 1,238.39 1-QT***
QUALITY CONTROL PROGRAM
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
NAME OF PROJECT: Naujan, Oriental Mindoro
CONTRACT ID NO. : 22ED0084 EFFECTIVITY DATE : April 6, 2022
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES CONTRACT TIME : 165 CD
LOCATION : Socorro, Oriental Mindoro EXPIRY DATE : September 17, 2022
CONTRACT COST : Php4,871,686.09 DESCRIPTION : Construction of Multi-Purpose
A. TEST TO BE PERFORMED: Building

Original
Item No. Description Unit Quantity Minimum test required
e) Tie Wire #16 kgs. 19.11 Inspection Report
1010(4) Wooden Doors and Windows L.s. 1.00 Inspection Report
1027(1) Cement Plaster Finish sq.m. 858.88 Inspection Report
1051(6) Railing L.s. 1.00 Inspection Report
1003(1)a1 Ceiling Fiber Cement Board, 4.5mm Metal Frame sq.m. 66.01 Inspection Report
1018(5) Glazed Tiles sq.m. 67.43 Inspection Report
1018(2) Unglazed Tiles sq.m. 72.20 Inspection Report
1032(1)a Painting Works Masonry/Concrete sq.m. 858.88 Inspection Report
1032(1)c Painting Works Steel sq.m. 567.40 Inspection Report
1014(1)b1 Prepainted Metal Sheets, Long Span, 0.427mm,
Corrugated Type sq.m. 706.30 Inspection Report
1013(2)b1
Fabricated Metal Roofing Accessory, gauge 26, Gutters L.m. 103.20 Inspection Report
1013(2)a1 Fabricated Metal Roofing Accessory, gauge 26,
Ridge/Rolls L.m. 27.00 Inspection Report
1013(2)a2
Fabricated Metal Roofing Accessory, gauge 26, Flashings L.m. 149.50 Inspection Report
1047(2)a Structural Steel, Trusses kgs. 7,577.54 1-QT
1047(2)b Structural Steel, Purlins kgs. 4,015.42 1-QT
1047(6) Metal Structure Accessories(Steel Plates) kgs. 772.40 Inspection Report
1047(3)a Metal Structure Accessories, Bolts pcs 98.00 Inspection Report
1047(3)d Metal Structure Accessories, Cross Bracing pcs 32.00 Inspection Report
1047(3)c Metal Structure Accessories, Turn Buckle pcs 64.00 Inspection Report
1047(3)b Metal Structure Accessories, Sag Rods pcs 104.00 Inspection Report
1002(27) Plumbing Works L.s. 1.00 Inspection Report
1001(11) Septic Vault(Concrete/CHB) L.s. 1.00 Inspection Report
1100(10) Conduit, Boxes and Fittings(conduit Works/Conduit
Rough-in) L.s. 1.00 Inspection Report
1101(33) Wires and Wiring Devices L.s. 1.00 Inspection Report
1102(1) Panelboard with Main and Branch Breakers L.s. 1.00 Inspection Report
1103(1) Lighting Fixtures and Lamps L.s. 1.00 Inspection Report

x-x-x-x
NOTE: * Test included in Item 900(1)c - a
** Test included in Item 900(1)c - b
*** Test included in Item 902(1)a1 - a

PREPARED BY: CERTIFIED BY:

MARK IAN M. DELOS REYES MERCEDES G. ASPI


MIDR CONSTRUCTION AND SUPPLIES - Materials Engineer Chief, QAS MODEO

CHECKED BY: APPROVED:


QUALITY CONTROL PROGRAM
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
NAME OF PROJECT: Naujan, Oriental Mindoro
CONTRACT ID NO. : 22ED0084 EFFECTIVITY DATE : April 6, 2022
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES CONTRACT TIME : 165 CD
LOCATION : Socorro, Oriental Mindoro EXPIRY DATE : September 17, 2022
CONTRACT COST : Php4,871,686.09 DESCRIPTION : Construction of Multi-Purpose
A. TEST TO BE PERFORMED: Building

Original
Item No. Description Unit Quantity Minimum test required

ROCKY TOM BERNARD S. ROMASANTA SALVADOR E. ABAD


Materials Engineer - DPWH OIC-District Engineer
MP CABRERA CONSTRUCTION

CONSTRUCTION OF MULTI-PURPOSE BUILDING(COVERED COURT),


CALAPAN CENTRAL SCHOOL, BRGY. IBABA EAST, CALAPAN CITY,
ORIENTAL MINDORO

Cement 1 3000.00 3,000.00


Cement Sample 1 250.00 250.00
RSB-10mm def. 1 2070.00 2,070.00
RSB-16mm def. 1 2070.00 2,070.00
50x100x1.2mm C Purlins 1 2370.00 2,370.00
100x100x6.35mm Angle Bar 1 2370.00 2,370.00
75x75x6.35mm Angle Bar 1 2370.00 2,370.00
50x50x6.35mm Angle Bar 1 2370.00 2,370.00
Miscellaneous Expenses 3,000.00
19,870.00
Quality test-900
Fine Aggregate (FA) 1 1,920.00 1,920.00
Coarse Aggregate (Natural) 1 1,890.00 1,890.00
Compressive Test:
Cylinder Sample 21 140.00 2,940.00
Field Test 1 5000.00 5,000.00
11,750.00

TOTAL 31,620.00
====================================================================================================

CONSTRUCTION OF BRGY HEALTH CENTER, BRGY MELGAR A


NAUJAN, OR. MINDORO
Cement 1 3000.00 3,000.00
Cement Sample 1 250.00 250.00
RSB-10mm def. 1 2070.00 2,070.00
RSB-16mm def. 1 2070.00 2,070.00
62.5x62.5x6.635mm Angle Bar 1 2370.00 2,370.00
50x50x6.635mm Angle Bar 1 2370.00 2,370.00
50x100x1.5mm C Purlins 1 2370.00 2,370.00
Miscellaneous Expenses 2,500.00
17,000.00
Quality test-900
Fine Aggregate (FA) 1 1,860.00 1,860.00
Coarse Aggregate (Natural) 1 1,830.00 1,830.00
Quality test-704 CHB # 6 1 1,290.00 1,290.00
CHB # 4 1 1,290.00 1,290.00
Compressive Test:
Cylinder Sample 24 140.00 3,360.00
Field Test 1 6000.00 6,000.00
15,630.00

TOTAL 32,630.00

====================================================================================================

GRANDTOTAL 64,250.00

ALGIMAR CONSTRUCTION / WERR CORP. INT'L J.V.

CONSTRUCTION OF POLA R/C AND SEAWALL


POLA, ORIENTAL MINDORO

Cement 9 2560.00 23,040.00


Cement Sample 9 250.00 2,250.00
RSB-12mm def. 5 2070.00 10,350.00
RSB-16mm def. 1 2070.00 2,070.00
37,710.00
Miscellaneous Expenses
Fare Companion 192
Arastre 258
Fare 1536
Startoll 67
Slex 25
Skyway 260
2338 x2= 4,676.00
Fuel 1,200.00
Food 1,000.00
6,876.00

====================================================================================================

Quality test-405
Fine Aggregate (FA) 1 1,860.00 1,860.00
Coarse Aggregate (Natural) 1 1,830.00 1,830.00
Quality test-509(b.1) 2 2,600.00 5,200.00
Compressive Test:
Cylinder Sample 18 140.00 2,520.00
11,410.00

====================================================================================================
Worksheet 84,000.00
====================================================================================================

TOTAL 139,996.00

ALGIMAR CONSTRUCTION / WERR CORP. INT'L J.V.

CONSTRUCTION OF ABATON RIVER CONTROL


CALAPAN CITY, ORIENTAL MINDORO
Cement 6 2560.00 15,360.00
Cement Sample 6 250.00 1,500.00
RSB-12mm def. 5 2070.00 10,350.00
RSB-16mm def. 1 2070.00 2,070.00
29,280.00
Miscellaneous Expenses
Fare Companion 192
Arastre 258
Fare 1536
Startoll 67
Slex 25
Skyway 260
2338 x2= 4,676.00
Fuel 1,200.00
Food 1,000.00
6,876.00

====================================================================================================

Quality test-405
Fine Aggregate (FA) 1 1,860.00 1,860.00
Coarse Aggregate (Natural) 1 1,830.00 1,830.00
Quality test-509(b.1) 2 2,600.00 5,200.00
Compressive Test:
Cylinder Sample 57 140.00 7,980.00
16,870.00

====================================================================================================
Worksheet 84,000.00
====================================================================================================

TOTAL 137,026.00

311 21226.8 10.6134


500 9
506 984.94
600 2729.0724 1.857006
704 6129.1565 3.064578
704B 1984.564 0.992282
33063.5329 16.53177
17

405 8445.69
506 889.02
8445.69 11.8536 36
4.222845 5 BAGS 48
AB1 Mega Builders / Protech Const. & Dev't Corp. - J.V.

CONSTRUCTION OF GUTAD RIVER CONTROL


CALAPAN CITY, ORIENTAL MINDORO

Cement 5 2560.00 12,800.00


Cement Sample 5 250.00 1,250.00
RSB-12mm def. 5 2070.00 10,350.00
RSB-16mm def. 1 2070.00 2,070.00
26,470.00
Miscellaneous Expenses
Fare Companion 192
Arastre 258
Fare 1536
Startoll 67
Slex 25
Skyway 260
2338 x2= 4,676.00
Fuel 1,200.00
Food 1,000.00
6,876.00

====================================================================================================

Quality test-405
Fine Aggregate (FA) 1 1,860.00 1,860.00
Coarse Aggregate (Natural) 1 1,830.00 1,830.00
Quality test-509(b.1) 2 2,600.00 5,200.00
Compressive Test:
Cylinder Sample 48 140.00 6,720.00
15,610.00

====================================================================================================
Worksheet 84,000.00
====================================================================================================

TOTAL 132,956.00
1,900,000.00 2,300,000.00

126,666.67 153,333.33

1,393,333.37 1,686,666.63
===================

===================

4.216835
===================

===================

===================
4.124861

===================

14.24747
45
57
===================

===================
4.124861

===================

14.24747
45
57
===================

===================
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR ABRASION TEST

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


PROJECT:
Barangay Masagana, Naujan, Oriental Mindoro
(Name) (Town/City/Province)
KIND OF MATERIALS: Coarse Aggregates Spec's Item No.: 900(1)
SAMPLED AT: Jobsite Stockpile
(Give as accurate a location as possible)
ORIGINAL SOURCE: Tigkan River
(Pit, Quarry, River, etc. and location)
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES April 7, 2022
(Name and Designation) (Office) (Date)
TESTED BY: MQC Personnel DPWH April 7, 2022
(Name and Designation) (Office) (Date)

Lab. Number : CC-PARANG-ABR-01

SIEVE SIZE GRADING "A"


Passing Retained No. of Spheres - 12
37.5 mm 25 mm - 1250 gms
25 mm. 19.0 m. - 1250 gms
19.0 mm. 12.5 mm. - 1250 gms
12.5 m. 9.5 m. - 1250 gms
TOTAL 5000 gms

Percentage of Wear % = Original Mass - Sample retained


of Sample No. 1.70 mm sieve, g. X 100
Original of Sample, g.

= 1255.00 3745.00
X 100
5000

% of Wear = 25.10 SPECS = 40%

REMARKS: PASSED

Prepared by: Checked by: Noted By:

KEVIN E. GARCIA ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR SPECIFIC GRAVITY

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered


PROJECT: Court) at Barangay Masagana, Naujan, Oriental Mindoro
(Name) (Town/City/Province)
KIND OF MATERIALS: Coarse Aggregates Spec's Item No.: 900(1)
SAMPLED AT: Jobsite Stockpile
(Give as accurate a location as possible)
ORIGINAL SOURCE: Tigkan River
(Pit, Quarry, River, etc. and location)
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES April 7, 2022
(Name and Designation) (Office) (Date)
TESTED BY: MQC Personnel DPWH April 8, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC Personnel DPWH April 8, 2022
(Name and Designation) (Office) (Date)

COARSE AGGREGATE

Lab. Number : CC-PARANG-SG-CA-01

(a) Wt. of oven dry sample in air (g) 1973 1973


(b) Wt. of surface dry sample in air (g) 1993 1993
(c) Wt. of saturated sample in water (g) 1246 1246
(d) Volume (b-c) 747 747
1) Bulk Specific Gravity, (b/d) 2.67 2.67
2) Ave. Bulk Sp. Gr. 2.67
3) Absorption ( b-a x 100 ) 1.014 1.014
(a)
4) Average Absorption 1.014

Prepared by: Checked by: Noted By:

KEVIN E. GARCIA ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer II Engineer III

Republic of the Philippines


Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR SPECIFIC GRAVITY

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered


PROJECT: Court) at Barangay Masagana, Naujan, Oriental Mindoro
(Name) (Town/City/Province)
KIND OF MATERIALS: Fine Aggregates Spec's Item No.: 900(1)
SAMPLED AT: Jobsite Stockpile
(Give as accurate a location as possible)
ORIGINAL SOURCE: Tigkan River
(Pit, Quarry, River, etc. and location)
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES April 7, 2022
(Name and Designation) (Office) (Date)
TESTED BY: MQC Personnel DPWH April 8, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC Personnel DPWH April 8, 2022
(Name and Designation) (Office) (Date)

FINE AGGREGATE

Lab. Number : CC-PARANG-SG-FA-01

(a) Wt. of oven dry sample in air (g) 489 489


(b) Wt. of volumetric flask filled with water (g) 717 717
(c) Wt. of saturated surface dry sample in air (g) 490.00 490.00
(d) Wt. of volumetric flask & water & sample (g) 1024.00 1024.00
(e) Volume (b+c-d) 183.00 183.00
1) Bulk Specific Gravity, (c/e) 2.68 2.68
2) Ave. Bulk Sp. Gr. 2.68
7) Absorption ( c-a/a x 100 ) 0.20 0.20
8) Average Absorption 0.20

Prepared by: Checked by: Noted By:

KEVIN E. GARCIA ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer II Engineer III
wn/City/Province)
wn/City/Province)
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR UNIT WEIGHT

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered


PROJECT: Court) at Barangay Masagana, Naujan, Oriental Mindoro
(Name) (Town/City/Province)
KIND OF MATERIALS: Coarse Aggregates Spec's Item No.: 900(1)
SAMPLED AT: Jobsite Stockpile
(Give as accurate a location as possible)
ORIGINAL SOURCE: Tigkan River
(Pit, Quarry, River, etc. and location)
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES April 7, 2022
(Name and Designation) (Office) (Date)
TESTED BY: MQC Personnel DPWH April 7, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC Personnel DPWH April 7, 2022
(Name and Designation) (Office) (Date)

Lab. Number : CC-PARANG-UW-CA-900-01

LOOSE
I II III
1. Wt. of Container + sample, kg. 5.000 5.000 5.000
2. Wt. of Container, kg. 1.463 1.463 1.463
3. Sample, kg. (1) - (2) 3.537 3.537 3.537
4. Vol. of Container, cu.m. 0.0020200 0.0020200 0.0020200
5. Unit Weight/mass, kg/cu.m. (3) / ( 1750.99 1750.99 1750.99
Ave. Unit Weight 1750.99

RODDED
I II III
1. Wt. of Container + sample, kg. 5.430 5.430 5.430
2. Wt. of Container, kg. 1.463 1.463 1.463
3. Sample, kg. (1) - (2) 3.967 3.967 3.967
4. Vol. of Container, cu.m. 0.0020200 0.0020200 0.0020200
5. Unit Weight/mass, kg/cu.m. (3) / ( 1963.86 1963.86 1963.86
Ave. Unit Weight 1963.86

Prepared by: Noted By:

KEVIN E. GARCIA ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR UNIT WEIGHT

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered


PROJECT: Court) at Barangay Masagana, Naujan, Oriental Mindoro
(Name) (Town/City/Province)
KIND OF MATERIALS: Fine Aggregates Spec's Item No.: 900(1)
SAMPLED AT: Jobsite Stockpile
(Give as accurate a location as possible)
ORIGINAL SOURCE: Tigkan River
(Pit, Quarry, River, etc. and location)
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES April 7, 2022
(Name and Designation) (Office) (Date)
TESTED BY: MQC Personnel DPWH April 7, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC Personnel DPWH April 7, 2022
(Name and Designation) (Office) (Date)

Lab. Number : CC-PARANG-UW-FA-900-01

LOOSE
I II III
1. Wt. of Container + sample, kg. 4.64 4.64 4.64
2. Wt. of Container, kg. 1.463 1.463 1.463
3. Sample, kg. (1) - (2) 3.177 3.177 3.177
4. Vol. of Container, cu.m. 0.0020200 0.0020200 0.0020200
5. Unit Weight/mass, kg/cu.m. (3) / ( 1572.77 1572.77 1572.77
Ave. Unit Weight 1572.77

RODDED
I II III
1. Wt. of Container + sample, kg. 4.85 4.85 4.85
2. Wt. of Container, kg. 1.463 1.463 1.463
3. Sample, kg. (1) - (2) 3.387 3.387 3.387
4. Vol. of Container, cu.m. 0.0020200 0.0020200 0.0020200
5. Unit Weight/mass, kg/cu.m. (3) / ( 1676.73 1676.73 1676.73
Ave. Unit Weight 1676.73

Prepared by: Noted By:

KEVIN E. GARCIA ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Fine Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: MARK IAN M. DELOS REYES Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Computed by: MARK IAN M. DELOS REYES Contractor April 7, 2022
(Name and Designation) (Office) (Date)
=========================================================================================================
LAB. NUMBER: CALUBAYAN-G-FA-900-01
Original Weight: 3651
Moistue Content: 4.70 Oven Dried: 3487
Fineness Modulus: 2.91 Washed Oven Dried: 3471

Sieve Designation Weight CUMULATIVE


Governing
% Spec's
Alternate Standard Retained Gram % Weight Passing
Retained Passing Gram %

3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm
3/4 " 19.0 mm
1/2 " 12.5 mm F.M.
3/8 " 9.5 mm 0 0 3487 100 100
No. 4 " 4.75 mm 139 4 3348 96 95-100
No. 8 " 2.36 mm 70 6 3278 94 -
No. 10 " 2.00 mm 523 - 2755 79 -
No. 16 " 1.18 mm 488 35 2267 65 45-80
No. 30 " 0.600 mm 1151 68 1116 32 -
No. 40 " 0.425 mm 384 - 732 21 -
No. 50 " 0.300 mm 279 87 453 13 5-30
No. 100 0.150 mm 139 91 314 9 0-10
No. 200 0.075 mm 279 2.91 35 1
PAN 19
Wash Passing 200 16
T O T A L 3487
REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: MARK IAN M. DELOS REYES Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Computed by: MARK IAN M. DELOS REYES Contractor April 7, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: CALUBAYAN-G-CA-900-01
Original Weight: 3237
Moistue Content: 2.50 Oven Dried: 3158
Fineness Modulus: 0.00 Washed Oven Dried: 3145

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm 100
1" 25.0 mm 0 3158 100 95-100
3/4 " 19.0 mm 853 27 2305 73 -
1/2 " 12.5 mm 1042 60 1263 40 25-60
3/8 " 9.5 mm 568 78 695 22 -
No. 4 " 4.75 mm 569 96 126 4 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 94 32 1
PAN 19
Wash Passing 200 13
T O T A L 3158

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Fine Aggregates Spec's Item, No. 1027
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: MARK IAN M. DELOS REYES Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Computed by: MARK IAN M. DELOS REYES Contractor April 7, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: CALUBAYAN-G-FA-1027-01
Original Weight: 3243
Moistue Content: 2.50 Oven Dried: 3164
Fineness Modulus: 2.28 Washed Oven Dried: 3086

Sieve Designation Weight CUMULATIVE


Governing
% Spec's
Alternate Standard Retained Gram % Weight Passing
Retained Passing Gram %

3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm
3/4 " 19.0 mm
1/2 " 12.5 mm F.M.
3/8 " 9.5 mm 0 0 3164 100 100
No. 4 " 4.75 mm 127 4 3037 96 95-100
No. 8 " 2.36 mm 253 12 2784 88 -
No. 10 " 2.00 mm -95 - 2879 91 -
No. 16 " 1.18 mm 316 19 2563 81 45-80
No. 30 " 0.600 mm 348 30 2215 70 -
No. 40 " 0.425 mm 285 - 1930 61 -
No. 50 " 0.300 mm 1044 72 886 28 5-30
No. 100 0.150 mm 601 91 285 9 0-10
No. 200 0.075 mm 158 2.28 127 4
PAN 49
Wash Passing 200 78
T O T A L 3164

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Gravel Bedding Spec's Item, No. 804(4)
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: MARK IAN M. DELOS REYES Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Computed by: MARK IAN M. DELOS REYES Contractor April 7, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: CALUBAYAN-G-804(4)-01
Original Weight: 3763
Moistue Content: 3.49 Oven Dried: 3636
Fineness Modulus: Washed Oven Dried: 3609

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm 100
1" 25.0 mm 0 3636 100 95-100
3/4 " 19.0 mm 800 2836 78 -
1/2 " 12.5 mm 1200 1636 45 25-60
3/8 " 9.5 mm 618 1018 28 -
No. 4 " 4.75 mm 763 255 7 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 182 73 2
PAN 46
Wash Passing 200 27
T O T A L 3636

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Backfill Materials Spec's Item, No. 804(1)a
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: MARK IAN M. DELOS REYES Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Computed by: MARK IAN M. DELOS REYES Contractor April 7, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: CALUBAYAN-G-804(1)a-01
Original Weight: 3571
Moistue Content: 2.41 Oven Dried: 3487
Fineness Modulus: Washed Oven Dried: 3383

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm 3487 100
3/4 " 19.0 mm 488 2999 86
1/2 " 12.5 mm 488 2511 72
3/8 " 9.5 mm 314 2197 63
No. 4 " 4.75 mm 488 1709 49
No. 8 " 2.36 mm 175 1534 44
No. 10 " 2.00 mm 453 1081 31
No. 16 " 1.18 mm 209 872 25
No. 30 " 0.600 mm 105 767 22
No. 40 " 0.425 mm 104 663 19
No. 50 " 0.300 mm 279 384 11
No. 100 0.150 mm 70 314 9
No. 200 0.075 mm 140 174 5
PAN 70
Wash Passing 200 104
T O T A L 3487

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Embankment Materials Spec's Item, No. 804(1)b
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: MARK IAN M. DELOS REYES Contractor April 8, 2022
(Name and Designation) (Office) (Date)
Computed by: MARK IAN M. DELOS REYES Contractor April 8, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: CALUBAYAN-G-804(1)b-01
Original Weight: 3871
Moistue Content: 2.30 Oven Dried: 3784
Fineness Modulus: Washed Oven Dried: 3678

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm 3784 100
3/4 " 19.0 mm 1060 2724 72
1/2 " 12.5 mm 302 2422 64
3/8 " 9.5 mm 416 2006 53
No. 4 " 4.75 mm 190 1816 48
No. 8 " 2.36 mm 113 1703 45
No. 10 " 2.00 mm 492 1211 32
No. 16 " 1.18 mm 151 1060 28
No. 30 " 0.600 mm 76 984 26
No. 40 " 0.425 mm 606 378 10
No. 50 " 0.300 mm 75 303 8
No. 100 0.150 mm 38 265 7
No. 200 0.075 mm 151 114 3
PAN 8
Wash Passing 200 106
T O T A L 3784

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS

WORKSHEET OF SIEVE ANALYSIS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project : Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Fine Aggregates Spec's Item, No. 1046(2)a
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: MARK IAN M. DELOS REYES Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Computed by: MARK IAN M. DELOS REYES Contractor April 7, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: CALUBAYAN-G-FA-1046-01
Original Weight: 3571
Moistue Content: 2.41 Oven Dried: 3487
Fineness Modulus: 2.30 Washed Oven Dried: 3373

Sieve Designation Weight CUMULATIVE


Governing
% Spec's
Alternate Standard Retained Gram % Weight Passing
Retained Passing Gram %

3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm
3/4 " 19.0 mm
1/2 " 12.5 mm F.M.
3/8 " 9.5 mm 0 0 3487 100 100
No. 4 " 4.75 mm 139 4 3348 96 95-100
No. 8 " 2.36 mm 70 6 3278 94 -
No. 10 " 2.00 mm 279 - 2999 86 -
No. 16 " 1.18 mm 314 23 2685 77 45-80
No. 30 " 0.600 mm 418 35 2267 65 -
No. 40 " 0.425 mm 419 - 1848 53 -
No. 50 " 0.300 mm 837 71 1011 29 5-30
No. 100 0.150 mm 697 91 314 9 0-10
No. 200 0.075 mm 175 2.30 139 4
PAN 25
Wash Passing 200 114
T O T A L 3487
REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro

(Name) (Town /City/ Province)


Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: MARK IAN M. DELOS REYES Contractor April 8, 2022
(Name and Designation) (Office) (Date)
Computed by: MARK IAN M. DELOS REYES Contractor April 8, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: CALUBAYAN-G-CA-900-02
Original Weight: 3764
Moistue Content: 3.21 Oven Dried: 3647
Fineness Modulus: 2.83 Washed Oven Dried: 3544

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm F.M. 100
1" 25.0 mm 0 0 3647 100 95-100
3/4 " 19.0 mm 1349 37 2298 63 -
1/2 " 12.5 mm 1167 69 1131 31 25-60
3/8 " 9.5 mm 475 82 656 18 -
No. 4 " 4.75 mm 474 95 182 5 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 73 2.83 109 3
PAN 6
Wash Passing 200 103
T O T A L 3647

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro

(Name) (Town /City/ Province)


Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: MARK IAN M. DELOS REYES Contractor April 8, 2022
(Name and Designation) (Office) (Date)
Computed by: MARK IAN M. DELOS REYES Contractor April 8, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: CALUBAYAN-G-CA-900-03
Original Weight: 4124
Moistue Content: 1.90 Oven Dried: 4047
Fineness Modulus: 2.90 Washed Oven Dried: 3932

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm F.M. 100
1" 25.0 mm 0 0 4030 100 95-100
3/4 " 19.0 mm 2015 50 2015 50 -
1/2 " 12.5 mm 604 65 1411 35 25-60
3/8 " 9.5 mm 565 79 846 21 -
No. 4 " 4.75 mm 685 96 161 4 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 40 2.9 121 3
PAN 6
Wash Passing 200 115
T O T A L 4030

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental Mind
(Name) (Town /City/ Province)
Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor November 4, 2015
(Name and Designation) (Office) (Date)
Tested by: RUBEN D. VALEZA JR. / ME Contractor November 5, 2015
(Name and Designation) (Office) (Date)
Computed by: RUBEN D. VALEZA JR. / ME Contractor November 5, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-CA-04
Original Weight: 4079
Moistue Content: 1.39 Oven Dried: 4023
Fineness Modulus: 2.97 Washed Oven Dried: 3869

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm F.M. 100
1" 25.0 mm 0 0 4008 100 95-100
3/4 " 19.0 mm 1964 49 2044 51 -
1/2 " 12.5 mm 922 72 1122 28 25-60
3/8 " 9.5 mm 320 80 802 20 -
No. 4 " 4.75 mm 642 96 160 4 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 0 2.97 160 4
PAN 6
Wash Passing 200 154
T O T A L 4008

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental Mind
(Name) (Town /City/ Province)
Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor November 4, 2015
(Name and Designation) (Office) (Date)
Tested by: RUBEN D. VALEZA JR. / ME Contractor November 5, 2015
(Name and Designation) (Office) (Date)
Computed by: RUBEN D. VALEZA JR. / ME Contractor November 5, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-CA-05
Original Weight: 4050
Moistue Content: 1.30 Oven Dried: 3998
Fineness Modulus: 3.05 Washed Oven Dried: 3805

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm F.M. 100
1" 25.0 mm 0 0 3984 100 95-100
3/4 " 19.0 mm 2072 52 1912 48 -
1/2 " 12.5 mm 796 72 1116 28 25-60
3/8 " 9.5 mm 678 89 438 11 -
No. 4 " 4.75 mm 119 92 319 8 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 120 3.05 199 5
PAN 6
Wash Passing 200 193
T O T A L 3984

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental Mind
(Name) (Town /City/ Province)
Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor November 10, 2015
(Name and Designation) (Office) (Date)
Tested by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
Computed by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-CA-06
Original Weight: 4014
Moistue Content: 1.59 Oven Dried: 3951
Fineness Modulus: 3.05 Washed Oven Dried: 3839

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm F.M. 100
1" 25.0 mm 0 0 3934 100 95-100
3/4 " 19.0 mm 2360 60 1574 40 -
1/2 " 12.5 mm 512 73 1062 27 25-60
3/8 " 9.5 mm 236 79 826 21 -
No. 4 " 4.75 mm 551 93 275 7 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 157 3.05 118 3
PAN 6
Wash Passing 200 112
T O T A L 3934

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental Mind
(Name) (Town /City/ Province)
Kind of Materials: Coarse Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor November 10, 2015
(Name and Designation) (Office) (Date)
Tested by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
Computed by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-CA-07
Original Weight: 4005
Moistue Content: 1.60 Oven Dried: 3942
Fineness Modulus: 3.00 Washed Oven Dried: 3791

Sieve Designation Weight CUMULATIVE


Governing
Weight % Spec's
Alternate Standard Retained % Passing Passing
Gram Retained %
Gram
3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm F.M. 100
1" 25.0 mm 0 0 3925 100 95-100
3/4 " 19.0 mm 2316 59 1609 41 -
1/2 " 12.5 mm 431 70 1178 30 25-60
3/8 " 9.5 mm 354 79 824 21 -
No. 4 " 4.75 mm 510 92 314 8 0-10*
No. 8 " 2.36 mm - -
No. 10 " 2.00 mm - -
No. 16 " 1.18 mm - -
No. 30 " 0.600 mm - -
No. 40 " 0.425 mm - -
No. 50 " 0.300 mm - -
No. 100 0.150 mm - -
No. 200 0.075 mm 157 3 157 4
PAN 6
Wash Passing 200 151
T O T A L 3925

REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro

(Name) (Town /City/ Province)


Kind of Materials: Fine Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: RUBEN D. VALEZA JR. / ME Contractor April 8, 2022
(Name and Designation) (Office) (Date)
Computed by: RUBEN D. VALEZA JR. / ME Contractor April 8, 2022
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-FA-03
Original Weight: 4051
Moistue Content: 1.71 Oven Dried: 3983
Fineness Modulus: 2.72 Washed Oven Dried: 3790

Sieve Designation Weight CUMULATIVE


Governing
% Spec's
Alternate Standard Retained Gram % Weight Passing
Retained Passing Gram %

3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm
3/4 " 19.0 mm
1/2 " 12.5 mm F.M.
3/8 " 9.5 mm 0 0 3968 100 100
No. 4 " 4.75 mm 198 5 3770 95 95-100
No. 8 " 2.36 mm 516 18 3254 82 -
No. 10 " 2.00 mm 199 - 3055 77 -
No. 16 " 1.18 mm 357 32 2698 68 45-80
No. 30 " 0.600 mm 516 45 2182 55 -
No. 40 " 0.425 mm 277 - 1905 48 -
No. 50 " 0.300 mm 1111 80 794 20 5-30
No. 100 0.150 mm 477 92 317 8 0-10
No. 200 0.075 mm 119 2.72 198 5
PAN 5
Wash Passing 200 193
T O T A L 3968
REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET OF SIEVE ANALYSIS

Project : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental Mind
(Name) (Town /City/ Province)
Kind of Materials: Fine Aggregates Spec's Item, No. 900
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor November 10, 2015
(Name and Designation) (Office) (Date)
Tested by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
Computed by: RUBEN D. VALEZA JR. / ME Contractor November 11, 2015
(Name and Designation) (Office) (Date)
============================================================================================================
LAB. NUMBER: BNHS-900-FA-04
Original Weight: 3999
Moistue Content: 1.39 Oven Dried: 3944
Fineness Modulus: 2.74 Washed Oven Dried: 3752

Sieve Designation Weight CUMULATIVE


Governing
% Spec's
Alternate Standard Retained Gram % Weight Passing
Retained Passing Gram %

3" 75.0 mm
2 1/2 " 63.0 mm
2" 50.0 mm
1 1/2 " 37.5 mm
1" 25.0 mm
3/4 " 19.0 mm
1/2 " 12.5 mm F.M.
3/8 " 9.5 mm 0 0 3930 100 100
No. 4 " 4.75 mm 196 5 3734 95 95-100
No. 8 " 2.36 mm 590 20 3144 80 -
No. 10 " 2.00 mm 196 - 2948 75 -
No. 16 " 1.18 mm 276 32 2672 68 45-80
No. 30 " 0.600 mm 510 45 2162 55 -
No. 40 " 0.425 mm 276 - 1886 48 -
No. 50 " 0.300 mm 1061 79 825 21 5-30
No. 100 0.150 mm 550 93 275 7 0-10
No. 200 0.075 mm 78 2.74 197 5
PAN 5
Wash Passing 200 192
T O T A L 3930
REMARKS:
Grading Satisfactory

PREPARED/TESTED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES CARLO C. MANALO MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
12.76
15

30
6
12.75
12.75
6
12.75
6
12.75 `
6
12.75
6
12.75
6
12.75
6
12.75
6
12.75
6
12.75
12.75
12.75
12.75
12.75
12.75
12.75
16.5

37.5

12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
12.75
FRAMECON BUILDERS

============
FRAMECON BUILDERS

============

12

21
FRAMECON BUILDERS

============
FRAMECON BUILDERS

============
FRAMECON BUILDERS

============
FRAMECON BUILDERS

============

12

21
FRAMECON BUILDERS

============
FRAMECON BUILDERS

============
FRAMECON BUILDERS

agana, Naujan, Oriental Mindoro

============
FRAMECON BUILDERS

agana, Naujan, Oriental Mindoro

============
FRAMECON BUILDERS

agana, Naujan, Oriental Mindoro

============
FRAMECON BUILDERS

agana, Naujan, Oriental Mindoro

============
FRAMECON BUILDERS

============

12

21
FRAMECON BUILDERS

agana, Naujan, Oriental Mindoro

============

12

21
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR SOUNDNESS OF AGGREGATE


BY USE OF SODIUM SULFATE

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


PROJECT: Barangay Masagana, Naujan, Oriental Mindoro
(Name) (Town/City/Province)
KIND OF MATERIALS: Fine Aggregates Spec's Item No.: 900
SAMPLED AT: Jobsite Stockpile
(Give as accurate a location as possible)
ORIGINAL SOURCE: Tigkan River
(Pit, Quarry, River, etc. and location)
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES April 7, 2022
(Name and Designation) (Office) (Date)
TESTED BY: MQC Personnel DPWH April 14, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC Personnel DPWH April 14, 2022
(Name and Designation) (Office) (Date)

FINE AGGREGATE

Lab. Number : CC-PARANG-S-FA-01

1 2 3 4 5 6
Sieve Size (mm.) Grading of Weight of Weight of Weight Actual % Corrected

Passing Retained Orig. sample sample sample Loss, (g.) Loss % Loss

(% Retained) before test after test (2) - (3) (4)/(2)x(100) (5)x(1)/(100)


(g.) (g.)
0.150 (#100) -
0.300 (#50) 0.150 (#100) 4 100 96.00 4.00 4.00 0.16
0.600 (#30) 0.300 (#50) 19 100 90.00 10.00 10.00 1.9
1.18 (#16) 0.600 (#30) 33 100 98.00 2.00 2.00 0.66
2.36 (#8) 1.18 (#16) 29 100 98.00 2.00 2.00 0.58
4.75 (#4) 2.36 (#8) 2 100 96.00 4.00 4.00 0.08
9.5 (3/8") 4.75 (#4) 4 100 86.00 14.00 14.00 0.56
Specification - 10% max. TOTAL 3.78

Prepared by: Checked by: Noted By:

KEVIN E. GARCIA ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR SOUNDNESS OF AGGREGATE


BY USE OF SODIUM SULFATE

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


PROJECT: Barangay Masagana, Naujan, Oriental Mindoro
(Name) (Town/City/Province)
KIND OF MATERIALS: Coarse Aggregates Spec's Item No.: 900
SAMPLED AT: Jobsite Stockpile
(Give as accurate a location as possible)
ORIGINAL SOURCE: Tigkan River
(Pit, Quarry, River, etc. and location)
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES April 7, 2022
(Name and Designation) (Office) (Date)
TESTED BY: MQC Personnel DPWH April 14, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC Personnel DPWH April 14, 2022
(Name and Designation) (Office) (Date)

COARSE AGGREGATE

Lab. Number : CC-PARANG-S-CA-01

1 2 3 4 5 6
Sieve Size (mm.) Grading of Weight of Weight of Weight Actual % Corrected

Passing Retained Orig. sample sample sample Loss, (g.) Loss % Loss

(% Retained) before test after test (2) - (3) (4)/(2)x(100) (5)x(1)/(100)


(g.) (g.)
63.00 (21/2") 37.50 (11/2")
37.50 (11/2") 19.00 (3/4") 27 1500 1485.00 15.00 1.00 0.27
19.00 (3/4") 9.50 (3/8") 51 1000 985.00 15.00 1.50 0.77
9.50 (3/8") 4.75 (#4) 18 300 275.00 25.00 8.33 1.50
Specification - 12% max. TOTAL 2.54

Prepared by: Checked by: Noted By:

KEVIN E. GARCIA ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

TEST ON CLAY LUMPS OF FINE AGGREGATES

Lab. No.: CC-PARANG-CL-FA-01

PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan,
Oriental Mindoro
Socorro, Oriental Mindoro
KIND OF MATERIALS: Fine Aggregates SPECS. ITEM NO.: 900
TESTED BY: MQC Personnel DPWH - MODEO April 7, 2022
(Name & Designation) (Office) (Date)
COMPUTED BY: MQC Personnel DPWH - MODEO April 7, 2022
(Name & Designation) (Office) (Date)

(M-R)
P= x 100
M
Where:
P = Percent of clay lumps and friable particles
M = Mass of test sample (for fine aggregate the mass of the portion coarser than
the 1.18 mm (No. 16) sieve and shall have a mass not less than 25 g)
R = Mass of particles retained on designated sieve

(M-R)
P= x 100
M

25 - 24.8
= x 100
25

P= 0.80% SPEC'S = 1% Max.

Prepared by: Checked by: Noted By:

KEVIN E. GARCIA ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR CLAY LUMPS / FRIABLE PARTICLES

Lab. No.: CC-PARANG-CL-CA-01

PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan,
Oriental Mindoro
Socorro, Oriental Mindoro
KIND OF MATERIALS: Coarse Aggregates SPECS. ITEM NO.: 900
TESTED BY: MQC Personnel DPWH - MODEO April 7, 2022
(Name & Designation) (Office) (Date)
COMPUTED BY: MQC Personnel DPWH - MODEO April 7, 2022
(Name & Designation) (Office) (Date)

COARSE AGGREGATES

Grading of Orig. Sample Weight of test sample Weight of sample Clay Lump %
Sieve Size (mm)
(% Retained) (g.) retained (g.) Friable Particles
Over 11/2"
11/2" - 37.50 mm
3/4" - 19.00 mm 27 2000 1998 0.100
3/8" - 9.50 mm 78 1000 999 0.100
Specification - 0.25% max. Ave. Clay Lumps/ Friable Particles 0.100

Prepared by: Checked by: Noted By:

KEVIN E. GARCIA ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR ORGANIC IMPURITIES

PROJECT:

KIND OF MATERIALS:
SAMPLED AT:

SAMPLED BY:
(Name & Designation) (Office) (Date)
TESTED BY:
(Name & Designation) (Office) (Date)
COMPUTED BY:
(Name & Designation) (Office) (Date)

Lab. No.:

REAGENTS AND REFERENCE STANDARD COLOR SOLUTION:

1. Weight of Sample in Bottle level ml

2. Weight of 3% Sodium Hydroxide Solution ml

3. Weight of Water in Bottle ml

4. Color Value Lighter color

5. Injurious organic compound in natural sands NONE

Prepared by: Noted By:

KEVIN E. GARCIA MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Lab. Report No. CALUBAYAN-Q-FA


Date April 14, 2022

TEST REPORT ON CONCRETE AGGREGATE

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay


Project Masagana, Naujan, Oriental Mindoro
Location Socorro, Oriental Mindoro
Kind of Materials Fine Aggregate
Sample Identification QT-FA-01
Quantity Represented 1500.00 CU.M.
Sampled at Stockpile at Contractor's Quarry
Original Source Tigkan River
Supplied by MIDR CONSTRUCTION AND SUPPLIES
Proposed Use For Concreting Works
Spec's Item No. 900
Sampled by Contractor's Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Submitted by Engr. MERCEDES G. ASPI-Engr. III DPWH-Calapan April 14, 2022
(Name and Designation) (Office) (Date Received)
Lab. No. TRCA-QT-FA-01

TESTS REQUIREMENTS RESULTS


Sieve Analysis: Cummulative % passing
Sieve Size, mm (Grading "A")
9.50 mm (3/8") 100 100
4.75 mm (#4 ) 95-100 96
2.36 mm (# 8 ) - 94
1.18 mm (# 16) 45-80 65
0.60 mm (#30) - 32
0.30 mm (#50) 5-30 13
0.15 mm (#100) 0-10 9
0.075mm (#200) 3 max. 1
Fineness Modulus 2.91
Bulk Specific Gravity 2.68
Absorption, % 0.20
Clay Lumps. % 1 max. 0.80%
Soundness (Na2SO4),% Loss 10 max. 3.78
Organic Impurities(Colormatic Test) Equal or Lighter than standard Lighter color
Mortar Strength, % 95 min. N/T
Dry Unit Mass, kg/cu.m. :
Loose 1572.77
Rodded 1676.73
REMARKS :
Sampled tested passed to meet Specification requirements. Washing is recommended prior to use.
Tested by: Certified Correct:

MA. VIVIENE M. TOLENTINO ROCKY TOM BERNARD S. ROMASANTA


Laboratory Technician I Engineer II

Checked by: Attested by:

KEVIN E. GARCIA MERCEDES G. ASPI


Engineer II Engineer III
Chief, Quality Assurance Section
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER

Lab. Report No. CALUBAYAN-Q-CA


Date April 14, 2022

TEST REPORT ON CONCRETE AGGREGATE

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay


Project Masagana, Naujan, Oriental Mindoro
Location Socorro, Oriental Mindoro
Kind of Materials Coarse Aggregate
Sample Identification QT-CA-01
Quantity Represented 1500.00 CU.M.
Sampled at Stockpile at Contractor's Quarry
Original Source Tigkan River
Supplied by MIDR CONSTRUCTION AND SUPPLIES
Proposed Use For Concreting Works
Spec's Item No. 900
Sampled by Contractor's Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Submitted by Engr. MERCEDES G. ASPI-Engr. III DPWH-Calapan April 14, 2022
(Name and Designation) (Office) (Date Received)
Lab. No. TRCA-QT-CA-01
TESTS REQUIREMENTS RESULTS
Sieve Analysis: Cummulative % passing
Sieve Size, mm (Grading "A")
50.0 mm 2 "
37.5 mm 1 1/2 "
25.0 mm 1 " 95-100 100
19.0 mm 3/4 " - 73
12.5 mm 1/2 " 25-60 40
9.5 mm 3/8 " - 22
4.75 mm No. 4 " 0-10* 4
0.075mm (#200) 1
Fineness Modulus -
Bulk Specific Gravity 2.67
Absorption, % 1.014
Clay Lumps. % 1 max. 0.100
Soundness (Na2SO4),% Loss 12 max. 2.54
Abrasion, % 40% max 25.10
Organic Impurities(Colormatic Test) Equal or Lighter than standard -
Mortar Strength, % 95 min. N/T
Dry Unit Mass, kg/cu.m. :
Loose 1750.99
Rodded 1963.86
REMARKS :
Sampled tested passed to meet Specification requirements. Washing is recommended prior to use.
Tested by: Certified Correct:

MA. VIVIENE M. TOLENTINO ROCKY TOM BERNARD S. ROMASANTA


Laboratory Technician I Engineer II

Checked by: Attested by:

KEVIN E. GARCIA MERCEDES G. ASPI


Engineer II Engineer III
Chief, Quality Assurance Section
3" 75.0 mm
95-100 2 1/2 " 63.0 mm

35-70

10-30

0-5
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

STATEMENT OF TEST PERFORMED


(Materials Testing Fund)

For the Month of January, 2015

STP Report : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered


PROJECT: Court) at Barangay Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Under Contract with : MIDR CONSTRUCTION AND SUPPLIES

TEST
DESCRIPTION OF MATERIALS UNIT RATE TOTAL COST
PERFORMED
Compressive Test:
Concrete Cylinder sample 39 pcs. 140.00 5460.00
4" CHB 1 set 1290.00 1290.00
6"CHB 1 pcs. 1290.00 1290.00
Quality Test:
Fine Aggregate (FA) 1 set 1,860.00 1860.00
Coarse Aggregate (CA), 1 set 1,830.00 1830.00

x-x-x-x

TOTAL: ElevenThousand Seven Hundred Thirty Pesos Only 11,730.00


NOTE: Report of Test covered by this statement are on file with this office.

PREPARED BY: APPROVED:

ROCKY TOM S. ROMASANTA ALBIEN M. MAHIA


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

STATEMENT OF TEST PERFORMED


(Materials Testing Fund)

October 30, 2017

STP Report :
PROJECT: Construction of One Storey Two Classroom at F. Samaco M/S Calapan City
Location : Calapan City, Oriental Mindoro
Under Contract with : DELROL ENTERPRISES

TEST
DESCRIPTION OF MATERIALS UNIT RATE TOTAL COST
PERFORMED

RSB-16mm def. 1 pcs. 1,070.00 1070.00


RSB-10mm def. 1 pcs. 1,070.00 1070.00
75x75x6mm Angle Bar 1 set 1,370.00 1370.00
Compressive Test:
Concrete Cylinder sample 21 pcs. 140.00 2940.00
6"CHB 1 pcs. 1290.00 1290.00
Quality Test:
Fine Aggregate (FA) 1 set 1,860.00 1860.00
Coarse Aggregate (CA), 1 set 1,830.00 1830.00
x-x-x-x

TOTAL: Eleven Thousand Four Hundred Thirty Pesos Only


NOTE: Report of Test covered by this statement are on file with this office.

PREPARED BY: APPROVED:

ROCKY TOM S. ROMASANTA ALBIEN M. MAHIA


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

MATERIALS LOGBOOK

Date and Day :


Weather AM : PM :
Name of Project : Construction of Multi-Purpose Building(Covered Court), Sitio Benedict, Brgy. Pachoca, Calapan City

PROJECT ACTIVITIES :

MATERIALS QUALITY CONTROL ACTIVITIES :

COMMENTS :

VISITORS :

ROCKY TOM BERNARD S. ROMASANTA


Materials Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

MATERIALS LOGBOOK

Date and Day : August 12, 2016


Weather AM : Fair PM : Sunny Day
Name of Project : Construction of Multi-Purpose Building(Covered Court), Sitio Benedict, Brgy. Pachoca, Calapan City

PROJECT ACTIVITIES :

###
###
Masonry Works (CHB)

MATERIALS QUALITY CONTROL ACTIVITIES :

Preparation of Sample for Structural Concrete (Cylinder Samples)

COMMENTS :

VISITORS :

Rocky Tom S. Romasanta


Materials Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

MATERIALS LOGBOOK

Date and Day : September 05, 2016


Weather AM : Sunny Day PM : Sunny Day
Name of Project : Construction of Multi-Purpose Building(Covered Court), Sitio Benedict, Brgy. Pachoca, Calapan City

PROJECT ACTIVITIES :

###
###
Metal Structure Accessories, Cross Bracing
Occupational Safety and Health Program

MATERIALS QUALITY CONTROL ACTIVITIES :

Breaking of Sample for Column (Cylinder Samples)

COMMENTS :

VISITORS :
Rocky Tom S. Romasanta
Materials Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

MATERIALS LOGBOOK

Date and Day : September 25, 2016


Weather AM : Cloudy Day PM : Cloudy Day
Name of Project : Construction of Multi-Purpose Building(Covered Court), Sitio Benedict, Brgy. Pachoca, Calapan City

PROJECT ACTIVITIES :

PCCP(Plain)-Conventional Method, 280mm thk.)

MATERIALS QUALITY CONTROL ACTIVITIES :

Preparation of Sample for PCCP (Beam Samples)

COMMENTS :

VISITORS :
Rocky Tom S. Romasanta
Materials Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of March 24, 2021 - March 30, 2021. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


803(1)a Structure Excavation(Common Soil) 29.80 cu.m.
804(1)a Embankment from Structure Excavation 6.87 cu.m.
804(1)b Embankment from Common Borrow 12.96 cu.m.
1027(1) Cement Plaster Finish 174.72 cu.m.
1047(2)b Structural Steel, Purlins 2704.08 kgs
1047(3)b Metal Structure Accessories, Sag Rods 78.00 pcs
1047(3)d Metal Structure Accessories, Cross Bracing 12.00 pcs
1047(3)c Metal Structure Accessories, Turn Buckle 12.00 pcs

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of April 1, 2021 - April 7, 2021. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


804(1)a Embankment from Structure Excavation 6.86 cu.m.
804(1)b Embankment from Common Borrow 12.96 cu.m.
902(1)a1 Reinforcing Steel Deformed, Grade 40 1389.00 kgs.
1046(2)a1 100mm CHB Non Load Bearing Wall 68.58 sq.m.
1047(3)b Metal Structure Accessories, Sag Rods 78.00 pcs
1047(3)d Metal Structure Accessories, Cross Bracing 12.00 pcs
1047(3)c Metal Structure Accessories, Turn Buckle 12.00 pcs
Conduit, Boxes and Fittings(Conduit
1100(10) Works/Conduit Rough ins) 0.50 L.s.
1101(33) Wires and Wiring Devices 0.50 L.s.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of April 8, 2021 - April 15, 2021. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


804(4) Gravel Fill 0.69 cu.m.

900(1)c2 Structural Concrete(Footings and Slab on Fill) 40.50 cu.m.


902(1)a1 Reinforcing Steel Deformed, Grade 40 1389.26 kgs.
903(2) Forms and Falseworks 29.16 sq.m.
1046(2)a1 100mm CHB Non Load Bearing Wall 68.58 sq.m.
Conduit, Boxes and Fittings(Conduit
1100(10) Works/Conduit Rough ins) 0.50 L.s.
1101(33) Wires and Wiring Devices 0.50 L.s.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of April 16, 2021 - April 22, 2021. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


804(4) Gravel Fill 0.69 cu.m.
1032(1)a Painting Works(Masonry/Concrete) 83.20 sq.m.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of April 23, 2021 - April 30, 2021. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


1032(1)a Painting Works(Masonry/Concrete) 83.20 sq.m.
1032(1)c Painting Works(Steel) 68.49 sq.m.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of May 1, 2021 - May 7, 2021. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


1032(1)a Painting Works(Masonry/Concrete) 83.20 sq.m.
1032(1)c Painting Works(Steel) 68.49 sq.m.
Prepainted Metal Sheets Long span, above
1014(1)b1 0.427mm, Corrugated Type 188.00 sq.m.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of May 8, 2021 - May 15, 2021. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


1032(1)c Painting Works(Steel) 68.49 sq.m.
Prepainted Metal Sheets Long span, above
1014(1)b1 0.427mm, Corrugated Type 188.00 sq.m.
Fabricated Metal Roofing Accessory, gauge 26
1013(2)a1 Ridge/Hip Rolls 15.60 sq.m.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of May 16, 2021 - May 22, 2021. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


Prepainted Metal Sheets Long span, above
1014(1)b1 0.427mm, Corrugated Type 188.00 sq.m.
Fabricated Metal Roofing Accessory, gauge 26
1013(2)a1 Ridge/Hip Rolls 15.60 sq.m.
Fabricated Metal Roofing Accessory, gauge 26
1013(2)a2 Flashings 50.40 L.m.
Fabricated Metal Roofing Accessory, gauge 24,
1013(2)b1 Gutters 31.20 L.m.
1001(9) Storm Drainage and Downspout 0.50 L.s.
1102(1) Panelboard with Main and Branch Breakers 0.50 L.s.
1103(1) Lighting Fixtures and Lamps 0.50 L.s.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of May 23, 2021 - May 27, 2021. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


Fabricated Metal Roofing Accessory, gauge 26
1013(2)a2 Flashings 50.40 L.m.
Fabricated Metal Roofing Accessory, gauge 24,
1013(2)b1 Gutters 31.20 L.m.
1001(9) Storm Drainage and Downspout 0.50 L.s.
1102(1) Panelboard with Main and Branch Breakers 0.50 L.s.
1103(1) Lighting Fixtures and Lamps 0.50 L.s.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of August 16, 2019 - August 22, 2019. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


1027(1) Cement Plaster Finish 34.36 sq.m.
1047(2)a Structural Steel, Trusses 2600.00 kgs.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of August 23, 2019 - August 31, 2019. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


1027(1) Cement Plaster Finish 25.00 sq.m.
1047(2)b Structural Steel, Purlins 1000.00 kgs.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of September 1, 2019 - September 7, 2019. We further certify that we
have found that the quality of materials in the following items of work corresponding to the quantity
accomplished conforms with the Standard Specifications work corresponding to the quantity accomplished
conforms with the Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


1027(1) Cement Plaster Finish 24.24 sq.m.
1047(2)b Structural Steel, Purlins 1337.72 kgs.
1047(7)b Metal Structure Accessories, Sag Rods 76.72 kgs.
1047(4) Metal Structure Accessories, Cross Bracing 198.80 kgs.
1047(3)c Metal Structure Accessories, Turn Buckle 16.00 kgs.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of September 8, 2019 - September 15, 2019. We further certify that we
have found that the quality of materials in the following items of work corresponding to the quantity
accomplished conforms with the Standard Specifications work corresponding to the quantity accomplished
conforms with the Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


Prepainted Metal Sheets Long span, above
1014(1)b1 0.427mm, Corrugated Type 507.30 sq.m.
Fabricated Metal Roofing Accessory, gauge 26
1013(2)a1 Ridge/Hip Rolls 25.70 sq.m.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of September 16, 2019 - September 25, 2019. We further certify that
we have found that the quality of materials in the following items of work corresponding to the quantity
accomplished conforms with the Standard Specifications work corresponding to the quantity accomplished
conforms with the Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

1003(11)a1 Fascia Board 53.40 l.m.


Fabricated Metal Roofing Accessory, gauge 26
1013(2)a2 Flashings 41.00 sq.m.
Fabricated Metal Roofing Accessory, gauge 26
1013(2)b1 Gutters 53.40 sq.m.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of June 8, 2018 - June 13, 2018. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

WORK SUSPENDED

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of June 22, 2018 - June 29, 2018. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

WORK SUSPENDED

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of June 22, 2018 - June 29, 2018. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of July 1, 2018 - July 5, 2018. We further certify that we have found that
the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 0.00%


1014(1)b1 Prepainted Metal Sheets(Corrugated-Type) 201.42 sq.m.

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE


23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
PROJECT : Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of May 14, 2018 - May 15, 2018. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

WORK SUSPENDED

=============================================================================================

CARLO C. MANALO EDILBERTO C. GODOY


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of March 8, 2022 - March 15, 2022. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.3 Permits and Clearances 1.00 L.s.


B.5 Project Billboard / Signboard 1.00 each
B.7 Occupational Safety and Health Program 10.00%
800(1) Clearing and Grubbing 95.00 sq.m.
803(1)a Structure Excavation(Common Soil) 84.58 cu.m.
804(1)a Embankment from Road/Structure Excavation 50.00 cu.m.
804(1)b Embankment from Borrow 30.00 cu.m.
804(4) Gravel Fill 12.85 cu.m.
902(1)a1 Reinforcing Steel Deformed, Grade 40 1000.00 kgs.
1000(1) Soil Poisoning 6.00 L

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of March 16, 2022 - March 22, 2022. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%

804(1)a Embankment from Road/Structure Excavation 24.42 cu.m.


804(1)b Embankment from Borrow 32.08 cu.m.
Structural Concrete(Footings and Slab on Fill),
900(1)c2 Class A, 28 days 23.40 cu.m.

900(1)c3 Structural Concrete(Footing Tie Beam), 28 days A 2.82 cu.m.


902(1)a1 Reinforcing Steel Deformed, Grade 40 1000.00 kgs.
903(2) Forms and Falseworks 60.00 sq.m.
1046(2)a2 150mm CHB Non Load Bearing Wall 100.00 sq.m.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of March 23, 2022 - March 28, 2022. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


900(1)c4 Structural Concrete(Columns) A ,28 days 6.41 cu.m.
902(1)a1 Reinforcing Steel Deformed, Grade 40 462.42 kgs.
903(2) Forms and Falseworks 60.00 sq.m.
1046(2)a1 100mm CHB Non Load Bearing Wall 37.32 sq.m.
1046(2)a2 150mm CHB Non Load Bearing Wall 84.59 sq.m.
1001(11) Septic Vault9concrete/CHB) 1.00 L.s.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of March 8, 2022 - March 15, 2022. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


804(1)b Embankment from Borrow 50.00 cu.m.
900(1)c4 Structural Concrete(Column), A, 28 days 11.16 cu.m.

900(1)c6 Structural Concrete(Beams/Girder), A, 28 days 1.60 cu.m.


902(1)a1 Reinforcing Steel Defomed, Grade 40 1000.00 kgs.
903(2) Formworks and Falseworks 100.00 sq.m.
1046(2)a1 100mm CHB Non Load Bearing Wall 25.00 sq.m.
1046(2)a2 150mm CHB Non Load Bearing Wall 25.00 sq.m.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of March 16, 2022 - March 22, 2022. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


804(1)b Embankment from Borrow 50.00 cu.m.
902(1)a1 Reinforcing Steel Defomed, Grade 40 1000.00 kgs.
903(2) Formworks and Falseworks 50.00 sq.m.
1046(2)a1 100mm CHB Non Load Bearing Wall 50.00 sq.m.
1046(2)a2 150mm CHB Non Load Bearing Wall 50.00 sq.m.
1047(2)a Structural Steel, Trusses 4000.00 kgs.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of March 23, 2022 - March 25, 2022. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


902(1)a1 Reinforcing Steel Defomed, Grade 40 500.00 kgs.
903(2) Formworks and Falseworks 50.00 sq.m.
1046(2)a1 100mm CHB Non Load Bearing Wall 25.00 sq.m.
1046(2)a2 150mm CHB Non Load Bearing Wall 25.00 sq.m.
1047(2)a Structural Steel, Trusses 4000.00 kgs.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of March 16, 2021 - March 23, 2021. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


1032(1)c Painting Works(Steel) 105.48 sq.m.
1047(2)a Structural Steel, Trusses 3626.02 kgs.
1047(3)a Metal Structure Accessories, Bolts 24.00 pcs
1047(6) Metal Structure Accessories, Steel Plates 91.78 kgs.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of August 1, 2019 - August 7, 2019. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


1027(1) Cement Plaster Finish 25.00 sq.m.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of August 8, 2019 - August 15, 2019. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


1027(1) Cement Plaster Finish 25.00 sq.m.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of August 16, 2019 - August 22, 2019. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


1027(1) Cement Plaster Finish 34.36 sq.m.
1047(2)a Structural Steel, Trusses 2600.00 kgs.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of August 23, 2019 - August 31, 2019. We further certify that we have
found that the quality of materials in the following items of work corresponding to the quantity accomplished
conforms with the Standard Specifications work corresponding to the quantity accomplished conforms with the
Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


1027(1) Cement Plaster Finish 25.00 sq.m.
1047(2)b Structural Steel, Purlins 1000.00 kgs.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of September 1, 2019 - September 7, 2019. We further certify that we
have found that the quality of materials in the following items of work corresponding to the quantity
accomplished conforms with the Standard Specifications work corresponding to the quantity accomplished
conforms with the Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


1027(1) Cement Plaster Finish 24.24 sq.m.
1047(2)b Structural Steel, Purlins 1337.72 kgs.
1047(7)b Metal Structure Accessories, Sag Rods 76.72 kgs.
1047(4) Metal Structure Accessories, Cross Bracing 198.80 kgs.
1047(3)c Metal Structure Accessories, Turn Buckle 16.00 kgs.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of September 8, 2019 - September 15, 2019. We further certify that we
have found that the quality of materials in the following items of work corresponding to the quantity
accomplished conforms with the Standard Specifications work corresponding to the quantity accomplished
conforms with the Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 10.00%


Prepainted Metal Sheets Long span, above
1014(1)b1 0.427mm, Corrugated Type 507.30 sq.m.
Fabricated Metal Roofing Accessory, gauge 26
1013(2)a1 Ridge/Hip Rolls 25.70 sq.m.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of September 16, 2019 - September 25, 2019. We further certify that
we have found that the quality of materials in the following items of work corresponding to the quantity
accomplished conforms with the Standard Specifications work corresponding to the quantity accomplished
conforms with the Standard Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

1003(11)a1 Fascia Board 53.40 l.m.


Fabricated Metal Roofing Accessory, gauge 26
1013(2)a2 Flashings 41.00 sq.m.
Fabricated Metal Roofing Accessory, gauge 26
1013(2)b1 Gutters 53.40 sq.m.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of June 8, 2018 - June 13, 2018. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

WORK SUSPENDED

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of June 22, 2018 - June 29, 2018. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

WORK SUSPENDED

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of June 22, 2018 - June 29, 2018. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE

PROJECT : 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of July 1, 2018 - July 5, 2018. We further certify that we have found that
the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

B.7 Occupational Safety and Health Program 0.00%


1014(1)b1 Prepainted Metal Sheets(Corrugated-Type) 201.42 sq.m.

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CERTIFICATE OF QUALITY CONTROL ASSURANCE


23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
PROJECT : Barangay Masagana, Naujan, Oriental Mindoro
LOCATION : Socorro, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES

We hereby certify that we have conducted an inspection and verification on work accomplished on the
above mentioned project for the period of May 14, 2018 - May 15, 2018. We further certify that we have found
that the quality of materials in the following items of work corresponding to the quantity accomplished conforms
with the Standard Specifications work corresponding to the quantity accomplished conforms with the Standard
Specifications and Special Provisions of the Contract Viz:

ITEM NO. DESCRIPTION ACCOMPLISHED

WORK SUSPENDED

=============================================================================================

CARLO C. MANALO MARK LESTER B. CABRAL


Materials Engineer Project Engineer
NAME OF PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro
CONTRACT ID NO. : 22ED0084 EFFECTIVITY DATE :
CONTRACTOR : MIDR CONSTRUCTION AND SUPPLIES CONTRACT TIME :
LOCATION : Socorro, Oriental Mindoro EXPIRY DATE :
CONTRACT COST : Php4,871,686.09 DESCRIPTION :
A. TEST TO BE PERFORMED:

JULY AUGUST SEPTEM


Original
Item No. Description Unit Quantity Total 1-7 8-15 16-22 23-30 1-7 8-15 16-22 23-30 1-7 8-15

PART II OTHER GENERAL REQUIREMENTS


B.3 Permits and Clearances L.s. 1.00 1.00
B.5 Project Billboard/Signboard ea 1.00 1.00
B.7 Occupational Safety and Health Officer L.s. 1.00 1.00 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
PART A EARTHWORKS
101(1) Clearing and Grubbing sq.m. 614.00 614.00
803(1)a Structure Excavation(Common Soil) cu.m. 72.06 72.06
804(1)a Embankment from Road/Structure Excavation cu.m. 43.95 43.95
804(1)b Embankment from Borrow cu.m. 115.95 115.95
804(4) Gravel Fill cu.m. 60.96 60.96
PART B PLAIN AND REINFORCED CONCRETE WORKS -
900(1)c2 Structural Concrete(Footings and Slab on Fill), Class A, 28 d cu.m. 65.23 65.23
900(1)c3 Structural Concrete(Footing Tie Beam), 28 days, A cu.m. 11.89 11.89
900(1)c4 Structural Concrete(Columns), A, 28 days cu.m. 15.48 15.48
900(1)c6 Structural Concrete(Beams/Girders), A, 28 days cu.m. 4.74 4.74
902(1)a1 Reinforcing Steel Deformed, Grade 40 kgs. 7,186.66 7186.66
903(2) Forms and Falseworks sq.m. 143.13 143.13
PART C FINISHING
1046(2)a1 100mm CHB Non Load Bearing Wall sq.m. 382.22 382.22 150.00 117.55
Err:509 Err:509 Err:509 Err:509 1.00
Err:509 Err:509 Err:509 Err:509 858.88 200.00 200.00 200.00 258.88
Err:509 Err:509 Err:509 Err:509 1.00
1003(1)a1 Ceiling Fiber Cement Board, 4.5mm Metal Frame sq.m. 66.01 66.01
Err:509 Err:509 Err:509 Err:509 67.43
Err:509 Err:509 Err:509 Err:509 72.20
1032(1)a1 Painting Works, Masonry/Concrete sq.m. 858.88 858.88
1032(1)c Painting Works, Steel sq.m. 567.40 567.40 300.00 267.40
1014(1)b2 Prepainted Metal, Sheets Long Span,Rib Type, above 0.427t sq.m. 706.30 706.30 400.00 306.30
1013(2)a1 Fabricated Metal Roofing Accessory gauge 26, Ridge/Hip Ro l.m. 103.20 103.20 50.00 53.20
1013(2)a2 Fabricated Metal Roofing Accessory gauge 26, Flashing l.m. 27.00 27.00 14.00 13.00
1014(1)b1 Prepainted Metal Sheets Long Span, above 0.427mm, Corru l.m. 647.87 149.50 75.00 74.50
1047(2)a Structural Steel Trusses kgs. 10,988.19 7577.54 3000.00 3000.00 1577.54
1047(2)b Structural Steel Purlins kgs. 3,089.91 4015.42 2000.00 2015.42
Err:509 Err:509 Err:509 Err:509 722.40 361.20 361.20
1047(3)a Metal Structure Accessories(Bolts) pcs 96.00 98.00 49.00 49.00
1047(3)b Metal Structure Accessories(Sagrods) pcs 156.00 32.00 16.00 16.00
1047(3)c Metal Structure Accessories(Turn Buckle) pcs 24.00 64.00 32.00 32.00
1047(5)c Metal Structure Accessories, Cross Bracing pcs 229.80 104.00 52.00 52.00
1047(5d) Metal Structure Accessories, Steel Plates L.s. 1.00 1.00
1001(9) Storm Drainage and Downspout L.s. 1.00 1.00
1100(10) Conduit Boxes and Fittings(Conduit Works/ Conduit Rough- L.s. 1.00 1.00
1101(33) Wires and Wiring Devices L.s. 1.00 1.00
1102(1) Panelboard with Main and Branch Breakers L.s. 1.00 1.00
1103(1) Lighting Fixtures and Lamps L.s. 1.00 1.00
ROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan, Oriental Mindoro
D NO. : 22ED0084 EFFECTIVITY DATE :
OR : MIDR CONSTRUCTION AND SUPPLIES CONTRACT TIME :
: Socorro, Oriental Mindoro EXPIRY DATE :
COST : Php4,871,686.09 DESCRIPTION :
BE PERFORMED:

SEPTEMBER
MARCH OCTOBER NOVEMBER
Original
Description Unit Quantity Total 16-22 23-24 1-2 9-10 1-7 8-16

OTHER GENERAL REQUIREMENTS


Permits and Clearances L.s. 1.00 1.00
Project Billboard/Signboard ea 1.00 1.00
Occupational Safety and Health Officer L.s. 1.00 1.00 0.05 0.04 0.04 0.04 0.04 0.04
EARTHWORKS
Clearing and Grubbing sq.m. 614.00 614.00
Structure Excavation(Common Soil) cu.m. 72.06 72.06
Embankment from Road/Structure Excavation cu.m. 43.95 43.95
Embankment from Borrow cu.m. 115.95 115.95
Gravel Fill cu.m. 60.96 60.96
PLAIN AND REINFORCED CONCRETE WORKS -
Structural Concrete(Footings and Slab on Fill), Class A, 28 d cu.m. 65.23 65.23
Structural Concrete(Footing Tie Beam), 28 days, A cu.m. 11.89 11.89
Structural Concrete(Columns), A, 28 days cu.m. 15.48 15.48
Structural Concrete(Beams/Girders), A, 28 days cu.m. 4.74 4.74
Reinforcing Steel Deformed, Grade 40 kgs. 7,186.66 7186.66
Forms and Falseworks sq.m. 143.13 143.13
FINISHING
100mm CHB Non Load Bearing Wall sq.m. 382.22 382.22
Err:509 Err:509 Err:509 1.00 1.00
Err:509 Err:509 Err:509 858.88
Err:509 Err:509 Err:509 1.00 1.00
Ceiling Fiber Cement Board, 4.5mm Metal Frame sq.m. 66.01 66.01 66.01
Err:509 Err:509 Err:509 67.43 67.43
Err:509 Err:509 Err:509 72.20 72.20
Painting Works, Masonry/Concrete sq.m. 858.88 858.88 300.00 300.00 258.88
Painting Works, Steel sq.m. 567.40 567.40
Prepainted Metal, Sheets Long Span,Rib Type, above 0.427t sq.m. 706.30 706.30
Fabricated Metal Roofing Accessory gauge 26, Ridge/Hip Ro l.m. 103.20 103.20
Fabricated Metal Roofing Accessory gauge 26, Flashing l.m. 27.00 27.00
Prepainted Metal Sheets Long Span, above 0.427mm, Corru l.m. 647.87 149.50
Structural Steel Trusses kgs. 10,988.19 7577.54
Structural Steel Purlins kgs. 3,089.91 4015.42
Err:509 Err:509 Err:509 722.40
Metal Structure Accessories(Bolts) pcs 96.00 98.00
Metal Structure Accessories(Sagrods) pcs 156.00 32.00
Metal Structure Accessories(Turn Buckle) pcs 24.00 64.00
Metal Structure Accessories, Cross Bracing pcs 229.80 104.00
Metal Structure Accessories, Steel Plates L.s. 1.00 1.00 1.00
Storm Drainage and Downspout L.s. 1.00 1.00 1.00
Conduit Boxes and Fittings(Conduit Works/ Conduit Rough- L.s. 1.00 1.00 0.50 0.50
Wires and Wiring Devices L.s. 1.00 1.00 0.50 0.50
Panelboard with Main and Branch Breakers L.s. 1.00 1.00 0.50 0.50
Lighting Fixtures and Lamps L.s. 1.00 1.00 0.50 0.50
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR TESTS ON CONCRETE MASONRY UNITS

Project :23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
Propose Use: Masonry Works 4" x 8" x 16" Spec's. Item No.: 1046
Tested By: QAS PERSONNEL April 7, 2022
(Name and Designation) (Date)
Computed By: QAS PERSONNEL April 8, 2022
(Name and Designation) (Date)
=============================================================================================
Lab. No.: CALUBAYAN-CHB4-01
Sample Identification - - - - 1 2 3
1. Width, mm. - - - - - - - - - 100 100 100
2. Length, mm. - - - - - - - 400 400 400
3. Height, mm. - - - - - -- - 200 200 200
4. Gross, cross-sectional area,
sq.mm. 40,000 40,000 40,000
5. Compressive Strength:
Ultimate Load, kN.-- - -- 42,000.00 42,000.00 43,000.00
Compressive Strength,
Mpa 4.670 4.670 4.782
(Average of 3 units) 4.707
6. Moisture Content & Water Absorption :
Sample Mass as Dry Wet Immersed
Identification Sampled (1) g. Mass (2) g. Mass (3) g. Mass (4)g.
A 1486 1416 1563 802
B 1499 1429 1577 809
C 1502 1431 1580 811
Average 1496 1425 1573 807
Computation :
Moisture Content, % - - - - - - (1) - (2)
X 100 = 48
(3) - (2)
Water Absorption, Kg/cu.m. - - (-3) - (2)
X 1000 = 193
(3) - (4)

PREPARED BY: Certified Correct:

KEVIN E. GARCIA ROCKY TOM BERNARD S. ROMASANTA


Engineer II Engineer II

SUBMITTED BY:

MERCEDES G. ASPI
Chief, Quality Assurance Section
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR TESTS ON CONCRETE MASONRY UNITS

Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at


Barangay Masagana, Naujan, Oriental Mindoro
Propose Use: Masonry Works 6" x 8" x 16" Spec's. Item No.: 1046(2)a
Tested By: MQC Personnel April 14, 2022
(Name and Designation) (Date)
Computed By: MQC Personnel April 15, 2022
(Name and Designation) (Date)
=============================================================================================
Lab. No.: CALUBAYAN-CHB6"-01
Sample Identification - - - - 1 2 3
1. Width, mm. - - - - - - - - - 150 150 150
2. Length, mm. - - - - - - - 400 400 400
3. Height, mm. - - - - - -- - 200 200 200
4. Gross, cross-sectional area,
sq.mm. 60,000 60,000 60,000
5. Compressive Strength:
Ultimate Load, kN.-- - -- 65,300.00 65,700.00 65,200.00
Compressive Strength,
Mpa 4.841 4.871 4.833
(Average of 3 units) 4.848
6. Moisture Content & Water Absorption :
Sample Mass as Dry Wet Immersed
Identification Sampled (1) g. Mass (2) g. Mass (3) g. Mass (4)g.
A 1570 1496 1652 848
B 1569 1495 1651 847
C 1588 1513 1671 858
Average 1576 1501 1658 851
Computation :
Moisture Content, % - - - - - - (1) - (2)
X 100 = 47.77
(3) - (2)
Water Absorption, Kg/cu.m. - - (-3) - (2)
X 1000 = 194.55
(3) - (4)

Prepared by: Certified Correct:

KEVIN E. GARCIA ROCKY TOM BERNARD S. ROMASANTA


Engineer II Engineer II

Submitted by:

MERCEDES G. ASPI
Chief, Quality Assurance Section
0.953 1.052 0.54

4.14
MIDR CONSTRUCTION AND SUPPLIES

TRIAL MIX - 900

Date: April 14, 2022


Source: Tigkan River

Cement Factor: 9.50 cu.m./bag

CEMENT 40.00 kgs


WATER 14.99 kgs
FINE AGGREGATES 97.04 kgs
COARSE AGGREGATES 113.05 kgs
TOTAL 265.08 kgs

Weight of Concrete 98.2 kgs

Wt. of Concrete
WEIGHT = (Wt. of Ind. Materials)
Total Wt. of Mat'ls

98.2
CEMENT = 40.00 = 14.82 kgs
265.08

98.2
FA = 97.04 = 35.95 kgs
265.08

98.2
CA = 113.05 = 41.88 kgs
265.08

98.2
WATER = 14.99 = 5.55 kgs
265.08

Summary:
Cement 14.82 kgs
Fine Aggregates 35.95 kgs
Coarse Aggregates 41.88 kgs
Water 5.55 kgs

Prepared by: Certified by:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA


Materials Engineer (Contractor) Engineer II

Noted by:

MERCEDES G. ASPI
Engineer III
Chief, Quality Assurance Section
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 22, 2020

Lab. No.: I.R. - B


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.:
B.3 Project Billboard
B.7 Occupational Safety and Health Officer

INSPECTION REPORT

This is to certify that the materials used in the aboved - mentioned project listed
hereunder were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Safety Shoes
b. Safety Helmet
c. Safety Gloves

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 22, 2020

Lab. No.: I.R. - B.7


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: B.7 Occupational Safety and Health Officer

INSPECTION REPORT

This is to certify that the materials used in the aboved - mentioned project listed
hereunder were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Safety Helmet
b. Safety Gloves
c. Safety Shoes

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 22, 2020


Lab. No.: Cert. - 803(1)a
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 803(1)a Structure Excavation(Common Soil)

CERTIFICATION

This is to certify that the 36.00 cu.m. waste materials for the Item 803(1)a Structure Excavation
for the afformentioned project,was removed and disposed properly ,hence no test is required.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 22, 2020

Lab. No.: I.R.-800


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 800(1) Clearing and Grubbing

INSPECTION REPORT

This is to certify that the equipment used in the aboved - mentioned project listed
hereunder were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 22, 2020

Lab. No.: Cert. - Water


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 900(1), 1046(2) & 1027(1)
Kind of Materials: Water

CERTIFICATION

This is to certify that the water used in mixing concrete in the above

mentioned project were taken from Deep well , and has found to be clean,

odorless and tasteless.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 22, 2020


Lab. No.: I.R.-903(2)
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 903(2) Forms and Falseworks

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Ordinary Plywood
b. Cocolumber
c. Assorted Common Wire Nails

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 22, 2020


Lab. No.: I.R.-1001-1101-1102-1103
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1001(9) Storm and Drainage and Downspout
1100(10) Conduit, Boxes and Fittings
1101(33) Wires and Wiring Devices
1102(1) Panelboard with Main and Branch Breakers
1103(1) Lighting Fixtures and Lamps

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. As per POW

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 22, 2020


Lab. No.: I.R.-902(1)a1
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 902(1)a1 Reinforcing Steel Deformed, Grade 40

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a. 16 mm. dia. RSB
b. 10 mm. dia RSB
c. Tie Wire #16

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

November 4, 2019
Lab. No.: I.R.-1003-1013
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.:
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Pre-Painted Corr. Long Span Metal Roofing Sheet - 0.50mm Thk.
b. Tecksrew
c. Pre-Painted Ridge Roll
d. Pre-Painted Fascia cover
e. Pre-Painted Side Flushing
f. Blind rivet
g. Roof Sealant

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 22, 2020


Lab. No.: I.R.-1001
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1001(9) Storm and Drainage and Downspout

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

November 14, 2017


Lab. No.: I.R.-11
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1018 Ceramic Tiles

INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a. 200x200mm Vitrified Glazed Tiles
b. 200x200mm Vitrified Unglazed Tiles
c. Tile Grout
d. Tile Adhesive

CHECKED BY: CERTIFIED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

January 3, 2018
Lab. No.: I.R.-10
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1010(1) Door Frames

INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used

a. Door frames (Jamb, Sills, Head , Transom)


b PVC Door

CHECKED BY: CERTIFIED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 27, 2017


Lab. No.: I.R.-08
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1032(1)c Metal Painting

INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a Metal Primer Gray
b Paint Thinner
c Paint Brush

CHECKED BY: CERTIFIED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

January 3, 2018
Lab. No.: I.R.-09
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro,
1100(30Oriental Mindoro
Item No.: )a
1101(42 0
)a
1102(27 Wires and Wiring Device
)a Power Load Center, Switch Gear and Panel Boards

INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a. Junction Box w/ Cover a. Flat Pin Outlet a. 4 Branches CB Panelboard
b. Utility Box b. One Way Switch b. Circuit Breaker 40A
c. RSC Pipe 20mm x 3.0 meters c. Single gang plate c. Circuit Breaker 15A
d. PVC Pipe 15mm x 3.0 meters c. Two gang plate d. Circuit Breaker 20A
e RSC Adapter 20mm dia d Electrical tape (3/4" x 20 yds)
f Weatherhead 20mm dia e Ceiling Receptacle (4 1/4)
g Tie Wire #16 f THHN cu. wire # 12
h RSC Clamp(20mm) g THHN cu. wire # 8 (Black)
i PVC Long bend Elbow 15mm h THHN cu. wire # 8 (White)
j PVC Clamp(15mm) i THHN cu. wire # 10
k Elbow 20mm(steel)
l Grounding Rod

CHECKED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

October 27, 2017


Lab. No.: I.R.-06
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1001(8)
1002(28 Sewer Line Works
) Cold Water Lines
1002(8) Plumbing Fixtures
INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used

a. 500mm PVC Pipe a. Floor Drain Plates Stainless


b. 50mm PVC Elbow b. Toilet Bowl w/ fittings(Package)
c. 50mm PVC Tee c. Faucet
d. 50mm PVC Socket/Coupling d. Lavatory
e. P-Trap

a. P.E. Pipe 1/2" dia


b. Angular Bar 3/16"x1/2"
c. G.I. Coupling 1/2" dia
d. G.I. Coupling 1/2" dia x 6"
e. Gate Valve 1/2"
f. Union Patente
g. G.I. Elbow 1/2"
h. G.I. Tee 1/2"
i. Faucet 1/2" dia
j. Teflon Tape

CHECKED BY: CERTIFIED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 22, 2020


Lab. No.: I.R.-1027(1)
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1027(1) Cement Plaster Finish

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

July 22, 2019


Lab. No.: I.R.-1046(2)a2
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1046(2)a2 CHB Non Load Bearing(including Reinforcing Steel) 150mm

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a #16 GI Tie Wire

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

May 27, 2021

Lab. No.: I.R. - B.7


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.:
B.7 Occupational Safety and Health Officer

INSPECTION REPORT

This is to certify that the materials used in the aboved - mentioned project listed
hereunder were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Safety Shoes
b. Safety Helmet
c. Safety Gloves

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

May 27, 2021

Lab. No.: I.R. - B.7


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: B.7 Occupational Safety and Health Officer

INSPECTION REPORT

This is to certify that the materials used in the aboved - mentioned project listed
hereunder were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Safety Helmet
b. Safety Gloves
c. Safety Shoes

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

May 27, 2021


Lab. No.: Cert. - 803(1)a-B
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 803(1)a Structure Excavation(Common Soil)

CERTIFICATION

This is to certify that the 29.80 cu.m. waste materials for the Item 803(1)a Structure Excavation
for the afformentioned project,was removed and disposed properly ,hence no test is required.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

May 27, 2021

Lab. No.: I.R.-800


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 800(1) Clearing and Grubbing

INSPECTION REPORT

This is to certify that the equipment used in the aboved - mentioned project listed
hereunder were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

May 27, 2021

Lab. No.: Cert. - Water


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 900(1), 1046(2) & 1027(1)
Kind of Materials: Water

CERTIFICATION

This is to certify that the water used in mixing concrete in the above

mentioned project were taken from Deep well , and has found to be clean,

odorless and tasteless.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

May 27, 2021


Lab. No.: I.R.-903(2)-B
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 903(2) Forms and Falseworks

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Ordinary Plywood
b. Cocolumber
c. Assorted Common Wire Nails

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

May 27, 2021


Lab. No.: I.R.-1001-1100-1101-1102-1103
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: ### ###
### ###
### ###
### ###
### ###

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. As per POW

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

May 27, 2021


Lab. No.: I.R.-902(1)a1-B
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 902(1)a1 Reinforcing Steel Deformed, Grade 40

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a. 16 mm. dia. RSB
b. 10 mm. dia RSB
c. Tie Wire #16

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

November 4, 2019
Lab. No.: I.R.-1013-1014
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.:
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Pre-Painted Corr. Long Span Metal Roofing Sheet - 0.50mm Thk.
b. Tecksrew
c. Pre-Painted Ridge Roll
d. Pre-Painted Gutter
e. Pre-Painted Side Flushing
f. Blind rivet
g. Roof Sealant

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

May 27, 2021


Lab. No.: I.R.-1001
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1001(9) Storm and Drainage and Downspout

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

November 14, 2017


Lab. No.: I.R.-11
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1018 Ceramic Tiles

INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a. 200x200mm Vitrified Glazed Tiles
b. 200x200mm Vitrified Unglazed Tiles
c. Tile Grout
d. Tile Adhesive

CHECKED BY: CERTIFIED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

January 3, 2018
Lab. No.: I.R.-10
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1010(1) Door Frames

INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used

a. Door frames (Jamb, Sills, Head , Transom)


b PVC Door

CHECKED BY: CERTIFIED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 27, 2017


Lab. No.: I.R.-08
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1032(1)c Metal Painting

INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a Metal Primer Gray
b Paint Thinner
c Paint Brush

CHECKED BY: CERTIFIED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

January 3, 2018
Lab. No.: I.R.-09
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro,
1100(30Oriental Mindoro
Item No.: )a
1101(42 0
)a
1102(27 Wires and Wiring Device
)a Power Load Center, Switch Gear and Panel Boards

INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a. Junction Box w/ Cover a. Flat Pin Outlet a. 4 Branches CB Panelboard
b. Utility Box b. One Way Switch b. Circuit Breaker 40A
c. RSC Pipe 20mm x 3.0 meters c. Single gang plate c. Circuit Breaker 15A
d. PVC Pipe 15mm x 3.0 meters c. Two gang plate d. Circuit Breaker 20A
e RSC Adapter 20mm dia d Electrical tape (3/4" x 20 yds)
f Weatherhead 20mm dia e Ceiling Receptacle (4 1/4)
g Tie Wire #16 f THHN cu. wire # 12
h RSC Clamp(20mm) g THHN cu. wire # 8 (Black)
i PVC Long bend Elbow 15mm h THHN cu. wire # 8 (White)
j PVC Clamp(15mm) i THHN cu. wire # 10
k Elbow 20mm(steel)
l Grounding Rod

CHECKED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

October 27, 2017


Lab. No.: I.R.-06
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1001(8)
1002(28 Sewer Line Works
) Cold Water Lines
1002(8) Plumbing Fixtures
INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used

a. 500mm PVC Pipe a. Floor Drain Plates Stainless


b. 50mm PVC Elbow b. Toilet Bowl w/ fittings(Package)
c. 50mm PVC Tee c. Faucet
d. 50mm PVC Socket/Coupling d. Lavatory
e. P-Trap

a. P.E. Pipe 1/2" dia


b. Angular Bar 3/16"x1/2"
c. G.I. Coupling 1/2" dia
d. G.I. Coupling 1/2" dia x 6"
e. Gate Valve 1/2"
f. Union Patente
g. G.I. Elbow 1/2"
h. G.I. Tee 1/2"
i. Faucet 1/2" dia
j. Teflon Tape

CHECKED BY: CERTIFIED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

May 27, 2021


Lab. No.: I.R.-1032
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1032(1)a Painting Works, Masonry/Concrete
1032(1)c Painting Works, Steel

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

May 27, 2021


Lab. No.: I.R.-1027
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1027(1) Cement Plaster Finish

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

March 28, 2022

Lab. No.: I.R. - B


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.:
B.3 Permits and Clearances
B.5 Project Billboard

INSPECTION REPORT

This is to certify that the materials used in the aboved - mentioned project listed
hereunder were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Safety Shoes
b. Safety Helmet
c. Safety Gloves

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

March 28, 2022

Lab. No.: I.R. - B.7


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: B.7 Occupational Safety and Health Officer

INSPECTION REPORT

This is to certify that the materials used in the aboved - mentioned project listed
hereunder were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Safety Helmet
b. Safety Gloves
c. Safety Shoes

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

March 28, 2022


Lab. No.: Cert. - 803(1)a
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 803(1)a Structure Excavation(Common Soil)

CERTIFICATION

This is to certify that the 84.58 cu.m. waste materials for the Item 803(1)a Structure Excavation
for the afformentioned project,was removed and disposed properly ,hence no test is required.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

March 28, 2022

Lab. No.: I.R.-800


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 800(1) Clearing and Grubbing

INSPECTION REPORT

This is to certify that the equipment used in the aboved - mentioned project listed
hereunder were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

March 28, 2022

Lab. No.: Cert. - Water


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 900(1), 1046(2) & 1027(1)
Kind of Materials: Water

CERTIFICATION

This is to certify that the water used in mixing concrete in the above

mentioned project were taken from Deep well , and has found to be clean,

odorless and tasteless.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

March 28, 2022


Lab. No.: I.R.-903(2)
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 903(2) Forms and Falseworks

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Ordinary Plywood
b. Cocolumber
c. Assorted Common Wire Nails

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

March 28, 2022


Lab. No.: I.R.-1047
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1047(3)a Metal Structure Accessories, Bolts
1047(6) Metal Structure Accessories, Steel Plates

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. As per POW

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

March 28, 2022


Lab. No.: I.R.-902(1)a1
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 902(1)a1 Reinforcing Steel Deformed, Grade 40

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
c. Tie Wire #16

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

November 4, 2019
Lab. No.: I.R.-1003-1013
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.:
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###
#NAME? ###

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Pre-Painted Corr. Long Span Metal Roofing Sheet - 0.50mm Thk.
b. Tecksrew
c. Pre-Painted Ridge Roll
d. Pre-Painted Fascia cover
e. Pre-Painted Side Flushing
f. Blind rivet
g. Roof Sealant

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

March 28, 2022


Lab. No.: I.R.-1001
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1001(9) Storm and Drainage and Downspout

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

November 14, 2017


Lab. No.: I.R.-11
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1018 Ceramic Tiles

INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a. 200x200mm Vitrified Glazed Tiles
b. 200x200mm Vitrified Unglazed Tiles
c. Tile Grout
d. Tile Adhesive

CHECKED BY: CERTIFIED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

January 3, 2018
Lab. No.: I.R.-10
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1010(1) Door Frames

INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used

a. Door frames (Jamb, Sills, Head , Transom)


b PVC Door

CHECKED BY: CERTIFIED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

December 27, 2017


Lab. No.: I.R.-08
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1032(1)c Metal Painting

INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a Metal Primer Gray
b Paint Thinner
c Paint Brush

CHECKED BY: CERTIFIED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

January 3, 2018
Lab. No.: I.R.-09
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro,
1100(30Oriental Mindoro
Item No.: )a
1101(42 0
)a
1102(27 Wires and Wiring Device
)a Power Load Center, Switch Gear and Panel Boards

INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a. Junction Box w/ Cover a. Flat Pin Outlet a. 4 Branches CB Panelboard
b. Utility Box b. One Way Switch b. Circuit Breaker 40A
c. RSC Pipe 20mm x 3.0 meters c. Single gang plate c. Circuit Breaker 15A
d. PVC Pipe 15mm x 3.0 meters c. Two gang plate d. Circuit Breaker 20A
e RSC Adapter 20mm dia d Electrical tape (3/4" x 20 yds)
f Weatherhead 20mm dia e Ceiling Receptacle (4 1/4)
g Tie Wire #16 f THHN cu. wire # 12
h RSC Clamp(20mm) g THHN cu. wire # 8 (Black)
i PVC Long bend Elbow 15mm h THHN cu. wire # 8 (White)
j PVC Clamp(15mm) i THHN cu. wire # 10
k Elbow 20mm(steel)
l Grounding Rod

CHECKED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

October 27, 2017


Lab. No.: I.R.-06
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1001(8)
1002(28 Sewer Line Works
) Cold Water Lines
1002(8) Plumbing Fixtures
INSPECTION REPORT

This is to certify that all the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used

a. 500mm PVC Pipe a. Floor Drain Plates Stainless


b. 50mm PVC Elbow b. Toilet Bowl w/ fittings(Package)
c. 50mm PVC Tee c. Faucet
d. 50mm PVC Socket/Coupling d. Lavatory
e. P-Trap

a. P.E. Pipe 1/2" dia


b. Angular Bar 3/16"x1/2"
c. G.I. Coupling 1/2" dia
d. G.I. Coupling 1/2" dia x 6"
e. Gate Valve 1/2"
f. Union Patente
g. G.I. Elbow 1/2"
h. G.I. Tee 1/2"
i. Faucet 1/2" dia
j. Teflon Tape

CHECKED BY: CERTIFIED BY:

Rocky Tom S. Romasanta MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

March 28, 2022


Lab. No.: I.R.-1000
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1000(1) Soil Poisoning

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

March 28, 2022


Lab. No.: I.R.-1046
Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
Location: Socorro, Oriental Mindoro
Item No.: 1046(2)a1 100mm CHB Non Load Bearing Wall
1046(2)a2 150mm CHB Non Load Bearing Wall

INSPECTION REPORT

This is to certify that all the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used
a. Tie wire

CHECKED BY: CERTIFIED BY:

ROCKY TOM BERNARD S.


ROMASANTA MARK LESTER B. CABRAL
Materials Engineer Project Engineer
FRAMECON BUILDERS

WORKSHEET FOR PLASTIC AND LIQUID LIMIT TESTS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan,
Project: Oriental Mindoro
Location: Socorro, Oriental Mindoro
Contractor: MIDR CONSTRUCTION AND SUPPLIES
Kind of Material : Embankment Spec's Item No. : 804(1)a
Sampled at : Jobsite
Original Source : Tigkan River
Sampled By : Contractor's Tech. Contractor 4/7/2022
Tested By : Contractor's Tech. Contractor 4/7/2022
Computed By : Contractor's Tech. Contractor 4/7/2022
==================================================================
Lab. No. CALUBAYAN-LLPL-804(1)a-01
LIQUID LIMIT PLASTIC LIMIT

Determination Number 1 2 3 4 1 2
Container Number A B C D E F
Container & Wet Soil, g 36.40 36.60 37.05 37.25 27.18 27.15
Container & Dry Soil, g 34.5 34.57 34.59 34.66 26.59 26.57
Moisture Loss, g 1.90 2.03 2.46 2.59 0.59 0.58
Container, g 27.50 27.50 27.50 27.50 23.40 23.50
Dry Soil, g 7.00 7.07 7.09 7.16 3.19 3.07
Moisture Content (%) 27 29 35 36 18 19
Number of Blows 34 29 12 10 19

FLOW CURVE

37 SIEVE ANALYSIS
36
35
Sieve Size % Passing
34
No. 10 31
M 33
No. 40 19
C 32
No. 200 5
% 31
30 Liquid Limit 29.5
29 Plastic Limit 19
28 Plasticity Index 11
27 Group Index -5
26 Group Class A-2-6
6 10 15 20 25 30 35 ###Remarks: SILTY OR CLAYEY
Number of Blows SAND AND GRAVEL

Prepared / Tested By: Computed / Certified Correct: Noted By:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer ( Contractor ) Material Engineer (DPWH-MODEO) Chief, Quality Assurance Section
FRAMECON
WORKSHEET BUILDERS
FOR PLASTIC AND LIQUID LIMIT TESTS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan,
Project: Oriental Mindoro
Location: Socorro, Oriental Mindoro
Contractor: MIDR CONSTRUCTION AND SUPPLIES
Kind of Material : Subgrade Preparation Spec's Item No. : 105(1)a
Sampled at : Jobsite
Original Source : Pula River
Sampled By : Contractor's Tech. Contractor 4/7/2022
Tested By : Contractor's Tech. Contractor 4/8/2022
Computed By : Contractor's Tech. Contractor 4/8/2022
==================================================================

Lab. No. CSC-LLPL-200-01

LIQUID LIMIT PLASTIC LIMIT

Determination Number 1 2 3 4 1 2
Container Number A B C D E F
Container & Wet Soil, g 35.25 34.21 31.39 34.88 36.56 40.52
Container & Dry Soil, g 34.18 32.84 30.05 33.05 35.02 39.17
Moisture Loss, g 1.07 1.37 1.34 1.83 1.54 1.35
Container, g 30.00 28.00 26.00 28.00 27.00 32.00
Dry Soil, g 4.18 4.84 4.05 5.05 8.02 7.17
Moisture Content (%) 26 28 33 36 19 19
Number of Blows 33 27 16 10 19

FLOW CURVE

37 SIEVE ANALYSIS
36
35
Sieve Size % Passing
34
No. 10 32
M 33
No. 40 16
C 32
No. 200 7
% 31
30 Liquid Limit 28.6
29 Plastic Limit 19
28 Plasticity Index 10
27 Group Index -5
26 Group Class A-2-4
6 10 15 20 25 30 35 ###Remarks: SILTY OR CLAYEY
Number of Blows SAND & GRAVEL

Prepared / Tested By: Computed / Certified Correct:

RICHARD MAULION ROCKY S. ROMASANTA


Materials Engineer ( Contractor ) Material Engineer (DPWH-MODEO)

Noted By:
FRAMECON BUILDERS
MERCEDES G. ASPI
FRAMECON
Chief, Quality Assurance BUILDERS
Section
FRAMECON BUILDERS
WORKSHEET FOR PLASTIC AND LIQUID LIMIT TESTS

Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Location: Pto Galera, Oriental Mindoro
Contractor: MIDR CONSTRUCTION AND SUPPLIES
Kind of Material : Aggregate Sub Base Course Spec's Item No. : 200
Sampled at : Jobsite
Original Source : Pula River
Sampled By : Contractor's Tech. Contractor 4/7/2022
Tested By : Contractor's Tech. Contractor 4/8/2022
Computed By : Contractor's Tech. Contractor 4/8/2022
==================================================================

Lab. No. CSC-LLPL-200-02

LIQUID LIMIT PLASTIC LIMIT

Determination Number 1 2 3 4 1 2
Container Number A B C D E F
Container & Wet Soil, g 35.25 34.21 31.39 34.88 36.56 40.52
Container & Dry Soil, g 34.14 32.81 30.02 33.01 34.98 39.07
Moisture Loss, g 1.11 1.40 1.37 1.87 1.58 1.45
Container, g 30.00 28.00 26.00 28.00 27.00 32.00
Dry Soil, g 4.14 4.81 4.02 5.01 7.98 7.07
Moisture Content (%) 27 29 34 37 20 21
Number of Blows 34 28 17 12 21

FLOW CURVE

37 SIEVE ANALYSIS
36
35
Sieve Size % Passing
34
No. 10 31
M 33
No. 40 15
C 32
No. 200 8
% 31
30 Liquid Limit 30
29 Plastic Limit 21
28 Plasticity Index 9
27 Group Index -4
26 Group Class A-2-4
6 10 15 20 25 30 35 ###Remarks: SILTY OR CLAYEY
Number of Blows SAND & GRAVEL

Prepared / Tested By: Computed / Certified Correct:

RICHARD MAULION ROCKY S. ROMASANTA


Materials Engineer ( Contractor ) Material Engineer (DPWH-MODEO)
FRAMECON BUILDERS
Noted By:

MERCEDES G. ASPI
Chief, Quality Assurance Section
FRAMECON BUILDERS
WORKSHEET FOR PLASTIC AND LIQUID LIMIT TESTS

Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Location: Pto Galera, Oriental Mindoro
Contractor: MIDR CONSTRUCTION AND SUPPLIES
Kind of Material : Aggregate Sub Base Course Spec's Item No. : 200
Sampled at : Jobsite
Original Source : Pula River
Sampled By : Contractor's Tech. Contractor 4/7/2022
Tested By : Contractor's Tech. Contractor 4/8/2022
Computed By : Contractor's Tech. Contractor 4/8/2022
==================================================================

Lab. No. CSC-LLPL-105-01

LIQUID LIMIT PLASTIC LIMIT

Determination Number 1 2 3 4 1 2
Container Number A B C D E F
Container & Wet Soil, g 35.30 34.21 31.34 34.83 36.56 40.52
Container & Dry Soil, g 34.16 32.8 30.02 33.05 34.98 39.07
Moisture Loss, g 1.14 1.41 1.32 1.78 1.58 1.45
Container, g 30.00 28.00 26.00 28.00 27.00 32.00
Dry Soil, g 4.16 4.8 4.02 5.05 7.98 7.07
Moisture Content (%) 27 29 33 35 20 21
Number of Blows 35 26 15 12 21

FLOW CURVE

37 SIEVE ANALYSIS
36
35
Sieve Size % Passing
34
No. 10 32
M 33
No. 40 16
C 32
No. 200 7
% 31
30 Liquid Limit 29.5
29 Plastic Limit 21
28 Plasticity Index 9
27 Group Index -5
26 Group Class A-2-4
6 10 15 20 25 30 35 ###Remarks: SILTY OR CLAYEY
Number of Blows SAND & GRAVEL

Prepared / Tested By: Computed / Certified Correct:

RICHARD MAULION ROCKY S. ROMASANTA


Materials Engineer ( Contractor ) Material Engineer (DPWH-MODEO)
FRAMECON BUILDERS
Noted By:

MERCEDES G. ASPI
Chief, Quality Assurance Section
FRAMECON
WORKSHEET BUILDERS
FOR PLASTIC AND LIQUID LIMIT TESTS

Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Location: Pto Galera, Oriental Mindoro
Contractor: MIDR CONSTRUCTION AND SUPPLIES
Kind of Material : Aggregate Sub Base Course Spec's Item No. : 200
Sampled at : Jobsite
Original Source : Tigkan River
Sampled By : Contractor's Tech. Contractor 4/7/2022
Tested By : Contractor's Tech. Contractor 4/8/2022
Computed By : Contractor's Tech. Contractor 4/8/2022
==================================================================

Lab. No. CSI-LLPL-200-05

LIQUID LIMIT PLASTIC LIMIT

Determination Number 1 2 3 4 1 2
Container Number A B C D E F
Container & Wet Soil, g 35.27 34.21 31.33 34.84 36.56 40.52
Container & Dry Soil, g 34.16 32.8 30.02 33.05 34.98 39.07
Moisture Loss, g 1.11 1.41 1.31 1.79 1.58 1.45
Container, g 30.00 28.00 26.00 28.00 27.00 32.00
Dry Soil, g 4.16 4.8 4.02 5.05 7.98 7.07
Moisture Content (%) 27 29 33 35 20 21
Number of Blows 34 26 15 11 21

FLOW CURVE

37 SIEVE ANALYSIS

36

35
Sieve Size % Passing
34
No. 10 30
M 33
No. 40 14
C 32
No. 200 8
% 31

30 Liquid Limit 29.5

29 Plastic Limit 21

28 Plasticity Index 9

27 Group Index -4

26 Group Class A-2-4


6 10 FRAMECON
15 20 25 BUILDERS
30 35 ###Remarks: SILTY OR CLAYEY
Number of Blows SAND & GRAVEL

Prepared / Tested By: Computed / Certified Correct:

RICHARD MAULION ROCKY S. ROMASANTA


Materials Engineer ( Contractor ) Material Engineer (DPWH-MODEO)

Noted By:

MERCEDES G. ASPI
Chief, Quality Assurance Section
FRAMECON BUILDERS
WORKSHEET FOR PLASTIC AND LIQUID LIMIT TESTS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana, Naujan,
Project: Oriental Mindoro
Location: Socorro, Oriental Mindoro
Contractor: MIDR CONSTRUCTION AND SUPPLIES
Kind of Material : Embankment Spec's Item No. : 804(1)b
Sampled at : Jobsite
Original Source : Tigkan River
Sampled By : Contractor's Tech. Contractor 4/7/2022
Tested By : Contractor's Tech. Contractor 4/7/2022
Computed By : Contractor's Tech. Contractor 4/7/2022
==================================================================
Lab. No. CALUBAYAN-LLPL-804(1)b-01
LIQUID LIMIT PLASTIC LIMIT

Determination Number 1 2 3 4 1 2
Container Number A B C D E F
Container & Wet Soil, g 35.32 31.43 34.22 34.92 36.60 40.50
Container & Dry Soil, g 34.22 30.16 32.86 33.09 35 39.17
Moisture Loss, g 1.10 1.27 1.36 1.83 1.6 1.33
Container, g 30.00 25.50 28.70 28.00 27.00 32.00
Dry Soil, g 4.22 4.66 4.16 5.09 8 7.17
Moisture Content (%) 26 27 33 36 20 19
Number of Blows 32 27 15 10 20

FLOW CURVE

37 SIEVE ANALYSIS
36
35
Sieve Size % Passing
34
No. 10 32
M 33
No. 40 10
C 32
No. 200 3
% 31
30 Liquid Limit 28.4
29 Plastic Limit 20
28 Plasticity Index 8
27 Group Index -5
26 Group Class A-2-4
6 10 15 20 25 30 35 ###Remarks: SILTY OR CLAYEY
Number of Blows

Prepared / Tested By: Computed / Certified Correct: Noted By:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer ( Contractor ) Material Engineer (DPWH-MODEO) Chief, Quality Assurance Section
FRAMECON BUILDERS

-30
-10
-10.5
1
200-35
200-15
LL-40
PI - 10
FRAMECON BUILDERS

-28
-8
-11.4
0
200-35
200-15
LL-40
PI - 10
FRAMECON BUILDERS

-27
-7
-10
-1
200-35
200-15
LL-40
PI - 10
FRAMECON BUILDERS

-28
-8
-10.5
-1
200-35
200-15
LL-40
PI - 10
FRAMECON BUILDERS

-27

-7

-10.5

-1

200-35

200-15

LL-40

PI - 10
FRAMECON BUILDERS

-32
-12
-11.6
-2
200-35
200-15
LL-40
PI - 10
CMSEL CONSTRUCTION and DEVELOPER

WORKSHEET FOR LIQUID AND PLASTIC LIMIT TEST


Project :
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Granular Materials Spec's Item, No.
804(1)a
Sample at: Jobsite
Original Source: #REF!
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: MARK IAN M. DELOS REYES Contractor April 8, 2022
(Name and Designation) (Office) (Date)
Computed by: MARK IAN M. DELOS REYES Contractor April 8, 2022
(Name and Designation) (Office) (Date)
=====================================================================

LAB. NUMBER: 2CL-BES-P-804(1)a-01

DETERMINATION NUMBER LIQUID LIMIT PLASTIC LIMIT


TRIAL NUMBER 1 2 3 4 1 2
Container Number A B D F H J
Container & Wet Soil 36.32 36.01 36.49 36.69 27.1 27.16
Container & Dry Soil 34.52 34.25 34.55 34.57 26.40 26.50
Moisture Loss, g. 1.80 1.76 1.97 2.12 0.69 0.66
Container, g. 27.00 27.50 27.50 27.50 23.10 23.50
Dry Soil, g. 7.52 6.75 7.05 7.07 3.30 3.00
Moisture Content, % 24 26 28 30 21 22
Number of Blows 40 23 11 7
SIEVE ANALYSIS
M
35 FLOW CURVE
O SIEVE SIZE PERCENT (%)
I 30 PASSING
S No. 10 31
25
T No. 40 19
U 20 No. 200 5
R
15
E LIQUID LIMIT = 25.15
10 PLASTIC LIMIT= 21.50
% 5
PLASTICITY INDEX= 3.65
GROUP INDEX=
0 GROUP
1 10 100
CLASSIFICATION= A-1-a

===================================================
RECOMMENDATIONS:
Granular Materials

PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM S. ROMASANTA ALBIEN M. MAHIA


CMSEL CONSTRUCTION and DEVELOPER

Materials Engineer Engineer II Engineer III


WORKSHEET FOR LIQUID AND PLASTIC LIMIT TEST
Project :
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
Kind of Materials: Granular Materials Spec's Item, No.
804(1)b
Sample at: Jobsite
Original Source: #REF!
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: Contractors Tech. Contractor April 8, 2022
(Name and Designation) (Office) (Date)
Computed by: Contractors Tech. Contractor April 8, 2022
(Name and Designation) (Office) (Date)
=====================================================================

LAB. NUMBER: 2CL-CES-II-804(1)b-01

DETERMINATION NUMBER LIQUID LIMIT PLASTIC LIMIT


TRIAL NUMBER 1 2 3 4 1 2
Container Number
Container & Wet Soil
Container & Dry Soil NON PLASTIC NON PLASTIC
Moisture Loss, g.
Container, g.
Dry Soil, g.
Moisture Content, %
Number of Blows
SIEVE ANALYSIS
M 31 24
O SIEVE SIZE PERCENT (%)
30
I PASSING
S 29 No. 10 32
T No. 40 10
28
U No. 200 3
R 27
E 26
LIQUID LIMIT = NP
PLASTIC LIMIT= NP
% 25 PLASTICITY INDEX= NP
24 GROUP INDEX= NP
1 10 100 GROUP
CLASSIFICATION= A-1-a

===================================================
RECOMMENDATIONS:
SAND AND GRAVEL - NON PLASTIC

PREPARED BY: CHECKED BY: SUBMITTED BY:


CMSEL CONSTRUCTION and DEVELOPER

MARK IAN M. DELOS REYES ROCKY TOM S. ROMASANTA ALBIEN M. MAHIA


Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS
WORKSHEET FOR TEST OF MOISTURE DENSITY
RELATIONS OF SOILS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project Naujan, Oriental Mindoro
:
(Name) (Town /City/ Province)
Kind of Materials: Backfill Materials Spec's Item, No. 804(1)a
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: MARK IAN M. DELOS REYES Contractor April 8, 2022
(Name and Designation) (Office) (Date)
Computed by: MARK IAN M. DELOS REYES Contractor April 8, 2022
(Name and Designation) (Office) (Date)
=====================================================================

LAB. NUMBER: CALUBAYAN-C-804(1)a-01

TRIAL NUMBER 1 2 3 4 5 6
Water Added in Q.C. 410 630 850 1070 1070
Mold + Wet Soil (kg.) 10.78 11.02 11.22 11.18 11.07
M O L D (kg.) 6.25 6.25 6.25 6.25 6.25
Wet Soil (kg.) 4.53 4.77 4.97 4.93 4.82
Wet Density, kg/cu.m. 2133 2246 2340 2321 2269
Can Number A-2 A-3 A-4 A-5 A-6
Can + Wet Soil, (grams) 188.47 180.87 187.76 187.37 185.27
Can + Dry Soil, (grams) 180.46 170.61 173.21 168.56 165.36
WATER 8.01 10.26 14.55 18.81 19.91
C A N (grams) 11.10 11.10 11.00 11.00 11.10
Dry Soil (grams) 169.36 159.51 162.21 157.56 154.26
Moisture Content, % 4.73 6.43 8.97 11.94 12.91
Dry Density, kg/cu.m. 2037 2110 2147 2073 2010
=========================================================================================================

D
Compaction Method Used:
Weight of rammer:(kg.)
T - 180 - D
4.50 kgs.
R 2200 Volume of Mold:(cu.m) 0.002124
Y Number of Blows layers: 56 / 5
2150 Max Dry Density, kg./cu.m.: 2150
Dry Density, kg/cu.m.

D Optimum Moisture Content: 9


E 2100
N PREPARED BY:
S
2050
I MARK IAN M. DELOS REYES
T Materials Engineer
Y 2000
CHECKED BY:
1950
ROCKY TOM BERNARD S. ROMASANTA
Engineer II
1900
4 5 6 7 8 9 10 11 12 13 14
SUBMITTED BY:
Moisture Content, %
MERCEDES G. ASPI
Engineer III
FRAMECON BUILDERS
WORKSHEET FOR TEST OF MOISTURE DENSITY
RELATIONS OF SOILS

23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project Naujan, Oriental Mindoro
:
(Name) (Town /City/ Province)
Kind of Materials: Backfill Materials Spec's Item, No. 804(1)b
Sample at: Jobsite
Original Source: Tigkan River
Sampled by: Contractors Tech. Contractor April 7, 2022
(Name and Designation) (Office) (Date)
Tested by: MARK IAN M. DELOS REYES Contractor April 8, 2022
(Name and Designation) (Office) (Date)
Computed by: MARK IAN M. DELOS REYES Contractor April 8, 2022
(Name and Designation) (Office) (Date)
=====================================================================

LAB. NUMBER: CALUBAYAN-C-804(1)b-01

TRIAL NUMBER 1 2 3 4 5 6
Water Added in Q.C. 410 630 850 1070 1070
Mold + Wet Soil (kg.) 10.72 11.00 11.22 11.16 11.07
M O L D (kg.) 6.25 6.25 6.25 6.25 6.25
Wet Soil (kg.) 4.47 4.75 4.97 4.91 4.82
Wet Density, kg/cu.m. 2105 2236 2340 2312 2269
Can Number A-2 A-3 A-4 A-5 A-6
Can + Wet Soil, (grams) 188.53 180.90 187.96 187.43 185.32
Can + Dry Soil, (grams) 180.47 170.62 173.36 168.58 165.43
WATER 8.06 10.28 14.60 18.85 19.89
C A N (grams) 11.10 11.10 11.00 11.00 11.10
Dry Soil (grams) 169.37 159.52 162.36 157.58 154.33
Moisture Content, % 4.76 6.44 8.99 11.96 12.89
Dry Density, kg/cu.m. 2009 2101 2147 2065 2010
=========================================================================================================

D
Compaction Method Used:
Weight of rammer:(kg.)
T - 180 - D
4.50 kgs.
R 2200 Volume of Mold:(cu.m) 0.002124
Y Number of Blows layers: 56 / 5
2150 Max Dry Density, kg./cu.m.: 2150
Dry Density, kg/cu.m.

D Optimum Moisture Content: 9


E 2100
N PREPARED BY:
S
2050
I MARK IAN M. DELOS REYES
T Materials Engineer
Y 2000
CHECKED BY:
1950
ROCKY TOM BERNARD S. ROMASANTA
Engineer II
1900
4 5 6 7 8 9 10 11 12 13 14
SUBMITTED BY:
Moisture Content, %
MERCEDES G. ASPI
Engineer III
FRAMECON BUILDERS

WORKSHEET FOR FIELD DENSITY TEST


PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
KIND OF MATERIALS: Granular Materials
TEST HOLE: DEPTH: 0.20M. LOCATION :
(Location & Reference to Center Line)
REPRESENTING: Backfilling of Materials
(Layer No.) (Depth) (Station to Station) (Width)
TESTED BY: Contractor's Tech Contractor May 27, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor's Tech Contractor May 27, 2022
(Name and Designation) (Office) (Date)
=====================================================
LAB. NUMBER: CALUBAYAN-D-804(1)a-01

UNIT WEIGHT OF AIR-DRY SAND MASS OF SAND TO FILL FUNNEL


1. Container Full of Water, kg. 7.75 8. Mass of Jar + Sand, kg. 10.55
2. Container, kg. 2.6 9. Mass of Jar + Sand, kg. 8.90
3. Water, kg. (1) - (2) 5.150 10. Sand in Funnel, kg. (8) - (9) 1.65
4. Container, m3 (3)/ 1000 0.00515
5. Container filled with air
dry sand, kg. 10.63
6. Air-dry sand, kg. (5) - (2) 8.03
7. Unit weight of dry sand,
kg. /m3 (6- / (4) 1559.22
1 2
ACTUAL MOISTURE CONTENT
11. Container + Wet soil, g. 166.30 167.30 166.50 166.85
12. Container + Dry soil, g. 155.40 155.60 151.50 151.70
13. Moisture, g. (11) - (12) 10.90 11.70 15.00 15.15
14. Container, g. 15.25 15.25 15.25 15.25
15. Dry Soil, g. (12) - (14) 140.15 140.35 136.25 136.45
16. Actual Moisture Content (13)/(15)x100 7.78 8.34 11.01 11.10
17. Average actual moisture
Content, % 8.06 11.06
FIELD DENSITY TEST
18. Total matl. taken from hole, kg. 5.55 5.57
19. Mass of jar - Sand, kg. 10.010 10.010
20. Mass of jar+Sand,kg.(after pouring) 4.55 4.54
21. Sand to fill hole, kg. (19) - (20) - 10) 3.810 3.820
22. Volume of hole, m3 (21) / (7) 0.002444 0.002450
23. Wet unit weight, kg. / m3 (18) / (22) 2270.87 2273.47
24. Dry Unit Weight,kg.M3(23)/(1+(17)/100) 2101.49 2047.06
25. Laboratory Compaction test data:
a) Maximum dry density, kg. /m3 2150 2150
b) Optimum Moisture Content 9.00 9.00
26.Degree of Compaction(24)/(25 a)x100 98% 95%
REMARKS / RECOMMENDATION:
Passed.

PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS

WORKSHEET FOR FIELD DENSITY TEST


PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
KIND OF MATERIALS: Granular Materials
TEST HOLE: DEPTH: 0.20M. LOCATION :
(Location & Reference to Center Line)
REPRESENTING: Backfilling of Materials
(Layer No.) (Depth) (Station to Station) (Width)
TESTED BY: Contractor's Tech Contractor June 15, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor's Tech Contractor June 15, 2022
(Name and Designation) (Office) (Date)
=====================================================
LAB. NUMBER: CALUBAYAN-D-804(1)b-01

UNIT WEIGHT OF AIR-DRY SAND MASS OF SAND TO FILL FUNNEL


1. Container Full of Water, kg. 7.75 8. Mass of Jar + Sand, kg. 10.55
2. Container, kg. 2.6 9. Mass of Jar + Sand, kg. 8.90
3. Water, kg. (1) - (2) 5.240 10. Sand in Funnel, kg. (8) - (9) 1.65
4. Container, m3 (3)/ 1000 0.00524
5. Container filled with air
dry sand, kg. 10.63
6. Air-dry sand, kg. (5) - (2) 8.03
7. Unit weight of dry sand,
kg. /m3 (6- / (4) 1532.44
1 2 3
ACTUAL MOISTURE CONTENT
11. Container + Wet soil, g. 163.40 163.80 163.60 163.95 163.80 164.15
12. Container + Dry soil, g. 152.70 152.90 151.50 151.70 151.80 152.00
13. Moisture, g. (11) - (12) 10.70 10.90 12.10 12.25 12.00 12.15
14. Container, g. 15.25 15.25 15.25 15.25 15.25 15.25
15. Dry Soil, g. (12) - (14) 137.45 137.65 136.25 136.45 136.55 136.75
16. Actual Moisture Content (13)/(15)x100 7.78 7.92 8.88 8.98 8.79 8.88
17. Average actual moisture
Content, % 7.85 8.93 8.84
FIELD DENSITY TEST
18. Total matl. taken from hole, kg. 5.91 5.93 5.95
19. Mass of jar - Sand, kg. 10.000 10.010 10.010
20. Mass of jar+Sand,kg.(after pouring) 4.43 4.42 4.41
21. Sand to fill hole, kg. (19) - (20) - 10) 3.920 3.940 3.950
22. Volume of hole, m3 (21) / (7) 0.002558 0.002571 0.002533
23. Wet unit weight, kg. / m3 (18) / (22) 2310.40 2306.50 2348.99
24. Dry Unit Weight,kg.M3(23)/(1+(17)/100) 2142.23 2117.41 2158.20
25. Laboratory Compaction test data:
a) Maximum dry density, kg. /m3 2150 2150 2150
b) Optimum Moisture Content 9.00 9.00 9.00
26.Degree of Compaction(24)/(25 a)x100 100% 98% 100%
REMARKS / RECOMMENDATION:
Passed.

PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS

WORKSHEET FOR FIELD DENSITY TEST


PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
(Name) (Town /City/ Province)
KIND OF MATERIALS: Granular Materials
TEST HOLE: DEPTH: 0.20M. LOCATION :
(Location & Reference to Center Line)
REPRESENTING: Backfilling of Materials
(Layer No.) (Depth) (Station to Station) (Width)
TESTED BY: Contractor's Tech Contractor June 18, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor's Tech Contractor June 18, 2022
(Name and Designation) (Office) (Date)
=====================================================
LAB. NUMBER: CALUBAYAN-D-804(1)b-02

UNIT WEIGHT OF AIR-DRY SAND MASS OF SAND TO FILL FUNNEL


1. Container Full of Water, kg. 7.75 8. Mass of Jar + Sand, kg. 10.55
2. Container, kg. 2.6 9. Mass of Jar + Sand, kg. 8.90
3. Water, kg. (1) - (2) 5.240 10. Sand in Funnel, kg. (8) - (9) 1.65
4. Container, m3 (3)/ 1000 0.00524
5. Container filled with air
dry sand, kg. 10.63
6. Air-dry sand, kg. (5) - (2) 8.03
7. Unit weight of dry sand,
kg. /m3 (6- / (4) 1532.44
4
ACTUAL MOISTURE CONTENT
11. Container + Wet soil, g. 163.40 163.80
12. Container + Dry soil, g. 151.50 151.70
13. Moisture, g. (11) - (12) 11.90 12.10
14. Container, g. 15.25 15.25
15. Dry Soil, g. (12) - (14) 136.25 136.45
16. Actual Moisture Content (13)/(15)x100 8.73 8.87
17. Average actual moisture
Content, % 8.80
FIELD DENSITY TEST
18. Total matl. taken from hole, kg. 6.00
19. Mass of jar - Sand, kg. 10.000
20. Mass of jar+Sand,kg.(after pouring) 4.43
21. Sand to fill hole, kg. (19) - (20) - 10) 3.920
22. Volume of hole, m3 (21) / (7) 0.002558
23. Wet unit weight, kg. / m3 (18) / (22) 2345.58
24. Dry Unit Weight,kg.M3(23)/(1+(17)/100) 2155.86
25. Laboratory Compaction test data:
a) Maximum dry density, kg. /m3 2150
b) Optimum Moisture Content 9.00
26.Degree of Compaction(24)/(25 a)x100 100%
REMARKS / RECOMMENDATION:
Passed.

PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
FRAMECON BUILDERS

1-Aug
21-Oct
FRAMECON BUILDERS

1-Aug
21-Oct
FRAMECON BUILDERS

1-Aug
21-Oct
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: December 30, 1899

Pouring Permit Report


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Contractor : MIDR CONSTRUCTION AND SUPPLIES
Part of Structure Estimated Volume : - cu.m.
to be Poured : 0
Station Limits/Section: -
Time of Pouring : 8:00 - 5:00
Date of Pouring : December 30, 1899

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

ROCKY TOM BERNARD S. ROMASANTA ALBIEN M. MAHIA December 30, 1899


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

Project Inspector : Date


REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: April 24, 2023

Pouring Permit Report


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Contractor : MIDR CONSTRUCTION AND SUPPLIES
Part of Structure Estimated Volume : 6.30 cu.m.
to be Poured : Tie Beam
Station Limits/Section: -
Time of Pouring : 8:00 - 5:00
Date of Pouring : April 24, 2023

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

ROCKY TOM BERNARD S. ROMASANTA ALBIEN M. MAHIA April 24, 2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

Project Inspector : Date


REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: December 30, 1899

Pouring Permit Report


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Contractor : MIDR CONSTRUCTION AND SUPPLIES
Part of Structure Estimated Volume : 13.63 cu.m.
to be Poured : Column
Station Limits/Section: -
Time of Pouring : 8:00 - 5:00
Date of Pouring : May 1, 2023

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

ROCKY TOM BERNARD S. ROMASANTA ALBIEN M. MAHIA May 1, 2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

Project Inspector : Date


REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: May 1, 2023

Pouring Permit Report


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Contractor : MIDR CONSTRUCTION AND SUPPLIES
Part of Structure Estimated Volume : - cu.m.
to be Poured : Column
Station Limits/Section: -
Time of Pouring : 8:00 - 5:00
Date of Pouring : December 30, 1899

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

ROCKY TOM BERNARD S. ROMASANTA ALBIEN M. MAHIA December 30, 1899


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

Project Inspector : Date


REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: May 1, 2023

Pouring Permit Report


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Contractor : MIDR CONSTRUCTION AND SUPPLIES
Part of Structure Estimated Volume : 23.07 cu.m.
to be Poured : SOF
Station Limits/Section: -
Time of Pouring : 8:00 - 5:00
Date of Pouring : May 8, 2023

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

ROCKY TOM BERNARD S. ROMASANTA ALBIEN M. MAHIA May 8, 2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

Project Inspector : Date


REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: December 30, 1899

Pouring Permit Report


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Contractor : MIDR CONSTRUCTION AND SUPPLIES
Part of Structure Estimated Volume : - cu.m.
to be Poured : Beams
Station Limits/Section: -
Time of Pouring : 8:00 - 5:00
Date of Pouring : December 30, 1899

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

ROCKY TOM BERNARD S. ROMASANTA ALBIEN M. MAHIA December 30, 1899


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

Project Inspector : Date


REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: December 30, 1899

Pouring Permit Report


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Contractor : MIDR CONSTRUCTION AND SUPPLIES
Part of Structure Estimated Volume : - cu.m.
to be Poured : 0
Station Limits/Section: -
Time of Pouring : 8:00 - 5:00
Date of Pouring : December 30, 1899

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

ROCKY TOM BERNARD S. ROMASANTA ALBIEN M. MAHIA December 30, 1899


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

Project Inspector : Date


REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: December 30, 1899

Pouring Permit Report


Name of Project: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay
Masagana, Naujan, Oriental Mindoro
Location : Socorro, Oriental Mindoro
Contractor : MIDR CONSTRUCTION AND SUPPLIES
Part of Structure Estimated Volume : - cu.m.
to be Poured : 0
Station Limits/Section: -
Time of Pouring : 8:00 - 5:00
Date of Pouring : December 30, 1899

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

ROCKY TOM BERNARD S. ROMASANTA ALBIEN M. MAHIA December 30, 1899


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

Project Inspector : Date


REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
PLIES
PLIES
PLIES
PLIES
PLIES
PLIES
PLIES
REPORT ON CONCRETE WORKS

Lab. Number: RCW-CALUBAYAN-900-06

Project:
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: Beams

Station/Station Limits:

==================================================================

Date & Time of Pouring: December 30, 1899 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 14.99 liters
Fine Aggregates: 97.04 cu.m. Coarse Aggregates: 113.05 cu.m. v
Cement used(TOTAL): 0 Bags Vol. of Concrete Poured: 0.00 cu.m. 0.00
Admixture: None cc/ bag of cement #DIV/0!

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - #DIV/0! 9.50
Water, L/bag - - - - - - - - - - - - - - . 14.99 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: BEAMS- 1,2,3,4 & 5
Quantity Represented: 0.00 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES December 30, 1899
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-CALUBAYAN-900-07

Project:
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: 0

Station/Station Limits:

==================================================================

Date & Time of Pouring: December 30, 1899 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 14.99 liters
Fine Aggregates: 97.04 cu.m. Coarse Aggregates: 113.05 cu.m. v
Cement used(TOTAL): 0 Bags Vol. of Concrete Poured: 0.00 cu.m. 0.00
Admixture: None cc/ bag of cement #DIV/0!

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - #DIV/0! 9.50
Water, L/bag - - - - - - - - - - - - - - . 14.99 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: BEAM- 1,2,3,4 & 5
Quantity Represented: 0.00 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES December 30, 1899
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-CALUBAYAN-900-08

Project:
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: 0

Station/Station Limits: 9
2
==================================================================

Date & Time of Pouring: December 30, 1899 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 14.99 liters
Fine Aggregates: 97.04 cu.m. Coarse Aggregates: 113.05 cu.m. v
Cement used(TOTAL): 0 Bags Vol. of Concrete Poured: 0.00 cu.m. 0.00
Admixture: None cc/ bag of cement #DIV/0!

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - #DIV/0! 9.50
Water, L/bag - - - - - - - - - - - - - - . 14.99 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: SS- 1,2,3,4 & 5
Quantity Represented: 0.00 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES December 30, 1899
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-CALUBAYAN-900-09


23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project: Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: 0

Station/Station Limits: 12
4
==================================================================

Date & Time of Pouring: December 30, 1899 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 14.99 liters
Fine Aggregates: 97.04 cu.m. Coarse Aggregates: 113.05 cu.m. v
Cement used(TOTAL): 0 Bags Vol. of Concrete Poured: 0.00 cu.m. 0.00
Admixture: None cc/ bag of cement #DIV/0!

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - #DIV/0! 9.50
Water, L/bag - - - - - - - - - - - - - - . 14.99 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: SOF - 6,7,8,9 & 10
Quantity Represented: 0.00 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES December 30, 1899
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-CALUBAYAN-900-05


23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project: Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: Column
24
Station/Station Limits: 12
4
==================================================================

Date & Time of Pouring: May 8, 2023 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 14.99 liters
Fine Aggregates: 97.04 cu.m. Coarse Aggregates: 113.05 cu.m. v
Cement used(TOTAL): 220 Bags Vol. of Concrete Poured: 23.07 cu.m. 23.07
Admixture: None cc/ bag of cement 9.53619419

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - 9.54 9.50
Water, L/bag - - - - - - - - - - - - - - . 14.99 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: COL - 6,7,8,9 & 10
Quantity Represented: 23.07 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES May 8, 2023
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-BNHS-900(c)-02


23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project: Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: Column
24
Station/Station Limits: (4 - C1, C2, & C3) 350mm x 350mm, G/L ABC - 5, 6, 7 & 8 12
Foundation to Second Floor 4
==================================================================

Date & Time of Pouring: November 3, 2015 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1111 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 14.99 liters
Fine Aggregates: 97.04 cu.m. Coarse Aggregates: 113.05 cu.m. v
Cement used(TOTAL): 126 Bags Vol. of Concrete Poured: 13.98 cu.m. 13.98
Admixture: None cc/ bag of cement 9.01287554

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - 9.01 9
Water, L/bag - - - - - - - - - - - - - - . 14.99 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: COL(5-8) - 1 , 2, 3,4 & 5
Quantity Represented: 13.98 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES November 3, 2015
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS
Lab. Number: RCW-BNHS-900(fgi)-01
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project: Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: #NAME?
#NAME? 24
Station/Station Limits: #NAME? 12
4
==================================================================

Date & Time of Pouring: #NAME? Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger (3 sets)
Method of Mixing: Concrete Mixer Designed Cement Factor: 9 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1111 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 16.83 liters
Fine Aggregates: 95.02 cu.m. Coarse Aggregates: 115.51 cu.m. v
Cement used(TOTAL): ### Bags Vol. of Concrete Poured: #NAME? cu.m. #NAME?
Admixture: None cc/ bag of cement #NAME?

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - #NAME? 9
Water, L/bag - - - - - - - - - - - - - - . 16.83 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: Slab/Beam - 1 , 2, 3,4 & 5
Quantity Represented: #NAME? cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES #NAME?
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS
Lab. Number: RCW-BNHS-900(h)-01
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project: Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: #NAME?
24
Station/Station Limits: 12
4
==================================================================

Date & Time of Pouring: #NAME? Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1111 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 16.83 liters
Fine Aggregates: 95.02 cu.m. Coarse Aggregates: 115.51 cu.m. v
Cement used(TOTAL): ### Bags Vol. of Concrete Poured: #NAME? cu.m. #NAME?
Admixture: None cc/ bag of cement #NAME?

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - #NAME? 9
Water, L/bag - - - - - - - - - - - - - - . 16.83 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: STAIR - 1 , 2, 3,4 & 5
Quantity Represented: #NAME? cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES #NAME?
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-BNHS-900(c)-01


23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project: Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: #NAME?
24
Station/Station Limits: 12
4
==================================================================

Date & Time of Pouring: #NAME? Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1111 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 16.83 liters
Fine Aggregates: 95.02 cu.m. Coarse Aggregates: 115.51 cu.m. v
Cement used(TOTAL): ### Bags Vol. of Concrete Poured: #NAME? cu.m. #NAME?
Admixture: None cc/ bag of cement #NAME?

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - #NAME? 9
Water, L/bag - - - - - - - - - - - - - - . 16.83 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: col - 1 , 2, 3,4 & 5
Quantity Represented: #NAME? cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES #NAME?
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-BNHS-900(e)-01


23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at Barangay Masagana,
Project: Naujan, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: #NAME?
#NAME? 24
Station/Station Limits: 12
4
==================================================================

Date & Time of Pouring: #NAME? Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : One Bagger
Method of Mixing: Concrete Mixer Designed Cement Factor: 9 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1111 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 16.83 liters
Fine Aggregates: 95.02 cu.m. Coarse Aggregates: 115.51 cu.m. v
Cement used(TOTAL): ### Bags Vol. of Concrete Poured: #NAME? cu.m. #NAME?
Admixture: None cc/ bag of cement #NAME?

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - #NAME? 9
Water, L/bag - - - - - - - - - - - - - - . 16.83 liters 22
Slump, mm - - - - - - - - - - - - - - - 100 100 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Cylinder Sample Sample Identification: SOF/RG - 1 , 2, 3,4 & 5
Quantity Represented: #NAME? cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES #NAME?
(Name and Designation) (Office) (Date)

=====================================================================

CHECKED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
VOLUME:
Ftg = 4.20
Column = 1.60

Beam = 1.40
Floorimng = 6.15

130.05

712.5 0

Err:509 15 Err:509
b Err:509 15 Err:509
0 0.00 15 -

12.92 3.25
3.25
22.8 3.25
3.17
VOLUME:
Ftg = 4.20
Column = 1.60

Beam = 1.40
Floorimng = 6.15

130.05

712.5 0

Err:509 15 Err:509
b Err:509 15 Err:509
0 0.00 15 -

0.00 12.92 3.25


3.25
22.8 3.25
3.17
VOLUME:
Ftg = 4.20
Column = 1.60

Beam = 1.40
Floorimng = 6.15

4.5 m 6.075
9.5 m 2.85
8.925

130.05

712.5 0

Err:509 15 Err:509
b Err:509 15 Err:509
0 0.00 15 -

12.92 3.25
3.25
22.8 3.25
3.17
VOLUME:
Ftg = 4.20
Column = 1.60
Beam = 1.40
Floorimng = 6.15

4.5 m 8.1
9.5 m 5.7
13.8
22.725

130.05

712.5 0

Err:509 15 Err:509
b Err:509 15 Err:509
0 0.00 15 -

12.92 3.25
0.00 3.25
22.8 3.25
3.17
VOLUME:
Ftg = 4.20
Column = 1.60
Beam = 1.40
Floorimng = 6.15
#NAME?
2.8 0.1225 8.232 #NAME? #NAME? col gf-1
4.5 m 8.1 #NAME? col gf-2
9.5 m 5.7
13.8
27.6

130.05

712.5 219.165

Err:509 15 Err:509
b Err:509 15 Err:509
219.165 0.00 15 -

12.92 3.25
3.25
22.8 3.25
3.17
VOLUME:
Ftg = 4.20
Column = 1.60
Beam = 1.40
Floorimng = 6.15
#NAME?
2.8 0.1225 8.232 #NAME? #NAME? col gf-1
4.5 m 8.1 #NAME? col gf-2
9.5 m 5.7
13.8
27.6

130.05

712.5 132.81

Err:509 15 Err:509
b Err:509 15 Err:509
125.82 0.00 15 -

12.92 3.25
3.25
22.8 3.25
3.17
37.05
VOLUME:
Ftg = 4.20
Column = 1.60
Beam = 1.40
Floorimng = 6.15
0
2.8 0.1225 8.232 -8.232 -3.7044 col gf-1
4.5 m 8.1 -4.5276 col gf-2
9.5 m 5.7
13.8
27.6

130.05

712.5 #NAME?

Err:509 15 Err:509
b Err:509 15 Err:509
#NAME? 0.00 15 -

12.92 3.25
3.25
22.8 3.25
3.17

VOLUME:
Ftg = 4.20
Column = 1.60
Beam = 1.40
Floorimng = 6.15
0
2.8 0.1225 8.232 -8.232 -3.7044 col gf-1
4.5 m 8.1 -4.5276 col gf-2
9.5 m 5.7
13.8
13.8

130.05

712.5 #NAME?

Err:509 15 Err:509
b Err:509 15 Err:509
#NAME? 0.00 15 -

12.92 3.25
3.25
22.8 3.25
3.17

VOLUME:
Ftg = 4.20
Column = 1.60
Beam = 1.40
Floorimng = 6.15
0
2.8 0.1225 8.232 -8.232 -3.7044 col gf-1
4.5 m 8.1 -4.5276 col gf-2
9.5 m 5.7
13.8
13.8

130.05

712.5 #NAME?

Err:509 15 Err:509
b Err:509 15 Err:509
#NAME? 0.00 15 -

12.92 3.25
3.25
22.8 3.25
3.17

VOLUME:
Ftg = 4.20
Column = 1.60
Beam = 1.40
Floorimng = 6.15
0
2.8 0.1225 8.232 -8.232 -3.7044 col gf-1
4.5 m 8.1 -4.5276 col gf-2
9.5 m 5.7
13.8
27.6

130.05

712.5 #NAME?

Err:509 15 Err:509
b Err:509 15 Err:509
#NAME? 0.00 15 -

12.92 3.25
3.25
22.8 3.25
3.17
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: April 21, 2022


LAB. NUMBER: MPB-CAMANSIHAN-TM-01
PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION AND SUPPLIES April 14, 2022
(Name and Designation) (Office) (Date)
TESTED BY: MQC PERSONNEL DPWH April 21, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC PERSONNEL DPWH April 21, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
TM-A TRIAL MIX 4/14/2022 7 2436 2400
TM-B TRIAL MIX 4/14/2022 7 2451 2400
TM-C TRIAL MIX 4/14/2022 7 2465 2400
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

KEVIN E. GARCIA MERCEDES G. ASPI


Engineer II Engineer III

WITNESSES BY:

MARK IAN M. DELOS REYES


Contractor's ME
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: January 27, 1900


LAB. NUMBER: CALUBAYAN-CT-06
PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES December 30, 1899
(Name and Designation) (Office) (Date)
TESTED BY: MQC PERSONNEL DPWH January 27, 1900
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC PERSONNEL DPWH January 27, 1900
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
BEAM-1 BEAM 12/30/1899 28 3089 3000
BEAM-2 BEAM 12/30/1899 28 3103 3000
BEAM-3 BEAM 12/30/1899 28 3074 3000
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

KEVIN E. GARCIA MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: January 27, 1900


LAB. NUMBER: MPB-CAMANSIHAN-CT-07
PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES December 30, 1899
(Name and Designation) (Office) (Date)
TESTED BY: MQC PERSONNEL DPWH January 27, 1900
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC PERSONNEL DPWH January 27, 1900
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
BEAM-1 BEAM 12/30/1899 28 3103 3000
BEAM-2 BEAM 12/30/1899 28 3132 3000
BEAM-3 BEAM 12/30/1899 28 3147 3000

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

KEVIN E. GARCIA MERCEDES G. ASPI


Engineer II Engineer III

WITNESSED BY:

MARK IAN M. DELOS REYES


Contractor's ME
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: January 27, 1900


LAB. NUMBER: MPB-CAMANSIHAN-CT-08
PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES December 30, 1899
(Name and Designation) (Office) (Date)
TESTED BY: MQC PERSONNEL DPWH January 27, 1900
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC PERSONNEL DPWH January 27, 1900
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
SS-1 SUSPENDED SLAB 12/30/1899 28 3110 3000
SS-2 SUSPENDED SLAB 12/30/1899 28 3060 3000
SS-3 SUSPENDED SLAB 12/30/1899 28 3125 3000
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

KEVIN E. GARCIA MERCEDES G. ASPI


Engineer II Engineer III

WITNESSED BY:

MARK IAN M. DELOS REYES


Contractor's ME
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: January 27, 1900


LAB. NUMBER: MPB-CAMANSIHAN-CT-09
PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES December 30, 1899
(Name and Designation) (Office) (Date)
TESTED BY: MQC PERSONNEL DPWH January 27, 1900
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC PERSONNEL DPWH January 27, 1900
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
SOF-6 SOF 12/30/1899 28 3125 3000
SOF-7 SOF 12/30/1899 28 3129 3000
SOF-8 SOF 12/30/1899 28 3110 3000
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

KEVIN E. GARCIA MERCEDES G. ASPI


Engineer II Engineer III

WITNESSED BY:

MARK IAN M. DELOS REYES


Contractor's ME
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: January 27, 1900


LAB. NUMBER: MPB-CAMANSIHAN-CT-05
PROJECT: 23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES December 30, 1899
(Name and Designation) (Office) (Date)
TESTED BY: MQC PERSONNEL DPWH January 27, 1900
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC PERSONNEL DPWH January 27, 1900
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
COL-1 COLUMN 12/30/1899 28 3118 3000
COL-2 COLUMN 12/30/1899 28 3093 3000
COL-3 COLUMN 12/30/1899 28 3044 3000
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

KEVIN E. GARCIA MERCEDES G. ASPI


Engineer II Engineer III

WIITNESSED BY:

MARK IAN M. DELOS REYES


Contractor's ME
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: December 1, 2015


LAB. NUMBER: BNHS-CCT-02
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
PROJECT: Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES November 3, 2015
(Name and Designation) (Office) (Date)
TESTED BY: A. F. Cabral / Lab Tech I DPWH December 1, 2015
(Name and Designation) (Office) (Date)
COMPUTED BY: A. F. Cabral / Lab Tech I DPWH December 1, 2015
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
COL-1 #REF! 11/3/2015 28 3067 3000
COL-2 #REF! 11/3/2015 28 3085 3000
COL-3 #REF! 11/3/2015 28 3045 3000
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: January 26, 2016


LAB. NUMBER: BNHS-SBCT-01
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
PROJECT: Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES December 29, 2015
(Name and Designation) (Office) (Date)
TESTED BY: A. F. Cabral / Lab Tech I DPWH January 26, 2016
(Name and Designation) (Office) (Date)
COMPUTED BY: A. F. Cabral / Lab Tech I DPWH January 26, 2016
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
SB-1 SUNBREAKER, SLAB & BEAM 12/29/2015 28 3110 3000
SB-2 SUNBREAKER, SLAB & BEAM 12/29/2015 28 3085 3000
SB-3 SUNBREAKER, SLAB & BEAM 12/29/2015 28 3100 3000
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: February 17, 2016


LAB. NUMBER: BNHS-CCT-03
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
PROJECT: Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES January 20, 2016
(Name and Designation) (Office) (Date)
TESTED BY: A. F. Cabral / Lab Tech I DPWH February 17, 2016
(Name and Designation) (Office) (Date)
COMPUTED BY: A. F. Cabral / Lab Tech I DPWH February 17, 2016
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
COL-1 COLUMN SECOND FLOOR 1/20/2016 28 3050 3000
COL-2 COLUMN SECOND FLOOR 1/20/2016 28 3065 3000
COL-3 COLUMN SECOND FLOOR 1/20/2016 28 3045 3000
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
WITNESSED BY:

Contractor's Representative

Republic of the Philippines


Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: February 11, 2016


LAB. NUMBER: BNHS-SCT-01
23ED0074 Construction (Completion) of Multi - Purpose Building (Covered Court) at
PROJECT: Barangay Masagana, Naujan, Oriental Mindoro
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION AND SUPPLIES January 14, 2016
(Name and Designation) (Office) (Date)
TESTED BY: A. F. Cabral / Lab Tech I DPWH February 11, 2016
(Name and Designation) (Office) (Date)
COMPUTED BY: A. F. Cabral / Lab Tech I DPWH February 11, 2016
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
STAIR-1 STAIR 1/14/2016 28 3074 3000
STAIR-2 STAIR 1/14/2016 28 3068 3000
STAIR-3 STAIR 1/14/2016 28 3085 3000
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:


CARLO C. MANALO MERCEDES G. ASPI
Engineer II Engineer III

WITNESSED BY:

Contractor's Representative

Republic of the Philippines


Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: March 3, 2016


LAB. NUMBER: BNHS-SOF/RG-CT-01
PROJECT: #REF!
KIND OF SAMPLE: Conc. Cylinder Sample Spec,'s. Item Number: 900 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 3000 Psi
SAMPLED BY: Contractor"s Personnel #REF! February 4, 2016
(Name and Designation) (Office) (Date)
TESTED BY: A. F. Cabral / Lab Tech I DPWH March 3, 2016
(Name and Designation) (Office) (Date)
COMPUTED BY: A. F. Cabral / Lab Tech I DPWH March 3, 2016
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Psi Psi
SOFRG-1 SOR & ROOF GIRDER 2/4/2016 28 3125 3000
SOFRG-2 SOR & ROOF GIRDER 2/4/2016 28 3100 3000
SOFRG-3 SOR & ROOF GIRDER 2/4/2016 28 3090 3000
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:


CARLO C. MANALO MERCEDES G. ASPI
Engineer II Engineer III

WITNESSED BY:

Contractor's Representative